Thông tin tài liệu
PROJECT MONG DUONG THERMAL POWER PLANT VIETNAM SITE ADRESS ZONE 3, MONG DUONG EWARD CAM PHA TOWN, QUANG NINH PROVINCE BRICKWORK ORDER 1500 CLIENT SEGMENT VIET NAM ELECTRICITY SAFETY HAND RAIL HEAD OFFICE: HOAN KIEM DISTRICT, HANOI CITY PHONE: (84-4) 2.2201371 FAX (84-4) 2.2201369 WEBSITE: www.evn.com.vn BRICK CONTRACTOR 1500 SEGMENT MORTAR POT SCAFFOLDING 1500 HUYNDAI ENGINEERING AND CONSTRUCTION CO., LTD SUB CONTRACTOR BRICK VINACONEX ENGINEERING CONSTRUCTION & INVESTEMENT., JSC HEAD OFFICE: 34 LANG HA TOWER, DONG DA, HANOI PHONE: 04.377.65.888 FAX: 04.377.65.999 WEBSITE: VINACONEXEC.COM.VN SEGMENT MORTAR POT 1500 1530-1730 1500 DRAWING BY SCAFFOLDING CHECKED BY APPROVED BRICK 220 220 1200 220 1200 NOTES: - THE MASONRY SHALL BE LOCATED DURING THE CONSTRUCTION WITH OPENING FOR THE PIPES OF WATER SUPPLY&DRAINAGE, ELECTRIC, AIR CONDITIONING SYSTEMS - THE LOCATING OF OPENINGS, ANCHORING BOLTS SHALL BE IN COMPLIANCE WITH THE DESIGN BEFORE LAYING THE BRICKS THE BRICKS SHALL BE WATER OR MOISTURIZED BEFORE THE CONSTRUCTION - THE BRICK SHALL BE WATER OR MOISTURIZED BEFORE THE CONSTRUCTION - THE INTERSECTION OF THE MASONRY SHOULD BE WATERED AND CLEANED - THE BRICK SHALL BE LAID IN THE HORIZONTAL DIRECTION WITH MORTAR WITH MORTAR IN JOINTS THE THICKNESS OF JOINTS SHALL NOT BE THAN GREATER THAN 10MM - THE PULLING OPENING SHALL BE MET WITH TECHNICAL SPECIFICATIONS AND LOCATION FOR ACCURACY - NO BROKEN BRICKS SHALL BE USED FOR THE CONSTRUCTION OF HORIZONTAL BLOCKS - IN ORDER TO ENSURE THE FLATNESS OF THE WALLS, THE LINES AND SQUARE RULER SHALL BE USED FOR THE CONSTRUCTION OF BOTH WALL SIDES ISSUED FOR REFRENCE DESIGN METHOD STATEMENT SHOPDRAWING AS-BUILT PACKAGE CIVIL STRUCTURE WORKS ITEM FINISHING WORK DRAWING TITLE BRICK WORK METHOD SCALE: FIT DATE: REVISION: 22/02/2012 DWG NO: MS - 016 PROJECT column locating MONG DUONG THERMAL POWER PLANT VIETNAM SITE ADRESS ZONE 3, MONG DUONG EWARD CAM PHA TOWN, QUANG NINH PROVINCE CLIENT 1000 transmitting the high level by leveling and rule through staircase VIET NAM ELECTRICITY HEAD OFFICE: HOAN KIEM DISTRICT, HANOI CITY PHONE: (84-4) 2.2201371 FAX (84-4) 2.2201369 surveying rule WEBSITE: www.evn.com.vn CONTRACTOR leveling HUYNDAI ENGINEERING AND CONSTRUCTION CO., LTD SUB CONTRACTOR 1000 VINACONEX ENGINEERING CONSTRUCTION & INVESTEMENT., JSC mark HEAD OFFICE: 34 LANG HA TOWER, DONG DA, HANOI PHONE: 04.377.65.888 FAX: 04.377.65.999 WEBSITE: VINACONEXEC.COM.VN DRAWING BY CHECKED BY APPROVED center mark on top rc column transmitting the high level by leveling and rule REFRENCE ISSUED FOR rule DESIGN METHOD STATEMENT SHOPDRAWING AS-BUILT leveling 1000 PACKAGE mark mark CIVIL STRUCTURE WORKS ITEM floor level FINISHING WORK DRAWING TITLE COLUMN LOCATING SCALE: FIT DATE: REVISION: 22/02/2012 DWG NO: MS - 017 PROJECT mortar processing serving for finishing work MONG DUONG THERMAL POWER PLANT VIETNAM SITE ADRESS COLUMN ZONE 3, MONG DUONG EWARD CAM PHA TOWN, QUANG NINH PROVINCE CLIENT LINK STEEL WALL VIET NAM ELECTRICITY MOTAR POT HEAD OFFICE: HOAN KIEM DISTRICT, HANOI CITY PHONE: (84-4) 2.2201371 FAX (84-4) 2.2201369 BRICK WEBSITE: www.evn.com.vn CONTRACTOR HUYNDAI ENGINEERING AND CONSTRUCTION CO., LTD - BEFORE PLASTERING, THE WALL IS CLEANED AND WATERED - THE WALL'S SURFACE MUST MEET TECHNICAL REQUIRES - USING ALUMINIUM RULE TO CHECK THE WALL'S SURFACE SUB CONTRACTOR MARKING VINACONEX ENGINEERING CONSTRUCTION & INVESTEMENT., JSC HEAD OFFICE: 34 LANG HA TOWER, DONG DA, HANOI PHONE: 04.377.65.888 FAX: 04.377.65.999 WEBSITE: VINACONEXEC.COM.VN MORTAR POT DRAWING BY CHECKED BY APPROVED notes: - MORTAR IS MIXED BY MACHINE MEETING DESIGNED GRADE - MORATR PROCESSING IS INSPECTED BY SITE ENGINEER - MATERIAL IS MEASURED BY DEDICATED POT TRANSPORTING LINE - MATERIAL IS TRANSPORTED VERTICALLY BY ELEVATOR AND HORIZONTALLY BY CART AGGREGATE PRECAUTION OF PROPORLIONING SIEVE USING ELEVATOR MIXER CART ELEVATER DESIGN ISSUED FOR CEMENT CEMENT CEMENT CEMENT REFRENCE METHOD STATEMENT SHOPDRAWING AS-BUILT PACKAGE CIVIL STRUCTURE WORKS METERIAL POT PRECAUTION FOR USING ELEVATOR ITEM FINISHING WORK - NOT USING ELEVATOR TO TRANSPORT WORKERS - ONLY OPERATOR IS PERMITTED TO CONTROL - REQUIRING SWITCH OFF ELECTRIC WHEN NOT USING DRAWING TITLE MOTAR PROCESSING SERVING FOR FINISHING WORK AND LIFTING FLOOR' POSITION MUS BE AT GROUND SCALE: - WHEN OPERATING, WORKERS NOT WALKING BELOW THE LIFTING FLOOR FIT DATE: REVISION: 22/02/2012 DWG NO: MS - 018 PROJECT MONG DUONG THERMAL POWER PLANT FINISHING WORK - PLASTERING, PAVING AND VERNEERING VIETNAM SITE ADRESS ZONE 3, MONG DUONG EWARD CAM PHA TOWN, QUANG NINH PROVINCE FLOOR TILING METHOD CLIENT VIET NAM ELECTRICITY PLASTERING MARK HEAD OFFICE: HOAN KIEM DISTRICT, HANOI CITY PHONE: (84-4) 2.2201371 FAX (84-4) 2.2201369 WEBSITE: www.evn.com.vn CONTRACTOR LIN E HUYNDAI ENGINEERING AND CONSTRUCTION CO., LTD ING MARK T IL SUB CONTRACTOR VINACONEX ENGINEERING CONSTRUCTION & INVESTEMENT., JSC MARKING TILE LINE NOTES: WEBSITE: VINACONEXEC.COM.VN THE TILE PIECES SHALL NOT BE BROKE, CANTING WITH OTHER DEFECTS ON THE SURFACE THE EDGE OF THE CUT TILES SHALL BE FLAT COLUMN PLASTERING HEAD OFFICE: 34 LANG HA TOWER, DONG DA, HANOI PHONE: 04.377.65.888 FAX: 04.377.65.999 DRAWING BY CHECKED BY THE PAVING PLAN SHALL BE FLAT WITHOUT ANY CONCAVENESS OR CONEXITY AND SHALL BE CHECKED WITH METTER LONG RULER APPROVED THE GRADIENT AND DIRECETION OF THE PAVING WORK SHALL BE CHEKED BY POURING WATER THE PAVING WORK SHALL NOT BE HIT WITH CRASHES WHEN THE JOINTS HAVE NOT BEEN WEDGED YET THE CEMENT MORTAR SHALL BE PUT INTO THE INSERTIONS OF PAVING PARTS AND BASE SHOES WALL PLASTERING PLASTERING MARK WALL TILING WORK
Ngày đăng: 28/05/2018, 00:30
Xem thêm: