Xây dựng Tầng hầm sâu và quy mô lớn các cấu trúc ngầm.Ví dụ về các cấu trúc dưới lòng đất. Tầng hầm của các tòa nhà. Bán Tầng hầm với mục đích ổn định độ dốc.
Trang 1Basement Construction
Trang 2Part Ï —
General understanding about the Construction of Basement
Trang 3Construction of Deep Basement and
Large-sized Underground Structures
Examples of underground structures
Trang 4Construction of Deep Basement and
Large-sized Underground Structures
Involvement/provision when constructing these
Structures
Trang 7) Dee _á„-,.Z `
is 4 7
a “Wie real aw sỹ 1 ee ` s4 ?
Trang 8ws = hb EE —
Trang 10Methods for basement construction
Basement or similar underground structures can be constructed using the following approaches:
Trang 11- suitable for site with abandon of unobstructed working space
| west E Z _ es
-_—" „ 4 ¬ ĐỘ ;
Trang 12- suitable for basement of small to medium size
Trang 13
Construction of basement using Bottom-up
Trang 14suitable for basement of very large size with complex environment
Trang 15Construction of basement using Top-down approach
LEE GARDENS
REDEVELOPMLN! SEQUENCE OF TO? DOWN TECHNIC
—
- STAGE 2
Erection of Sice! Szucture for Tơ œe? Coru>vwetios
Excavz!:^^ ͜ \ Coenvguct:+o* of \
B^/£ \ Corsirectios of TY i Core Wall with
Trang 16Compare the features of various
basement construction methods
Protection Simplest protection |Complex lateral Limited shoring
Support required — |support where req’d
Trang 17Other consideration
Trang 19Attributes that affect the construction of deep
basement:
Trang 20HỆ i
imity lose prox!
Trang 22Basement Project in very congested urban environment — the Redevelopment of Kwong On Bank in Queen’s Road Central,
Central District, Hong Kong
= Ty
VHA,
isis MUM)
Trang 23Examples of very difficult
environment for
constructing basement
Trang 24Complicated soil support arrangement
Trang 26
Special performance requirements imposed
Complete the whole or part of the work at a prescribed time or at Stages for handing back to the client
Protect some facilities according to prescribed requirements during
the course of work
Coordinate with some other contracts or contractors to have related
works carried out in the same or In close proximity of site
The nature of work required exceptionally high quality or accuracy in performance
Very high liquidated damages requirements is imposed in the
confract
Trang 27where a new basement is required to construct
simultaneously to replace an old one
working under fast-track schedule,
some basement works need to be carried out at the same time with the new foundation or even with part of the future superstructure
Trang 28Complicated phasing arrangement in _ constructing the basement of Lee Garden
Trang 29Complicated Construction arrangement — demolition of the old basement, construction of the future building cap and core, erection of the new ground slab as top-down for the basement, working at the
same time
The Lee Garden Redevelopment case
Trang 30Cheung Kong Center — foundation and core wall work at the same time with the top-down basemetn
>: tt
XS
7 >> “
Trang 31The Center - Foundation and Basement construction arrangement
Trang 32Common managerial problems identified in the
construction of deep basement:
Trang 33There are many methods to construct large- scaled and deep basement
Trang 34Redevelopment of
the Lee Theatre
Construction of basement using
traditional bottom-up
arrangement
Church for the Witness of the Christ Project
Trang 35Example of very large-scale and complicated project — the Hang Hau Station of the MTR Tseung Kwan O Line
Trang 36Example of very large-scale project — the Kowloon Station of the Airport Railway
Trang 37Other considerations when doing basement works
Trang 38Commonality found in recent basement projects
Trang 39An extremely large-scale and complex project —
Construction of the International Finance Centre Phase II
(Top-down for the podium portion and bottom up for the building core portion)
Trang 41Examples of very complicated phasing arrangement during the basement construcfion
Trang 42Commonality found in recent basement projects (Cont.)
Trang 43Special arrangement for the removal of spoil to facilitate basement excavation
Trang 44Commonality found in recent basement projects (Cont.)
Trang 45Basement construction using “Double Bit” arrangement — 1.e construct two levels of basement and fill in the
intermediate level at a later stage
Trang 46The construction of basement bears a very spectacular Status in the entire construction process It often marks
the success of a project in terms of:
- profitability,
- ensurance of contract time,
- quality and safety considerations
Various professions would have their own involvement in the basement construction process and each of them has their own concerns It is not easy to formulate a simple yet Straight forward solution to get everything right
Better understanding of the variety of possible methods and practices, as well as knowing the constraints when handling basement works, there is higher chance to complete the work with a more acceptable result - >
Trang 47Conclusion (Cont.)
Trang 48Redevelopment of the URC’s site at Mong Kok — using top-down and bottom-up mixed method
Trang 49Land Renewal Council’s site at Mong Kong — the input of large
amount of resources (mechanical plants) may not help much in very complicated basement project)
' š ` ; ba rr " et Ay: 5 '