A9120 BSC installation manual HUAWEI EQUIPMENT INSTALLATION

90 349 0
A9120 BSC installation manual HUAWEI EQUIPMENT INSTALLATION

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

Thông tin tài liệu

ALCATEL BSS A9120 BSC with multipair cables Installation Manual 3BK 20464 0001 RJZZA Ed.06 BLANK PAGE BREAK Status RELEASED Short title INS All rights reserved Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel/Evolium / 90 3BK 20464 0001 RJZZA Ed.06 Contents Contents Preface General Information 1.1 Hardware Description 1.1.1 General Information 1.1.2 Racks Configuration 1.1.3 Weight and Dimensions 1.2 Restrictions 1.3 Prerequisite 1.4 Initial State 1.5 Final State 1.6 Operating Principle 1.7 Time Schedule 1.8 Information Required Preliminary Checks 2.1 Before Leaving for the Site 2.2 Before Starting (on Arrival at the Site) Racks installation 3.1 Rack Delivery 3.2 Mechanical Assembling 3.2.1 Racks Positioning 3.2.2 Racks Assembling 3.2.3 Top Structures Fitting 3.2.4 Side Panels Fitting Connecting DC Filters to the Racks Option : Changing from 3–Wire to 2–Wire DC Power 27 Installing the Cable Tray 6.1 Normal Floor and Site Cable Tray Higher than 2.60 Meters 6.2 Normal Floor and Site Cable Tray Lower than 2.60 Meters 6.3 Raised Floor Installing Power Cables Inter-Rack Cabling (for Extension Racks) 49 10 PCM Cables Installation 9.1 Running Cables in the Cable Tray 9.2 Cable Routing at Back of Rack (Principle) 9.3 Fitting Cables in the First Half Cable Clamp 9.4 Connecting Cables to the Racks 9.5 Connecting Cables to the DDF 9.6 PCM Cable Testing Connecting Communication Cables 11 Option: Installing Alarm Cables 75 12 79 80 82 83 Finishing Installation 12.1 Mechanical Assembly Finishing 12.2 Finishing Appendix A : Abbreviations 8 11 11 11 11 12 12 13 13 15 16 16 17 18 19 19 21 22 23 25 31 32 34 35 41 53 54 55 57 59 64 69 71 Appendix B : List of Items Required 85 Appendix C : Alcatel IDC Terminal Block Fitting 89 3BK 20464 0001 RJZZA Ed.06 / 90 Contents / 90 3BK 20464 0001 RJZZA Ed.06 Preface Preface Purpose This document describes how to install on site a A9120-BSC with mutipair cables of ALCATEL 900/1800 subsystem Audience Installers Site administrators Supervisors Project managers Field service technicians Occasional users Assumed Knowledge Basic knowledge of Alcatel BSS equipment Experience of electrical mounting and cabling 3BK 20464 0001 RJZZA Ed.06 / 90 Preface / 90 3BK 20464 0001 RJZZA Ed.06 General Information General Information This chapter provides general information about the operating principle and requirements of the procedure Hardware Description Restrictions Prerequisite Initial State Final State Time Schedule Information Required 3BK 20464 0001 RJZZA Ed.06 / 90 General Information 1.1 Hardware Description 1.1.1 General Information Figure 1: Examples of site installation / 90 3BK 20464 0001 RJZZA Ed.06 General Information 1.1.2 Racks Configuration Figure 2: Example of rack A (front view) 3BK 20464 0001 RJZZA Ed.06 / 90 General Information Figure 3: Example of extension rack B, C or D (front view) The configuration and number of racks depend on the customer options, available links / rack are shown in the table below: 10 / 90 3BK 20464 0001 RJZZA Ed.06 11 Option: Installing Alarm Cables Figure 61: Alarm inputs – 214 08117 DA cable scheme Figure 62: 214 08117 DA cable wiring on Alcatel terminal block 76 / 90 3BK 20464 0001 RJZZA Ed.06 11 Option: Installing Alarm Cables All cables running in or out the system must cross the electrical shielding via the EMS cable clamp Place Cables in the Cable Holders Remove 25 mm of insulation (3.20 m from the connector) Fit cables through the EMS cable clamp (top of rack) Attach the cables with cable ties Run the cables to the BCLA units at the rear of the rack Connect Cables to the Racks Run Cables on the Cable Tray Connect Cables to the Alarm DDF Mark and connect the cables according to the table Tie the cables to the rack Label BSC plug position Cable reference X09 07::57BA01 214 08117 DAAA Run the cables together on the cable tray Tie the cables to the cable tray Label and cut all the cables nearly to the right length Connect the colour-coded wires to the terminal blocks (see annex) Connect the drain of the input cable to the first pair (see Figure 62 on Alcatel DDF) Connect the drain of the output cable to the frame (or to the lateral side of Alcatel terminal block) Cut the drain of the alarm input cable Cut unused wires of the cables Label the terminal blocks (Alarm input and alarm output) Connect the Jumpers to the Terminal Blocks Make and fit short jumpers on the Alcatel side of the input terminal block (see example on Alcatel DDF, in Figure 62 ) Make and fit jumpers to the customer side of the input terminal block (see example on Alcatel DDF, in Figure 62 ) 3BK 20464 0001 RJZZA Ed.06 77 / 90 11 Option: Installing Alarm Cables 78 / 90 3BK 20464 0001 RJZZA Ed.06 12 Finishing Installation 12 Finishing Installation This chapter describes : the finishing of mechanical installation the labeling of rack tidying up the site 3BK 20464 0001 RJZZA Ed.06 79 / 90 12 Finishing Installation 12.1 Mechanical Assembly Finishing 80 / 90 3BK 20464 0001 RJZZA Ed.06 12 Finishing Installation Procedure Fit the header panels of the rack: — Position the header panel under the horizontal bar of the rack — Insert the threaded pins of the header panels in the top structure — Screw using the plastic spherical handle (tighten moderately) Assemble the racks together Fit the cross member assembly between the racks (if extension racks have to be installed) Install the front rack upper grid Assemble the top cable clamps: — Close the unused entries with dummy pieces of cable — Fit the clamp in the right position — Tighten the clamps together Install the rear rack upper grid Install the front and rear doors: — slide the bottom part of a door onto its hinge, at the bottom of the rack — pull the sliding rod (3) and install the door on the hinge (2) at the top of the rack Label the front part of the racks: — the ALCATEL logo — the name of the product 9000/1800 A9120 BSC — the number of the BSC on the site — the letter identifying the rack in the row (Example: A for BSC rack A) Even if the site already has several older generation G1-BSCs, the BSC number does not depend on the generation of the product; you cannot therefore have for example a G1-BSC number 01 and a A9120-BSC number 01 This number should be found in the site documentation A =13 mm ; B = 16 mm ; C = 13 mm Label the side panel of rack A and the rack on the right: — The ALCATEL logo in the vertical axis of the rack — The number of the BSC on the site in the vertical axis of the rack 3BK 20464 0001 RJZZA Ed.06 81 / 90 12 Finishing Installation A = 20 mm ; B = 165 mm 12.2 Finishing Close the doors Clear away packaging Clean the site Leave the rack key to the door 82 / 90 3BK 20464 0001 RJZZA Ed.06 Appendix A : Abbreviations Appendix A: Abbreviations 3BK 20464 0001 RJZZA Ed.06 Ater Interface PCM link between TC and BSC Abis Interface PCM link between BTS and BSC BSC Base Station Controller BSS Base station subsystem BTS BaseTransceiver Station CCL Completion check list CEL Premise inspection form DC Direct current DDF Digital distribution frame EMS Electro-mechanical shielding FRD Failure report GND Ground (earth) GSM Global system for mobile communications ITL-PRO Procedure technical and support information IO Instruction Operation PCM Pulse Code Modulation TC Transcoder 83 / 90 Appendix A : Abbreviations 84 / 90 3BK 20464 0001 RJZZA Ed.06 Appendix B : List of Items Required Appendix B: List of Items Required Installation Kits The following table is used to check, on site, the mandatory or optional delivery item kits The used symbols are: • mandatory kit ∇technical choice kit ◊ customer option kit Materials for basic rack A Mnemo Reference Qty • Basic kit BAS-S 3BK 07702 ABAA ∇ Top structure ∇ 75 Ohms IK1 3BK 08772 AA ∇ 120 Ohms IK2 3BK 08772 AB ∇ Top structure (EDGE compatible) ∇ 75 Ohms IK7 3BK 08772 AG ∇ 120 Ohms IK8 3BK 08772 AH • Ironwork kit IK3 3BK 08772 AC • DC power bus cables ∇ for lenght < 20 m • 16 mm2 blue m BL16 1AC 00147 0001 • 25 mm2 black m BK25 1AC 00647 0001 • 25 mm2 yellow/green m YG25 1AC 00647 0003 ∇ for 20 m < lenght < 40 m • 35 mm2 blue m BL35 1AC 01723 0002 • 50 mm2 black m BK50 1AC 00465 0001 • 50 mm2 yellow/green m YG50 1AC 00465 0003 • Communication cable ∇ X21 (OMC-R) X21 3BK 07784 JA Options with rack A Mnemo Reference Qty ◊ m cable tray kit (vertical tray) CTKG2 3BK 08773 AA ◊ 1m top rack cable tray (horizontal tray) CTSG2 3BK 08773 AB Provided in 100 or 250 m reels 3BK 20464 0001 RJZZA Ed.06 85 / 90 Appendix B : List of Items Required Options with rack A Mnemo Reference Qty ◊ Alarm cables ◊ Alarm output cable EAOC 3BK 08769 JA ◊ Alarm input cable EAIC 214 08117 DA ◊ wire to wire kit IW2 3BK 07797 AB ◊ DDF • DDF meter for x MP24 DDF 1AD 02846 0001 • Mechanical part for 24 x JS10 MP24 1AD 02843 0001 • Terminal block 10 pairs JS10 1AD 06634 0011 24 • Label for 24 x JS10 LAB 1AD 02854 0001 ◊ Jumpers for DDF ∇ 120 Ohms / pair (L904) L904/1 1AC 00369 0008 roll ∇ 75 Ohms / coax (FLEX3) FLEX3/1 1AC 00362 0001 roll (provided in 100m rolls ) Kit for extension rack B, C Mnemo Reference Qty • Extension kit BAS-E 3BK 07703 AB 1/rack ∇ Top structure ∇ 75 Ohms IK1 3BK 08772 AA 1/rack ∇ 120 Ohms IK2 3BK 08772 AB 1/rack ∇ Top structure (EDGE compatible) ∇ 75 Ohms IK7 3BK 08772 AG 1/rack ∇ 120 Ohms IK8 3BK 08772 AH 1/rack • Ironwork kit IK4 3BK 08772 AD 1/rack • Cable tray 0.95 cm (horizontal) CTEG2 3BK 08773 AC 1/rack • Inter-rack cable kit ∇ between rack A and rack B CINE 3BK 06691 AA 1/rack B ∇ between rack A and rack B and rack C CINE 3BK 06691 AB 1/rack C ◊ wire to wire kit IW2 3BK 07797 AB 1/rack 86 / 90 3BK 20464 0001 RJZZA Ed.06 Appendix B : List of Items Required • PCM cables Reference Rack A Rack B Rack C ∇ 75 Ohms .• 20 m • 12 coax 3BK 08753 HA 4 • coax 3BK 08752 HA 4 .• 30 m • 12 coax 3BK 08753 JA 4 • coax 3BK 08752 JA 4 .• 40 m • 12 coax 3BK 08753 JL 4 • coax 3BK 08752 JL 4 .• 60 m • 12 coax 3BK 08753 KH 4 • coax 3BK 08752 KH 4 ∇ 120 Ohms .• 20 m • 12 coax 3BK 08755 HA 4 • coax 3BK 08754 HA 4 .• 30 m • 12 coax 3BK 08755 JA 4 • coax 3BK 08754 JA 4 .• 40 m • 12 coax 3BK 08755 JL 4 • coax 3BK 08754 JL 4 .• 60 m • 12 coax 3BK 08755 KH 4 • coax 3BK 08754 KH 4 3BK 20464 0001 RJZZA Ed.06 87 / 90 Appendix B : List of Items Required Consumable Supplies The following table is used to check, at base, the availability of the installer’s consumable supplies (not included in Alcatel kits) Item Qty Indelible marker Set of rubber sleeves for all cables Set of tie wraps (different sizes) Set of lugs Adhesive tape Set of blank labels for cables Documents Required The following table is used to check, at base, the availability of the necessary documents Applicable notification list (ITL-PRO) 3DF 00462 0004 AAAGA Applicable operation instructions (IO) 3DF 00300 0004 UAZZA General Wiring Handbook 3BK 17160 0001 RJZZA Tools catalogue for field activity 3BK 20458 0001 RJZZA Site premises inspection form (CEL) 8BL 00704 0015 DRBRA Completion Check List (generic) (CCL) 3BK 17200 0002 QZZZA Specification for site preparation (SPP27) 8BL 00704 0018 DRBRA BSS site premises inspection, post handover 8BL 00704 0016 DRBRA Installation method of DDF for BSS equipment 3DF 00435 0033 RJZZA Part volume CDD T17/V12 3DF 00424 0017 ADBRQ Tools Required The following table is used to check, at base, the availability of the necessary tools (See ” Tools catalogue ” for content checking) Kit name Reference Calibration Basic kit OUT 001 no 88 / 90 3BK 20464 0001 RJZZA Ed.06 Appendix C : Alcatel IDC Terminal Block Fitting Appendix C: Alcatel IDC Terminal Block Fitting 3BK 20464 0001 RJZZA Ed.06 89 / 90 Appendix C : Alcatel IDC Terminal Block Fitting For 120 Ohms Insert the jack strip Check the positioning Prepare the end of the cable without stripping the wires Pass the pair through the lateral hole Insert the first wire Connect the wire with the special tool Connect the second wire Pass the drain wire Drain wire detail of mounting 10 Connect the Drain wire with the special tool 90 / 90 3BK 20464 0001 RJZZA Ed.06 ... rack’s earth Check availability of Alcatel kits See Installation Kits (in appendix B) 16 / 90 3BK 20464 0001 RJZZA Ed.06 Racks installation Racks installation This chapter describes how to : Move... operation, contact the ALCATEL person responsible for the installation and record it in the CCL document 1.4 Initial State The racks and installation kits are packed and delivered on site The site... 20464 0001 RJZZA Ed.06 Preface Preface Purpose This document describes how to install on site a A9120- BSC with mutipair cables of ALCATEL 900/1800 subsystem Audience Installers Site administrators

Ngày đăng: 28/06/2017, 15:15

Từ khóa liên quan

Tài liệu cùng người dùng

Tài liệu liên quan