HUAWEI EQUIPMENT INSTALLATION

52 252 0
HUAWEI EQUIPMENT INSTALLATION

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

Thông tin tài liệu

ALCATEL BSS A9120 BSC With Multipair Cables Extension Manual 3BK 17186 0002 RJZZA Ed.05 BLANK PAGE BREAK Status RELEASED Short title INS All rights reserved Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel/Evolium / 52 3BK 17186 0002 RJZZA Ed.05 Contents Contents Preface General Information 1.1 Hardware Description 1.1.1 General Information 1.1.2 Racks Configuration 1.1.3 Weight and Dimensions 1.2 Restrictions 1.3 Prerequisite 1.4 Initial State 1.5 Final State 1.6 Operating Principle 1.7 Time Schedule 1.8 Information Required Preliminary Checks 2.1 Before Leaving for the Site 2.2 Before Starting (on Arrival at the Site) Racks Installation 3.1 Rack Delivery 3.2 Mechanical Assembling 3.2.1 Preparing the Rack Already in Operation 3.2.2 Racks Positioning 3.2.3 Racks Assembling 3.2.4 Top Structures Fitting 3.2.5 Right Side Panel Installation 3.2.6 Horizontal Cable Way Installation Inter-Rack Cabling 8 10 10 10 10 10 11 12 12 13 14 14 15 16 18 18 20 21 22 22 23 25 PCM Cables Installation 5.1 Cable Installation in the Cable Way 5.2 Cable Routing at Back of Rack 5.3 Connecting to the Extension Racks 5.4 PCM Cable Testing Power Cables Connecting 6.1 Option: Case of 2-Wire Power System 6.2 Case of 3-Wire Power System Connection (Standard Installation) 6.3 Test the Power Supply Finishing Installation 7.1 Mechanical Assembly Finishing 7.2 Finishing Appendix A : Abbreviations 29 30 30 31 34 35 36 39 41 43 44 46 47 Appendix B : List of Items Required 49 3BK 17186 0002 RJZZA Ed.05 / 52 Contents / 52 3BK 17186 0002 RJZZA Ed.05 Preface Preface Purpose Audience This document describes how to extend on site a A9120 BSC with mutipair cables of ALCATEL BSS (one or two racks) This document is intended for: Installers Site administrators Supervisors Project managers Field service technicians Occasional users Assumed Knowledge You must have a basic understanding of the following: Basic knowledge of Alcatel BSS equipment Experience of electrical mounting and cabling 3BK 17186 0002 RJZZA Ed.05 / 52 Preface / 52 3BK 17186 0002 RJZZA Ed.05 General Information General Information This chapter provides general information about the operating principle and requirements of the procedure Hardware Description Restrictions Prerequisite Initial State Final State Time Schedule Information Required 3BK 17186 0002 RJZZA Ed.05 / 52 General Information 1.1 Hardware Description 1.1.1 General Information Rack A Rack B Rack C Rack D Power supply Figure 1: Examples of Site Installation / 52 3BK 17186 0002 RJZZA Ed.05 General Information 1.1.2 Racks Configuration 09 1 21 23 25 33 35 41 45 47 49 53 55 6 SAU 01 TR U S W C H S W C H S W C H S W C H S W C H S W C H S W C H S S S S W D C W W W C D C C C C H H H H GS G S GS2 GS2 GS2 GS2 GS GS2 /0 /1 /2 /3 /4 / /6 /7 S W C H S W C H S W C H S W C H S S S S W D C W W W C D C C C C H H H H G S G S G S G S2 G S G S2 G S2 G S 2 /0 2/ /2 2/ /4 /5 2/6 /7 S W C H S W C H S W C H S W C H S W D C C D C H SAU 02 G S G S G S G S G S G S G S G S2 /0 / /2 /3 /4 /5 /6 /7 D C D C SAU 03 SAU 04 SAU 05 AI R B A FF L E 09 1 21 23 25 33 35 4 47 53 55 6 D C D C S W C H S W C H S W C H S W C H S W C H S W C H D D D T T T D A T S AS AS 02 02 S W C H S W C H S W C H S W D C C D C H D D D D A T T T T S C C C C M C C C C M C C C C B C C C C B 02 23 QA D C D C 02 26 B I U A QA G S G S G S G S G S G S G S G S1 /0 /1 0/2 /3 /4 /5 /6 /7 T D C S D C C A 24 B I U A T C U C 27 QA T T D C D C T T T T S W C H S W C H D D D D T T T T AS AS 30 T A S C C C C M C C C C M C C C C B C C C C B T S 03 32 33 QA 034 C C C C C C U U U U C C C C C W W D C D U C C D C D C H H 01 01 01 T T T T T T C C C C C C U U U U U U C C C C C C 01 T C U C 01 AS 035 03 01 S W C H S S S S W D C W W W C D C C C C H H H H SAU 06 QA B C L A SAU 07 R ACK M S AS 01 03 B C L A S C C C U U U C C C 01 D D D D A T T T T S S W C H S W C H S W C H S W C H S W D C C D C H SAU 08 G S G S G S G S G S G S G S2 G S 0/0 0/ /2 /3 0/4 0/5 0/6 /7 DC converter removed, starting from rack variant 3BK 06796 AAAC Figure 2: Example of Extension Rack B, C or D (Front View) 3BK 17186 0002 RJZZA Ed.05 / 52 General Information 1.1.3 Weight and Dimensions Width 1000 mm Depth 700 mm Height (with 50 mm eyebolts for craning) 2100 mm Weight ≈ 360 kg (maximum configuration) 1.2 Restrictions None 1.3 Prerequisite The site conforms to the "safety rules" of General Wiring Handbook The site is ready to receive the racks, according to the SPP 27 1.4 Initial State Before starting the extension: The racks and installation kits are packed and delivered on site Rack A or Rack A+rack B or Rack A+rack B +rack C are already in operation 1.5 Final State After finishing the extension: The extension racks are ready for commissioning The extension racks are not powered up All the PCM cables between rack and site DDF must be installed for each rack The internal cables are installed but not connected to operational racks 10 / 52 3BK 17186 0002 RJZZA Ed.05 Power Cables Connecting Before Figure 23: Rear View of Top Filter Unit for - Wire Sistem After Figure 24: Rear View of Top Filter Unit for - Wire Sistem 38 / 52 3BK 17186 0002 RJZZA Ed.05 Power Cables Connecting 6.2 Case of 3-Wire Power System Connection (Standard Installation) Nr Materials Reference Kit Power cable clamp 1AB 03206 0008 Basic extension kit (BAS-E) : M8 screw : protective caps : heat shrink cap : outer insulation : inner insulation : cable between rack and clamps Figure 25: Power Clamp View 3BK 17186 0002 RJZZA Ed.05 39 / 52 Power Cables Connecting Figure 26: Rack Power Cables Order of work : GND, since BATRET, since BAT A, since BAT B Procedure Remove the first skin of power bus cable Fit the cable clamp to power bus and to cables of top structure (to achieve good contact, not remove the conducting grease) Tighten hard the nut (1 in Figure 25) 40 / 52 3BK 17186 0002 RJZZA Ed.05 Power Cables Connecting 6.3 Test the Power Supply : BAT B filtered –48V : BATRET filtered 0V : BAT A filtered –48V Figure 27: TRU (rear rack) To test the power supply: Check that rack breakers are “OFF” At the TRU board of each rack, measure the voltage and the 48 Volts polarity 3BK 17186 0002 RJZZA Ed.05 41 / 52 Power Cables Connecting 42 / 52 3BK 17186 0002 RJZZA Ed.05 Finishing Installation Finishing Installation This chapter describes : the finishing of mechanical installation the labeling of rack 3BK 17186 0002 RJZZA Ed.05 43 / 52 Finishing Installation 7.1 Mechanical Assembly Finishing 44 / 52 3BK 17186 0002 RJZZA Ed.05 Finishing Installation A =13 mm ; B = 16 mm ; C = 13 mm To finish the mechanical assembly: Fit the header panels of the rack Fit the cross member assembly between the racks Install the front rack upper grid Fit the second PCM cable gland Install the rear rack upper grid Install the doors (pull down the sliding rod) Label the rack (rack B in example) 3BK 17186 0002 RJZZA Ed.05 45 / 52 Finishing Installation 7.2 Finishing Before leaving the site: Close the doors Clear away packaging Clean the site Leave the rack key to the door 46 / 52 3BK 17186 0002 RJZZA Ed.05 Appendix A : Abbreviations Appendix A: Abbreviations 3BK 17186 0002 RJZZA Ed.05 Ater Interface PCM link between TC and BSC Abis Interface PCM link between BTS and BSC BSC Base Station Controller BSS Base station subsystem BTS BaseTransceiver Station CCL Completion check list CEL Premise inspection form DC Direct current DDF Digital distribution frame EMS Electro-mechanical shielding FRD Failure report GND Ground (earth) GSM Global system for mobile communications ITL-PRO Procedure technical and support information IO Instruction Operation PCM Pulse Code Modulation TC Transcoder 47 / 52 Appendix A : Abbreviations 48 / 52 3BK 17186 0002 RJZZA Ed.05 Appendix B : List of Items Required Appendix B: List of Items Required Installation Kits The following table is used to check, on site, the mandatory or optional delivery item kits The used symbols are: • mandatory kit ∇technical choice kit ◊ customer option kit Materials Mnemo Reference Qty • Extension kit BAS-E 3BK 07703 ABAA 1/rack ∇ 75 Ohms IK1 3BK 08772 AA 1/rack ∇ 120 Ohms IK2 3BK 08772 AB 1/rack ∇ 75 Ohms IK7 3BK 08772 AG 1/rack ∇ 120 Ohms IK8 3BK 08772 AH 1/rack • Ironwork kit IK4 3BK 08772 AD 1/rack • Cable tray 0.95 cm (horizontal) CTEG2 3BK 08773 AC 1/rack ∇ between rack A and rack B CINE 3BK 06691 AA ∇ between rack A and rack B and rack C CINE 3BK 06691 AB ◊ wire to wire kit IW2 3BK 07797 ABAA 1/rack • DDF meter for x MP24 DDF 1AD 02846 0001 • Mechanical part for 24 x JS10 MP24 1AD 02843 0001 • Terminal block 10 pairs JS10 1AD 06634 0011 24 • Label for 24 x JS10 LAB 1AD 02854 0001 ∇ 120 Ohms / pair (L904) L904/1 1AC 00369 0008 roll ∇ 75 Ohms / coax (FLEX3) FLEX3/1 1AC 00362 0001 roll • Top structure • Top structure (EDGE compatible) • Inter-rack cable kit ◊ DDF ◊ Jumpers for DDF (provided in rolls ) 3BK 17186 0002 RJZZA Ed.05 49 / 52 Appendix B : List of Items Required Reference Quantity • 12 coax 3BK 08753 HA 4/rack • coax 3BK 08752 HA 4/rack • 12 coax 3BK 08753 JA 4/rack • coax 3BK 08752 JA 4/rack • 12 coax 3BK 08753 HL 4/rack • coax 3BK 08752 HL 4/rack • 12 coax 3BK 08753 KH 4/rack • coax 3BK 08752 KH 4/rack • 12 coax 3BK 08755 HA 4/rack • coax 3BK 08754 HA 4/rack • 12 coax 3BK 08755 JA 4/rack • coax 3BK 08754 JA 4/rack • 12 coax 3BK 08755 HL 4/rack • coax 3BK 08754 HL 4/rack • 12 coax 3BK 08755 KH 4/rack • coax 3BK 08754 KH 4/rack PCM cables ∇ 75 Ohms .• 20 m .• 30 m .• 40 m .• 60 m ∇ 120 Ohms .• 20 m .• 30 m .• 40 m .• 60 m Consumable Supplies The following table is used to check, at base, the availability of the installer’s consumable supplies (not included in Alcatel kits) Item Qty Indelible marker Set of rubber sleeves for all cables Set of tie wraps (different sizes) Set of lugs 50 / 52 3BK 17186 0002 RJZZA Ed.05 Appendix B : List of Items Required Adhesive tape Set of blank labels for cables Documents Required The following table is used to check, at base, the availability of the necessary documents Applicable notification list (ITL-PRO) 3DF 00462 0004 AAAGA Applicable operation instructions (IO) 3DF 00300 0004 UAZZA General Wiring Handbook 3BK 17160 0001 RJZZA Tools catalogue for field activity 3BK 20458 0001 RJZZA Site premises inspection form (CEL) 8BL 00704 0015 DRBRA Completion Check List (generic) (CCL) 3BK 17200 0002 QZZZA Specification for site preparation (SPP27) 8BL 00704 0018 DRBRA BSS site premises inspection, post handover 8BL 00704 0016 DRBRA Installation method of DDF for BSS equipment 3DF 00435 0033 RJZZA Tools Required The following table is used to check, at base, the availability of the necessary tools (See ” Tools catalogue ” for content checking) Kit name Reference Calibration Basic kit OUT 001 no 3BK 17186 0002 RJZZA Ed.05 51 / 52 Appendix B : List of Items Required BLANK PAGE BREAK 52 / 52 3BK 17186 0002 RJZZA Ed.05 ... the rear of the extension racks Tie the cables to the racks For compatibility with EDGE, the BSC can be delivered with IK or IK top structure In this case, additional multipair cables can be fitted... / 52 PCM Cables Installation 5.1 Cable Installation in the Cable Way Procedure Install the cables in PCM compartment of cable tray Attach the cables with plastic tie wraps Mark cables with a marker... indicated on labels, approach the end of cables Connect the cables to the extension racks Do not connect the cables to the rear of operating racks Tie the cables to the racks 3BK 17186 0002 RJZZA

Ngày đăng: 28/06/2017, 15:15

Từ khóa liên quan

Tài liệu cùng người dùng

  • Đang cập nhật ...

Tài liệu liên quan