1. Trang chủ
  2. » Ngoại Ngữ

ITS building project progress update 4

10 74 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 10
Dung lượng 6,57 MB

Nội dung

Progress Update (Nr 4) Week ending 6th November Programme Update - ITS For Period : Mon 26th October – Friday 6th October - Completed excavations, reinforcement and formwork to perimeter retaining walls - Completed installation of reinforcement to basement slab and concrete pour - Commenced installation of holding down bolts in preparation for steelwork - Completed internal damp-proofing works to basement walls - Commenced internal builders work and the removal of remaining load bearing walls: including installing necessary concrete lintels - Continue first fix mechanical and electrical works within existing building to all floors Progress Photos – External Basement floor slab & lift pit concrete pour complete Progress Photos – External Retaining wall steelwork reinforcement installed throughout perimeter walls Progress Photos – External Retaining wall formwork/shuttering installed and also temporary props positioned in preparation for next phase concrete pour Progress Photos – Internal First fix mechanical and electrical works continued within the existing building through all floors Progress Photos – Internal Internal structural builderswork ongoing including installation of load bearing lintels Progress Photos – Internal Commenced infill of new plasterboard ceilings to rooms and corridors throughout floors Next Few Weeks……… A look ahead to works commencing within the next weeks : - Complete excavations to new ground floor slab and pad foundations - Complete concrete pours to perimeter retaining walls - Commence ‘making good’ to walls within rooms of existing building - Commence self level screeding and preparatory overboarding to existing sub-floors - Continue internal builders work; including installing required lintels and steelwork - Continue first fix mechanical and electrical works within existing building to all floors .. .Progress Update (Nr 4) Week ending 6th November Programme Update - ITS For Period : Mon 26th October – Friday 6th October - Completed... mechanical and electrical works within existing building to all floors Progress Photos – External Basement floor slab & lift pit concrete pour complete Progress Photos – External Retaining wall steelwork... continued within the existing building through all floors Progress Photos – Internal Internal structural builderswork ongoing including installation of load bearing lintels Progress Photos – Internal

Ngày đăng: 27/11/2015, 12:39

TỪ KHÓA LIÊN QUAN

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN

w