1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

Toyota camry 2006 2011 2AZ FE intake hệ thống điều khiển khí nạp trên toyota camry 2AZ FE đời 2006 2011

7 541 1

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 7
Dung lượng 526,68 KB

Nội dung

HỆ THỐNG ĐIỀU KHIỂN KHÍ NẠP TRÊN TOYOTA CAMRY 2AZ-FE ĐỜI 2006-2011

Trang 1

2AZ-FE INTAKE – INTAKE AIR CONTROL SYSTEM IT–1

IT

ENGINE

2AZ-FE INTAKE

INTAKE AIR CONTROL SYSTEM

PARTS LOCATION

for PZEV:

INTAKE AIR CONTROL VALVE

Trang 2

IT–2 2AZ-FE INTAKE – INTAKE AIR CONTROL SYSTEM

IT

SYSTEM DIAGRAM

C24 103

C24 126

A24

CA2

CA2

9

19

1 3

2

B-W B

L

L

W

5

4

W

G

IACA VCIA

EIA

IAC+

IAC-IACA VCIA

EIA

IAC+

IAC-C33

Trang 3

2AZ-FE INTAKE – INTAKE AIR CONTROL SYSTEM IT–3

IT

ON-VEHICLE INSPECTION

1 INSPECT INTAKE AIR CONTROL VALVE ASSEMBLY

(a) Inspection procedure when using the intelligent tester:

(1) Warm up the engine.

(2) Stop the engine.

(3) Connect the intelligent tester to the DLC3.

(4) Turn the ignition switch on (IG).

(5) Turn the tester on.

(6) Select the following menu items: DIAGNOSIS / ENHANCED OBD II / ACTIVE TEST / INTAKE CTL VSV1 Press the right or left button.

(7) Make sure that a clicking sound is heard from the intake air control valve when current flows.

If the result is not as specified, replace the intake air surge tank.

Intelligent Tester

CAN VIM DLC3

C131977E05

Trang 4

IT–4 2AZ-FE INTAKE – INTAKE AIR CONTROL VALVE

IT

ENGINE

2AZ-FE INTAKE

INTAKE AIR CONTROL VALVE

COMPONENTS

N*m (kgf*cm, ft.*lbf) : Specified torque

5.0 (51, 44 in.*lbf)

5.0 (51, 44 in.*lbf)

9.0 (92, 80 in.*lbf) AIR CLEANER CAP SUB-ASSEMBLY

NO 1 ENGINE COVER SUB-ASSEMBLY

AIR CLEANER INLET ASSEMBLY

AIR CLEANER CASE SUB-ASSMEBLY

Trang 5

2AZ-FE INTAKE – INTAKE AIR CONTROL VALVE IT–5

IT

FRONT WIPER ARM AND BLADE ASSEMBLY RH

FRONT WIPER ARM AND BLADE ASSEMBLY LH

FRONT FENDER TO COWL SIDE SEAL RH

COWL TOP VENTILATOR

LOUVER SUB-ASSEMBLY

WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY

FRONT FENDER TO COWL SIDE SEAL LH

N*m (kgf*cm, ft.*lbf) : Specified torque

5.0 (51, 44 in.*lbf)

7.5 (77, 66 in.*lbf)

85 (867, 63)

20 (204, 15)

COWL TOP PANEL OUTER SUB-ASSEMBLY

Trang 6

IT–6 2AZ-FE INTAKE – INTAKE AIR CONTROL VALVE

IT

INTAKE AIR CONTROL VALVE

INTAKE AIR SURGE TANK ASSEMBLY

GASKET

FUEL INJECTOR CONNECTOR

FUEL MAIN TUBE

NO 1 DELIVERY PIPE SPACER INJECTOR VIBRATION INSULATOR

20 (205, 15)

x2

x5

30 (306, 22)

Trang 7

2AZ-FE INTAKE – INTAKE AIR CONTROL VALVE IT–7

IT

REMOVAL

1 REMOVE INTAKE AIR SURGE TANK ASSEMBLY

HINT:

(See page ES-510 )

2 REMOVE INTAKE AIR CONTROL VALVE

(a) Remove the intake air control valve.

INSPECTION

1 INSPECT INTAKE AIR CONTROL VALVE

(a) Inspection procedure when applying voltage between the terminals:

(1) Apply battery voltage between terminals 4 (IAC+) and 5 (IAC-) of the intake air control valve The actuator should continue to keep the valve open.

INSTALLATION

1 INSTALL INTAKE AIR CONTROL VALVE

(a) Install the intake air control valve.

2 INSTALL INTAKE AIR SURGE TANK ASSEMBLY

HINT:

(See page ES-511 )

A135692

4 (IAC-)

5

(IAC+)

A135693E01

Ngày đăng: 23/05/2014, 16:34

TỪ KHÓA LIÊN QUAN

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN

w