BAIGIANG DUC HANG

32 341 0
BAIGIANG DUC HANG

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

Thông tin tài liệu

1 Our main products….  Formtravellers Overhead and Underslung FT’s for cast in-situ concrete bridges.  Movable Scaffolding System (MSS) For cast in-situ concrete bridges - overhead or underslung MSS.  Launching Gantries (LG) For precast segmental construction – overhead or underslung LG’s.  Bridge Repair / Maintenance Equipment for repair & maintenance of concrete or steel bridges. 2 MOVABLE SCAFFOLDING SYSTEM Main Products Applications MSS - Moving Scaffolding System Span length 25 - 80 m Usual Total Length 400m – several km’s Usual cycle time / span 6 – 10 days 3 LG - Launching Gantries Span length: 25 – 100+m Usual Length: Minimum 500 - 800 segments Usual cycle time / span 1-3 days / span LAUNCHING GANTRY Main Products Applications 4 FORMTRAVELLER Main Products Applications FT - Formtraveller Span length: 40 – 300+ m Usual cycle time: 2 x 1 segment / week 5 The formtraveller system was invented in 1970 and today it is acclaimed for enhancing the cost-effectiveness of bridge projects world- wide. We have continually improved the Formtraveller in collaboration with major contractors. The system is lightweight, versatile and easy to assemble and operate. Rolling forward on rails, the system can be reset quickly and easily. Where to use the Formtraveller The Formtraveller is used for free cantilever construction of post- tensioned boxgirder and cable-stayed concrete bridges. Engineered to international standards, the system provides an exceptionally rigid formwork, with a maximum deflection of less than 25 mm at full loading. THE FORMTRAVELLER CONCEPT 6 The Formtraveller The Standard Formtraveller is designed for a usual segment length of 5 m and load capacities (concrete and formwork) varying from 100 tons to 600 tons. The steel weight depends on the cross-section of the bridge in question, but will normally vary from about 25 tons to 110 tons correspondingly. The Standard Formtraveller may be adapted to suite almost any cross-section, and is easily adjustable during operation to variations in segment length (up to 5 m), section height, web thickness, and deck width. For segment lengths beyond 5 m and other conditions, the Formtraveller will be tailor-made. 7 The Formtraveller - Cross-Support for installation on small Pierheads When the pier head is too small to allow normal assembly of the Formtraveller, our Cross-support solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the these 4 phases: 3 m Phase 1: Assembly at pierhead as small as 3 m 8 Phase 2: Concreting of 1st segment on each side of the pier finished The Formtraveller - Cross-Support for installation on small Pierheads When the pier head is too small to allow normal assembly of the Formtraveller, our Cross-support solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the these 4 phases. 9 Phase 3: Splitting of travellers The Formtraveller - Cross-Support for installation on small Pierheads When the pier head is too small to allow normal assembly of the Formtraveller, our Cross-support solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the these 4 phases. 10 Phase 3: Splitting of travellers The Formtraveller - Cross-Support for installation on small Pierheads When the pier head is too small to allow normal assembly of the Formtraveller, our Cross-support solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the these 4 phases. [...]... ready for normal procedure 15 THE FORMTRAVELLER FEATURES Lightweight: The use of rectangular hollow sections in the main structural components and recoverable high strength bars in all stays and ties reduces the total steel weight to a minimum Flexible design: The Formtraveller may be adapted to almost any cross-section and is easily adjustable during operation to variations in segment length, box height, . segments Usual cycle time / span 1-3 days / span LAUNCHING GANTRY Main Products Applications 4 FORMTRAVELLER Main Products Applications FT - Formtraveller Span length: 40 – 300+ m Usual cycle. for repair & maintenance of concrete or steel bridges. 2 MOVABLE SCAFFOLDING SYSTEM Main Products Applications MSS - Moving Scaffolding System Span length 25 - 80 m Usual Total Length 400m. 1 Our main products….  Formtravellers Overhead and Underslung FT’s for cast in-situ concrete bridges.  Movable

Ngày đăng: 06/05/2014, 07:04

Tài liệu cùng người dùng

Tài liệu liên quan