1. Trang chủ
  2. » Tất cả

9 directional drilling

28 0 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 28
Dung lượng 283,59 KB

Nội dung

Petroleum Engineering 405 Drilling Engineering 1 Well Drilling Engineering Directional Drilling Dr DO QUANG KHANH 2 Directional Drilling  When is it used?  Type I Wells  Type II Wells  Type III We[.]

Well Drilling Engineering Directional Drilling Dr DO QUANG KHANH Directional Drilling I II III and Hold Build  When is it used? KOP EOC Build-Hold and Drop Continuous Build  Type I Wells  Type II Wells  Type III Wells  Directional Well Planning & Design  Survey Calculation Methods Read ADE Ch.8 (Reference) Inclination Angle θ, α, I Direction Angle φ, ε, A Max Horiz Depart ? 10 14 Fig 8.11 r1 < x and r1 + r2 < x 15 r1 < x and r1 + r2 > x 16 N18E S23E Azimuth Angle S20W N55W 17 18 Example 1: Design of Directional Well Design a directional well with the following restrictions: • Total horizontal departure = 4,500 ft • True vertical depth (TVD) = 12,500 ft • Depth to kickoff point (KOP) = 2,500 ft • Rate of build of hole angle = 1.5 deg/100 ft • Type I well (build and hold) 19 Example 1: Design of Directional Well (i) What is the maximum hole angle required (ii) What is the total measured depth (MD)? (MD = well depth measured along the wellbore, not the vertical depth) 20

Ngày đăng: 02/04/2023, 11:07

w