1. Trang chủ
  2. » Ngoại Ngữ

CES - 2020.10.07 Kennebunk Facilities Assessment and Masterplan Qualifications 11937

55 2 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Nội dung

Town of Kennebunk, Maine FACILITIES ASSESSMENT AND MASTERPLAN Request for Qualifications | Architects and Engineers October 7, 2020 Christopher J Osterrieder, PE Director of Community Development Town Engineer Town of Kennebunk Summer Street Kennebunk, Maine 04043 SENSIBLE SOLUTIONS PREPARED BY: CES, Inc Contact: Matthew Carter, AIA mcarter@cesincusa.com One Merchants Plaza, Suite 701 Bangor, ME 04401 P 207-989-4824 | F 207-989-4881 October 7, 2020 Christopher J Osterrieder, PE Town of Kennebunk Summer Street Kennebunk, Maine 04043 RE: Town of Kennebunk Facilities Assessment & Masterplan Letter of Interest and Statement of Qualifications Architectural and Engineering Services | Kennebunk, Maine Dear Mr Osterrieder: CES, Inc (CES) is pleased to present this Letter of Interest and Statement of Qualifications to the Town of Kennebunk (Town) in response to your request for qualifications to provide a Facilities Assessment and Master Plan of the various facilities owned by the Town We understand this project will include the following tasks: ◆ ◆ ◆ ◆ ◆ ◆ ◆ Development of facilities condition assessments for each Town owned facility; Staff interview and information gathering activities; Facilities programming based on an understanding of Town and staff needs; Assessment of current and future facility capital needs; Identification of needed facilities improvements; Development of budgets and timelines for projected facilities improvements; and Coordination of this masterplan with the work of other Town employed consultants CES is a full-service consulting firm with a 42-year history of working with educational, municipal, state, federal and commercial clients in a variety of sectors Our talented staff of engineers, architects, scientists, and surveyors efficiently manages our clients’ projects and works diligently to provide sensible solutions that meet their clients’ defined needs Our team has specific design and development experience with each of the building types that are part of this study, as well as with the systematic evaluation of municipal facilities to determine their fitness for the current uses they must serve and for the future uses projected for them Our engineers have extensive experience in the evaluation and design of civil, structural, mechanical and electrical systems in existing and new construction Our architect, Matthew Carter, AIA, has specialized in the design and evaluation of municipal facilities, including fire and police stations, city halls and libraries for over 25 years Furthermore, Mr Carter has interest and expertise in projects involving buildings with local and national historic significance, and he currently serves Town of Kennebunk Facilities Assessment & Masterplan | 10.07.2020 | 11937.002 | Page i as the chair of Bangor’s Historic Preservation Commission His involvement in the preservation of historically significant buildings, and his understanding of the thinking and procedures involved in working with local and national historic preservation boards will be a valuable part of the qualifications that our design team can bring to your project As your consultant, our team will: ◆ ◆ ◆ ◆ ◆ Take a sensible approach and develop solutions that can help you understand what Kennebunk’s facilities can be now and in the future Find technical and design solutions that directly and effectively address the needs of your community CES has a working understanding of applicable design, accessibility, and preservation ordinances and codes that allows us to assess your facilities needs clearly and correctly Work collaboratively with all stakeholders and other consultants to ascertain the Town’s future needs Deliver a quality solution that is functional, reliable, and sensible Provide graphic exhibits that clearly explain project strategies to the community, so that town leadership can effectively develop community consensus Since CES is a full-service firm, we are able to provide all design services under one roof, maintaining and ensuring consistency and quality all the way through your project We have found that efficiency in our management structure and attention to quality control helps to keep client expectations and compensation fees in line, from beginning to end At the same time, we are able to produce designs that serve community needs, while being attractive and adding value to municipal facilities We greatly appreciate your consideration and hope that in the end you feel, like we do, that we are the right partner for your project Please not hesitate to contact us with any questions you may have at (207) 989-4824 Sincerely, CES, Inc Matthew G Carter, AIA Senior Project Manager Senior Architect Travis Noyes, PE Executive Vice President Engineering Division Director MGC/rlt Enc Town of Kennebunk Facilities Assessment & Masterplan | 10.07.2020 | 11937.002 | Page ii TABLE OF CONTENTS SECTION A | CONSULTANT QUALIFICATIONS p SECTION B | BUDGETARY MANAGEMENT p SECTION C | FIRM CAPABILITIES p SECTION D | SIMILAR EXPERIENCE p 11 SECTION E | PROJECT TEAM p 23 SECTION F | CURRENT WORKLOAD p 26 SECTION G | REFERENCES p 27 APPENDIX 1: Resumes Town of Kennebunk Facilities Assessment & Masterplan | 10.07.2020 | 11937.002 | Page iii SECTION A | CONSULTANT QUALIFICATIONS HISTORY AND BACKGROUND CES, Inc was founded in 1978 as a civil engineering firm and has grown into a multidisciplined consulting company that offers a wide range of services from project conception to final construction Over 115 highly qualified personnel including Engineers, Land Surveyors, Geologists, Environmental Scientists, Foresters, GIS Analysts and CADD Technicians make up the professional diversity within one company to tackle a variety of projects Integrating their technical skills and expertise, they are able to provide sensible solutions to municipal, industrial, commercial, and institutional clients CES is headquartered in Bangor, Maine, with branch offices located in the communities of Lewiston, Machias, Presque Isle, Waterville and Saco, as well as Fort Myers, Florida and Maynard, Massachusetts Our services include: ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ Civil Engineering Environmental Engineering Electrical Engineering Structural Engineering Mechanical Engineering Land and Construction Surveying Land Use & Community Planning Transportation Planning & Traffic Engineering Indoor Air Quality Health and Safety Compliance Water and Wastewater Hazardous Materials Management (Asbestos, Lead-based Paint, PCBs) Natural Resources (Wetland/Habitat) Geology/Hydrogeology Environmental Monitoring Permitting (Municipal, State, and Federal) GIS Consulting Informational Technology (IT) Support Drone Services Architecture CES believes that by listening attentively to clients’ needs and working collaboratively with them on projects, sensible solutions are achieved From project conception through final construction and beyond, CES delivers sensible solutions built on value, quality, timeliness, and teamwork Town of Kennebunk Facilities Assessment & Masterplan | 10.07.2020 | 11937.002 | Page Functioning as a team within our organization, with our subcontractors, and most importantly with our clients, promotes effective communication, resulting in the delivery of a project that is individually tailored and cost-efficient At CES we value honesty and commitment, and these values drive us to provide every client with a quality service that meets, and often exceeds their expectations This belief is just one of the reasons clients routinely return to CES PROFESSIONALS ON STAFF CATEGORY Professional Engineers (PE)* Civil Environmental Structural Mechanical Electrical Degreed Engineers-In-Training (EI) Certified Geologists (CG) Environmental Scientists Professional Foresters (PF) Professional Land Surveyors GIS Professionals Radon Service Providers Wastewater Treatment Plant Operators Drone Operators Licensed Architects * some PEs specialize in more than one category NUMBER 23 15 17 11 2 TECHNICAL DIRECTORS ROLE President/CEO Executive VP/Surveying Division Director Executive VP/Engineering Division Director Executive VP/Environmental Division Director DIRECTORS Denis St Peter, PE Jeff Teunisen, PLS Travis Noyes, PE John Pond, WWTPO/RSP COMMUNICATIONS Our overall approach to a project can be summarized in one word - collaboration We value the institutional knowledge that our clients possess, and we routinely look to build on their local experiences We see our role, besides providing technical expertise, as helping our client coordinate efforts to achieve future growth and development goals Effective coordination, good Town of Kennebunk Facilities Assessment & Masterplan | 10.07.2020 | 11937.002 | Page project planning and consistent communication are instrumental in our overall relationship and for our approach to specific projects CES has incorporated state of the art, user friendly communication technology that helps to ease the current challenge of in-person meetings While we love to visit with our clients, all project professionals have the ability to coordinate virtual meetings with clients, stakeholders, and other collaborators Information sharing is a key component of the flow of a project, and we make our best effort to create clear communication regardless of situational challenges Change is the only constant with any project Our staff members are adept at identifying the changes that occur throughout the progress of the design and construction and effectively communicate the resulting impact with our clients Since change can impact schedule and budget, timely and effective communication with all involved parties is necessary Our goal is to minimize the unknowns for the bidders in order to decrease and hopefully eliminate change orders We will provide architectural and engineering expertise for the project and will also help coordinate with all parties involved to provide a systematic design for the project This coordination and project planning will minimize inconveniences to any public access spaces, or people working in close proximity to the project area This collaborative approach will also ensure the desired work is completed within the desired timetable Our focus on communication gives us the ability to successfully guide the bid, construction administration and oversight processes QUALITY CONTROL The CES team offers a full complement of professional services that can address your project needs including expertise in Civil, Structural, Mechanical, and Environmental Engineering, Architecture, Survey, Planning, and Sciences CES is committed to being recognized in Maine as a leading consulting firm providing engineering, surveying, sciences, planning, and other related services A large part of being recognized as a leading firm is achieving quality results and providing a quality deliverable Given this, we created a Quality Assurance/Quality Control Policy that must be followed for all project deliverables This policy is referred to by CES staff during the preparation of project deliverables and when initiating document review Documents prepared must be based on accurate technical information, easy to read, well written, and well organized Documents that are clear, concise, easily understood, and without errors are essential Utilizing the Quality Assurance/Quality Control (QA/QC) Policy allows our firm to meet these requirements QA is the process that ensures prudent quality control measures have been established and the desired quality in a deliverable or service is achieved QC refers to the procedures, methods, and actions that are routinely employed to produce conformance with requirements and expectations Town of Kennebunk Facilities Assessment & Masterplan | 10.07.2020 | 11937.002 | Page CES’ policy ensures that: ◆ Quality work is consistently performed and that quality deliverables are consistently produced ◆ Project documents are prepared in accordance with current regulations, policies, procedures, guidelines, and standards established at CES ◆ Project documents have undergone the necessary technical and editorial review processes Completing/performing quality work is the responsibility of every individual at CES By incorporating this QA/QC process and policy into our daily work practices, CES staff will identify errors, omissions or potential conflicts, ask questions, or raise issues pertaining to items of design features that present problems Town of Kennebunk Facilities Assessment & Masterplan | 10.07.2020 | 11937.002 | Page SECTION B | BUDGETARY MANAGEMENT From a budget perspective, we view a client’s money as if it were our own, which means we take a fiscally conservative approach We begin our discussion with a client to gain an understanding of their project’s budget Once the budget is known, we can design the project to fall within the estimated costs We typically provide cost estimates twice during design, once with the preliminary design submission and once with the final design submission We carry contingencies in our pricing, typically based on a percentage of the total cost, which changes as more information is developed The contingency provided during conceptual design is more than that presented with the final design because less information is known at that point We feel strongly that our clients should budget for unknowns through a contingency We have found that being able to provide our client with realistic budgeting allows successful project implementation The following table lists recent projects and associated costs, and illustrates our proven success with budgetary management for our clients PROJECT Sylvan Road Drainage – Town of Mount Desert Call Road Phase II & III – Milford/OTWD Oak Grove Sewer – Veazie Sewer District Odlin Road Pump Station – City of Bangor Bridge/Culvert Replacement – DVEM T2R9 Sand/Salt Shed – Town of Burlington EST COST $569,050 $1,000,000 $377,119 $1,019,430 $303,000 $393,558 BID AMOUNT $372,051 $750,461 $294,652 $970,150 $203,000 $319,495 FINAL COST $413,035 $720,942 $304,687 $959,059 $203,000 $319,495 Town of Kennebunk Facilities Assessment & Masterplan | 10.07.2020 | 11937.002 | Page SECTION C | FIRM CAPABILITIES The success of our business has been built over the last 42 years primarily through the relationships we have been able to develop, and the on-going business we obtain from our repeat clients Many of our clients have been with us since our beginning in the late 1970’s, which we feel is a testament to the importance we place on relationships We have grown to a firm size of over 115 professionals capable of providing services in the engineering, architectural, environmental, and surveying disciplines We support clients in a variety of sectors including governmental, municipal, private, industrial, and commercial In any given year CES staff work on 600 to 700 projects The following table illustrates several projects that we have performed in the last few years that demonstrate the breadth of services we offer PROJECT NAME Central Maine & Quebec Railway Recent Experience CES, Inc LOCATION Brownville Junction and Derby yards Call Road Street and Utility Improvements – Milford/OTWD Milford, ME Krispy Kreme Auburn, ME Dead River – Second Containment Project AIM Bucksport Mill (formerly Verso) Mt Desert Island, ME Bucksport, ME Jackson Laboratory Building Expansion Ellsworth, ME Daigle Oil Bangor, Maine Katahdin Valley Health Center Facility Expansion Patten, ME Darling’s Augusta Expansion Augusta, ME SERVICES PROVIDED MDEP Tank siting and Variance, State of Maine Fire Marshal Permit, SPCC plan preparation and certification Surveying Water, sewer, road, and stormwater design Site design and permitting Tank and drainage design SLODA permitting, Hazardous Waste closure, solid waste engineering, Hazardous materials testing, Demolition contracting and oversight, SPCC Certification Building/structural, utility design, UST Siting Site plan for drainage and underground storage tanks Structural, site, utility design, permitting, construction oversight, surveying Site design, permitting, hazardous waste closure, subslab soil assessments Town of Kennebunk Facilities Assessment & Masterplan | 10.07.2020 | 11937.002 | Page Project Experience Town of Bar Harbor Transfer Station | Bar Harbor, Maine CES was retained by the Town of Bar Harbor to complete engineering services for the Town’s transfer station facility As Project Manager, Chris was responsible for overseeing building design, foundation and framing design, as well as plumbing, heating, and electrical coordination Chris also was responsible for overseeing plan development, construction permit applications, technical specification and bid package, bidding services, and project administration The Jackson Laboratory – Building 250 Expansion | Ellsworth, Maine CES was retained by the Jackson Laboratory to complete engineering services for their 30,000 square foot addition to the existing Lowe’s building As Senior Project Engineer, Chris was responsible for, foundation and structural steel framing design, as well as coordination with architect Chris also was responsible for plan development, construction permit applications, technical specification and bid package, bidding services, and project administration, and was Engineer of Record Downeast Horizons, Inc – Developmental Center | Brewer, Maine CES was retained by Downeast Horizons, Inc to complete engineering services for their new 5,500 square foot Development Center Building As Senior Project Engineer, Chris was responsible for building design, foundation and framing design, as well as plumbing, heating, and electrical coordination Chris also was responsible for plan development, construction permit applications, technical specification and bid package, bidding services, project administration, and was Engineer of Record Town of Bar Harbor Municipal Building | Bar Harbor, Maine CES was retained by the Town of Bar Harbor to complete engineering services for the Town’s 20,000 square Municipal Building As Project Engineer, Chris was responsible for building design, foundation and framing design, as well as plumbing, heating, and electrical coordination Chris also was responsible for plan development, construction permit applications, technical specification and bid package, bidding services, and project administration Treats Falls House | Orono, Maine Chris served as the Project Engineer for the structural design for the renovations and additions to the 16,000 sf Intermediate Care Facility in Orono The project was financed by a $5 million USDA RD Loan and included two building additions and a renovation of the existing structure The additions and renovations were phased to accommodate use of the existing facility during construction Materials included conventional dimensional lumber, pre-engineered trusses, composite framing, and structural steel Sargent Corporation – Corinth Elementary School – Fire Cistern Tank | Corinth, Maine CES was retained by the Sargent Corporation to complete an engineering design review for a 50,000-gallon Cast-in-Place underground Fire Cistern Tank As Project Engineer, Chris was Mr Chris Snowdeal | Page of responsible for preparing design calculations and reviewing construction plans for an alternate proposal to a pre-engineered, precast fire cistern tank Chris was also the Engineer of Record Processing Facility, BBS Lobster Trap | Steuben, Maine CES worked with BBS Lobster Trap on the major expansion of their processing and shipping facility in Steuben, Maine This facility grades, sorts, and ships more than three million pounds of live lobster each year The project included design of several holding tanks, water supply systems, and water treatment provisions The designed facility has the capacity to hold 300,000 pounds of live lobsters for extended periods of time The tanks are housed within a commercial structure that was also part of the project design Chris acted as the Project Engineer for the design of this facility Town of Roque Bluffs Fire Station | Roque Bluffs, Maine As Project Engineer, Chris was responsible for site, foundation, framing and general building design; contract document development and construction administration for a 1,400-square foot Fire Station partially funded by a Community Development Block Grant Eastport Port Authority Warehouse | Eastport, Maine As Project Engineer, Chris was responsible for reviewing design plans and technical specifications for conformance to the current building code for 30,000 square foot fabric covered warehouse Eastport Port Authority Office Building | Eastport, Maine As Project Engineer, Chris was responsible for building code review, plan development, foundation and framing design, and Construction and Barrier Free permit applications for a 5,900square foot office building Town of Lowell Municipal Building and Fire Station | Lowell, Maine CES was retained by the Town of Lowell to complete engineering services for the Town’s 5,000 square Municipal Building and Fire Station As Project Engineer, Chris was responsible for site design, building design, foundation and framing design, as well as plumbing, heating, and electrical design Chris also was responsible for plan development, construction permit applications, technical specification and bid package, bidding services, and project administration Sand/Salt Storage Facilities | Various Locations, Maine Chris has provided structural engineering and site design on several sand/salt storage facilities The following are a selection of sand/salt shed projects Chris has been involved with for CES, Inc.: Town of Belmont: Site Design, Plan Review/Permitting, Foundation Design, Project Manual Development, Oversight of Plan Development, and Plan Development for 2,500 cy, Fabric Covered Building, 72’ x 80’ Mr Chris Snowdeal | Page of Town of Rockport: Foundation Design, Building Design, Project Manual Development, Oversight of Plan Development, and Plan Development for 5,000 cy, Standard Laminated Arch Building, 70’ x 130’ City of Belfast: Site Design, Site Plan Review/Permitting, Foundation Design, Building Design, Project Manual Development, and Oversight of Plan Development for 4,500 cy, Standard Laminated Arch Building, 70’ x 120’ Town of Corinth: Site Design, Site Plan Review/Permitting, Foundation Design, Building Design, Project Manual Development, Oversight of Plan Development, and Plan Development for 4,500 cy, Standard Laminated Arch Building, 60’ x 150’ Town of Jonesboro: Site Design, Site Plan Review/Permitting, Foundation Design, Building Design, Project Manual Development, Oversight of Plan Development, and Plan Development for 1,500 cy, Standard Laminated Arch Building, 60’ x 72’ Town of Enfield: Site Design, Site Plan Review/Permitting, Foundation Design, Building Design, Project Manual Development, Oversight of Plan Development, and Plan Development for 2,850 cy, Standard Laminated Arch Building, 70’ x 84’ Town of Norridgewock: Foundation Design, Building Design, Oversight of Plan Development, and Plan Development for 4,800 cy, Standard Laminated Arch Building, 80’ x 132’ Town of Orland: Site Design, Site Plan Review/Permitting, Foundation Design, Building Design, Project Manual Development, Oversight of Plan Development, and Plan Development for 2,890 cy, Standard Laminated Arch Building, 60’ x 100’ Penobscot County: Site Design, Site Plan Review/Permitting, Foundation Design, Building Design, Project Manual Development, and Oversight of Plan Development for 1,200 cy, Standard Laminated Arch Building, 50’ x 72’ Town of Lowell: Site Design, Site Plan Review/Permitting, Foundation Design, Building Design, Project Manual Development, Oversight of Plan Development, and Plan Development for 2,490 cy, Standard Laminated Arch Building, 60’ x 100’ Town of Trenton: Site Design, Site Plan Review/Permitting, Foundation Design, Building Design, Project Manual Development, Oversight of Plan Development, and Plan Development for 2,050 cy, Standard Laminated Arch Building, 60’ x 84’ Mr Chris Snowdeal | Page of Jon H Whitten, Jr., PE Project Manager Jon H Whitten, Jr has over 20 years of civil engineering experience related to site development project management, design and permitting Design experience includes private and public infrastructure, including roadways, utilities, stormwater management systems, and erosion control features for municipal, commercial and residential projects Working on a wide range of projects of varying size and location, Jon has extensive management and coordination of Local, State and Federal zoning, natural resources and regulatory permits throughout the State of Maine Specific types of projects Jon has managed include: Commercial Site Plans, Residential/Commercial Subdivisions, Condominium Development, Municipal/State Roadways and Utilities, Gravel and Rock Extractions, Solid Waste Facilities, Recreation Trails, Construction Administration/Observation, Post Construction Stormwater Inspections, etc jwhitten@cesincusa.com (207) 989-4824 Core Expertise Site Design and Permitting Utilities and Roads Construction Administration/Oversight Environmental Permitting Education B.S Civil Engineering, University of Maine, Orono Professional History 2019 – Present CES, Inc Project Manager 2015 – 2019 Plymouth Engineering Inc Senior Project Manager 2006 – 2015 Terradyn Consultants, LLC Principal / Project Manager 1996 – 2006 Sebago Technics, Inc Project Manager / Project Engineer Mr Jon Whitten, Jr | Page of Registrations Professional Engineer, State of Maine (#10414) MDOT LPA Certified Affiliations American Society of Civil Engineers National Society of Professional Engineers Project Experience Whole Oceans Aquaculture Facility | Bucksport, Maine Jon currently serves as CES’s Engineering Design Project Manager for the proposed Whole Oceans Aquaculture Facility, a large, state of the art, Land Based Aquaculture Facility, on the site of the old Verso Paper Mill in Bucksport, Maine The project includes the development of approximately 22-Acres of new buildings and a myriad of support system components on a 104Acre site CES plays an important role as a member of the Whole Oceans Design Team, which is a collaboration of several consultants from various locations throughout the United States and Canada CES, Inc., recently, successfully coordinated the submittal, review and approval of an Amended Site Location of Development Act (SLODA) Permit from the Maine Department of Environmental Protection and a Town of Bucksport Land Use Permit Final design and construction planning are currently underway and CES continues to play a significant role in the preparation, coordination and permitting of these plans and documents Town of Baldwin | Baldwin, Maine Jon served as Project Manager and Project Engineer for the stormwater modeling of over 200 acres of mountainous terrain to establish flow characteristics and flood levels at two problematic culvert crossings on Brown Road in Baldwin, Maine The re-design of the culvert crossings included the installation of new, larger pipes as well as new vertical alignment for approximately 700 LF of roadway Jon coordinated with FEMA and MDEP throughout the project design and construction observation for this project Dearborn Precision Tubular Products, Inc | Fryeburg, Maine Jon managed the campus planning and design, site grading, stormwater management and permitting for a large expansion of an existing site The site included 22 acres of impervious area on a 76-acre parcel of land Stormwater management features included catch basin and pipe system, dry swales, and large infiltration basins Jon worked closely with a construction firm to obtain a Site Location of Development Permit from MDEP for this project Watchic Lake Association | Standish, Maine Several waterfront properties on the eastern shore of Watchic Lake were experiencing degradation of their property due to lack of stormwater runoff control Jon worked with landowners, Watchic Lake Association Members, the Town of Standish, and MDEP to develop a shared stormwater management system to responsibly convey runoff from the north side of Route 114 to Watchic Lake Work included the use of natural, wooded wetlands to temporarily impound runoff, a serpentine, vegetated swale and a settling basin, swale and culvert system Residential Development Projects | Various Locations, Maine Longfellow Street Condominiums, Westbrook, Maine – 12-unit condominium project with private access drive, public water and sewer, underground utilities, natural gas, and LID stormwater features Majestic Woods Subdivision, Westbrook, Maine Patrick Drive, Scarborough, Maine Mr Jon Whitten, Jr | Page of Shalom House, Inc., Westbrook, Maine – 5-unit building Olde Woolen Mill, MSHA Housing, North Berwick, Maine Jockey Cap Ridge Subdivision, Fryeburg, Maine Mobius, Inc Damariscotta, Maine – 5-unit building MSHA Rental Housing, Chebeague Island, Maine Convene Road Subdivision, Sebago, Maine Hawthorne Lane Subdivision, Westbrook, Maine Knight Street Subdivision, Westbrook, Maine Fox Hill Estates, Naples, Maine Commercial Site Plans | Various Locations, Maine Village Green History Park, Windham Historical Society McDonald’s Restaurant Addition, Bridgton, Maine Fire and Rescue Station, Town of Sebago, Maine Salt Storage Shed, Town of Limington, Maine Construction Demolition and Debris Recycling Facility, Naples, Maine Coastal Kids Preschool, Damariscotta, Maine Burns’ Fencing Co Office Building, Westbrook, Maine Windham Youth Soccer, Soccer Field, Windham, Maine Shaw Earthworks, Inc., Office and Shop, Gorham, Maine Becky’s Diner, Portland, Maine Westbrook Heights Business Park, Westbrook, Maine Mr Jon Whitten, Jr | Page of Philip E Badger III, PE Senior Project Engineer Philip Badger has over 28 years of experience in electrical engineering and as a project manager Philip led an engineering project team in design of a $250 million-dollar indoor Theme Park Philip has provided leadership and created BIM (Building Information Modeling) standards for several healthcare facilities throughout southern Maine In his management role, Philip both directly supervised office staff and coordinated the efforts of others in multiple disciplines (e.g construction) on projects throughout Maine To advance his practice area and management knowledge, Philip has completed various Project Management Workshops addressing Leadership, Time Management, and Supervisory skills pbadger@cesincusa.com (207) 989-4824 Professional History 2018 – Present CES, Inc Senior Project Engineer Core Expertise Project Management Electrical Engineering Building Information Modeling Standards AutoDesk Education B.S (2003) Electrical Engineering Technology, University of Maine, Orono 2007 – 2010 exp (formerly X-nth) Electrical Engineer II Registrations Maine Master Electrician #MS60020325 Professional Licensed Engineer in Maine (#12480), New Hampshire (#13739), Massachusetts (#50069), Connecticut (#29030), New York (#90843), California (#E19762), Virginia (#4020-49032), and Washington (#49143) 2005 – 2007 TLC Engineering for Architecture Electrical Engineer II Affiliations Brewer Youth Hockey Volunteer 2012 – 2018 DiGiorgio Associates, Inc Vice President 2010 – 2012 Amec Senior Electrical Engineer Mr Philip Badger | Page of Project Experience Healthcare Facility Design | Portland, Maine Working as Vice President Electrical Engineer, Philip developed electrical engineering designs for a new healthcare facility including the construction and repairs, as well as upgrades to existing facilities The design process comprised of plans, specifications, cost estimates, schedules, record drawings, material submittal reviews, construction inspection, and development of construction programming documents This project included primary and secondary electrical distribution, transformers, wiring, interior electrical systems, communications, nurse calling system, security, lighting, lighting controls, and energy conservation Philip provided leadership for the electrical engineering department and for the Building Information Modeling team to develop standards and compliance to those standards using AutoDesk Revit and Naviswork software programs Government Facility Design | Portland, Maine As Senior Electrical Engineer, Philip was tasked with the designs and development for a new Government Facility which included plans, specifications, cost estimates, scheduling, record drawings, material submittal reviews, construction inspection and development of construction programming documents This project included primary and secondary electrical distribution, transformers, wiring, interior electrical systems, communications, security, lighting, and energy conservation Philip worked closely with Government agencies to ensure design compliance with multiple design guideline, standards, and codes Merck Research Facility | Boston, Massachusetts As Project Manager/Superintendent, Philip directed all phases of installation and inspection of electrical systems at a $350 million-dollar research facility in Boston, MA He provided installation inspections, work progress, pay requests, and change order verifications for the electrical, fire alarm, and security systems Philip worked closely with all contractors and sub-contractors involved with the project, to ensure the work schedule would meet or exceed the overall project schedule Philp also worked with engineers to deliver innovated changes that would assist in keeping the project on schedule and within budget constraints Placemaker Properties – Thompson Point | Portland, Maine As Senior Electrical Engineer, Philip was tasked with the designs and development for an extension of the underground utility plans for an additional phase of the project which included plans, specifications, cost estimates, material submittal reviews, construction inspection and development of construction programming documents This project included primary and secondary electrical distribution, transformers, wiring, communications, and lighting for a new Hotel, the Ice rink, concert venue and a performing arts building Philip worked closely with the local utility agencies to ensure design compliance with multiple design guideline, standards, and codes Mr Philip Badger | Page of Blueberry Lane | Falmouth, Maine As Senior Project Engineer, Philip was tasked with the electrical design and specifications for a roadway, sidewalk and roadway lighting renovations for the town of Falmouth which included plans, specifications, cost estimates, scheduling, record drawings, material submittal reviews, construction inspection and development of construction programming documents for a ¾ mile road and sidewalk lighting plan Additional Experience Massachusetts Winchester Hospital – Winchester, MA • Rapid Response Lab Winchester Hospital – Woburn, MA • Core Lab • Microbiology Lab Harrington Hospital – Webster MA • Emergency Department Addition • In Patient Psychology Renovation • Out Patient Psychology Renovation • Sleep Lab Renovations • Endoscopy Relocation Harrington Hospital - Southbridge, MA • Central Sterile Room Renovation • Ambulatory Care Unit Renovation • AHU replacement Brockton Neighborhood Healthcare – Brockton, MA • Medical Office – Vincente’s Market • Substance Abuse Clinic Renovations • Ultrasound Renovation UMass Health Alliance – Leominster, MA • 4th Floor Medical Surgery Renovation • Emergency Department Expansion and Renovations • Campus Lighting Upgrade Mr Philip Badger | Page of • • • • Medium Voltage Electrical Infrastructure Renovations Medical Office building – Outpatient Center Urgent Care Pharmacy Relocation UMass Health Alliance – Clinton, MA • Cardiac Rehab renovation UMass Health Alliance – Burbank, MA • Medical Office expansion • Community Center North Adams Regional Hospital – North Adams, MA • MRI addition Lowell General Hospital – Lowell, MA • Cafeteria Renovations • Cath Lab Expansion Lahey Hospital – Peabody, MA • Linear Accelerator replacement • Medical office building renovation • Entry Vestibule Renovations Flatley Company Schraffts Center – Boston, MA • 3rd Floor Office Renovations Charles River Community Health Center – Waltham, MA • Medical Office renovation • Dental Clinic • Business office relocation • Pharmacy Golden Pond - ,MA • Phase III the Lofts Expansion Sebago Technics – Falmouth, ME • Blueberry Lane Falmouth roadway lighting Maine Franklin Memorial Hospital – Farmington, ME • Switchgear Replacement Mayo Regional Hospital – Dover Foxcroft, ME • Mechanical and Electrical Infrastructure Renovation • Patient Floor and SCU Renovation • Oncology Relocation • Central Sterile Room Renovation • Dryer replacement • Combustion Air renovation Downeast Community Hospital – Machais, ME • Emergency Department Expansion and Renovations • Urgent walk in care clinic Readington Fairview General Hospital – Skowhegan, ME • Emergency Department Addition and Renovations • Patient Floor Renovation • Lab Renovation • Oncology Relocation • Lightning Protection Millinocket General Hospital – Millinocket, ME • Oncology renovations Mount Desert Island Hospital – MDI, ME • Emergency Power Replacement St Joseph’s Hospital – Bangor, ME • Electrical One-Line documentation Jackson Lab – MDI, ME • Deaerator replacement Mr Philip Badger | Page of Placemakers Properties – Portland, ME • Thompson Point site Infrastructure Connecticut CCMC – Hartford CT • Emergency Department Psychiatric Care Unit • Data Closet HVAC upgrades • Cardiology Department relocation • Family Resource Center • Sleep lab • 1st Floor Renovations • 6th floor Room Renovation • PACU power renovation • ED Radiology Replacement • Fluoroscopy Renovation • 3rd Floor Electrical Room Expansion CCMC – Farmington, CT • Ambulatory Surgery Center • Ambulatory Surgery Center Expansion New Hampshire Lakes Region General Hospital – Laconia, NH • 4th Floor Patient room Renovation • 2nd floor Women’s center • Walk in Urgent Care • Emergency Department Renovation and Expansion • Urology department Rhode Island South County Hospital – Wakefield, RI • Generator Replacement Other Ellsworth YMCA – Ellsworth, ME • Day Care Center The Nature Conservancy – Brunswick, ME • Office relocation – LEED and WELL certified MDI Biological Lab – MDI, ME • Biological Lab Building Mr Philip Badger | Page of Darlings – Bangor, ME • Showroom renovation UMPI – Presque Island, ME • Greenhouse building RFGH – Skowhegan, ME • MRI addition Maine Maritime Academy – Castine, ME • Shore Power renovations Jared Merry, PE Professional Engineer Jared Merry has 15 years of engineering experience related to the design of mechanical and electrical systems Jared has worked on a wide range of projects including HVAC systems and controls analysis and design, boiler plant systems, including oil, gas, and wood pellet fired boilers, chiller/refrigeration systems, air handling systems, as well as plumbing design and analysis and electrical design and analysis systems Jared also has experience in Alternative Energy analysis, review and design, fire protection and alarm systems design, and construction estimating As project manager, Jared is responsible for scheduling, feasibility, monitoring, pre-bid meetings, and commissioning report reviews Core Expertise Mechanical Design Electrical Design jmerry@cesincusa.com (207) 989-4824 Auto CAD Education Professional History B.S (2003) Mechanical Engineering, University of Maine Present Registrations CES, Inc Professional Engineer State of Maine (#11679) 2017 – 2019 Mike Marquis Mechanical, Inc Project Engineer / Project Manager / Project Estimator 2013 – 2017 Edison Chouest Offshore Marine Engineer 2003 – 2013 Carpenter Associates Consulting Engineers Project Engineer / Project Manager Mr Jared Merry | Page of Professional Engineer, Project Experience VA Medical Center | White River Junction, VT Jared evaluated, recommended, and designed the upgrades to the existing HVAC system for a story (80,000sq.ft.) research laboratory building He performed Heating/Cooling and Ventilation calculations to meet the clients’ specific needs and selected the required equipment which included three large handlers, rooftop chillers with buffer tanks, laboratory hood exhaust fans, a steam reduction station, steam to hydronic heat exchanger, implementation of DDC controls, minor duct revisions, and incidental power upgrades Jared reviewed submittals, and monitored construction progress intermittently for the duration of the project Downeast Orthopedics | Bangor, ME Jared was responsible for designing the HVAC and Electrical Systems for a new MRI Suite at Downeast Orthopedics Machias Savings Bank | Brewer, Maine Jared was responsible for designing the HVAC system, electrical system, and plumbing system for a two-story bank He was responsible for the sizing, selection, zoning, and layout of all the MEP systems The HVAC consisted of a variable speed air handler with an exterior chiller, variable air volume boxes, hydronic radiant heating, and a radiant snow melt system, and DDC Control System The electrical design included planning the service entrance size and location with the local utility company, layout of power devices, equipment connections, wire and conduit sizes, constructing one-line diagrams for power distribution and tel/data, calculating lighting levels and controls, and balancing power loads on the panels Plumbing design included sizing and layout of sanitary, vent, and potable water distribution piping, and selecting and locating plumbing fixtures to meet standard and ADA requirements Bangor International Airport | Bangor, Maine Jared worked to obtain existing structural, site, and utility conditions for 15 buildings of variable size, construction type, and occupancies at BIA for sprinkler systems His scope of work included providing existing building floor plans and specifications via CAD, submittal review, and construction monitoring The sprinkler systems included wet systems, dry systems, and high expansion foam systems Obtaining existing conditions entailed working with the Bangor Water District to plan, analyze, and recommend improvements to the existing water distribution system to provide adequate supply water for the sprinkler systems Bangor High School | Bangor, Maine Jared was responsible with assisting in the design and specifications needed in order to draft plans for a replacement theater lighting system for the Peaks Auditorium in the Bangor High School Mr Jared Merry | Page of Penquis Cap | Bangor, Maine Jared provided the design, CAD drafted plans, and specifications of MEP systems for a new building, 28-unit apartment complex His work included limited construction monitoring and submittal review Jared worked on the plumbing, lighting, electricity, telecommunications system, data communications systems, as well as the heating and ventilation systems Maine Air National Guard | Bangor, Maine Jared worked to design plans, specifications and CAD draft plans for an Air Dehydration system, lighting system, and power system for a new 15,000 sf building of the Maine Air National Guard Mary Snow School | Fruit Street School | Bangor, Maine Jared was Project Engineer for boiler replacements and required upgrades of low pressure steam boilers, vacuum pump systems, combustion and ventilation air systems, and an oil supply system for both schools Bangor International Airport | Bangor, Maine Obtain existing conditions, design and CAD draft plans; provide specifications for a new PVC roof system for a 13,500-sf building Assist in obtaining existing electrical conditional and future electrical requirements for conversion of 240/460 volt to 120/208-volt electrical system for an airplane hangar Assess multiple heating systems for a 60,000-sf airplane hangar CAD draft plans, provide specifications for a new 10,000 sf building Mr Jared Merry | Page of Sensible Solutions www.cesincusa.com ... Kennebunk Summer Street Kennebunk, Maine 04043 RE: Town of Kennebunk Facilities Assessment & Masterplan Letter of Interest and Statement of Qualifications Architectural and Engineering Services... retail drive-thru pharmacy with mail order services, a new threeoperatory dental clinic with lab and x-ray services, and the redesign of offices, hallways, restrooms, and check-in, check-out stations... ventilation and air conditioning system was designed by CES and CES provided construction guidance and support during installation Town of Kennebunk Facilities Assessment & Masterplan | 10.07.2020 | 11937. 002

Ngày đăng: 02/11/2022, 12:58

w