1. Trang chủ
  2. » Ngoại Ngữ

spur53-meeting-presentation-031714

21 1 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 21
Dung lượng 1,02 MB

Nội dung

SPUR 53 (UTSA BOULEVARD) PUBLIC HEARING Spur 53 from IH 10 to Babcock Road SPUR 53 (UTSA BOULEVARD) FROM: IH 10 TO: BABCOCK ROAD CSJ: 2230-02-004 AND 0915-12-459 SAN ANTONIO, BEXAR COUNTY, TX  PUBLIC HEARING  March 17, 2014 Spur 53 from IH 10 to Babcock Road Monroe May Elementary School 15707 Chase Hill Boulevard San Antonio, Texas 78256 Agenda     Welcome Project Overview Environmental Overview Public Comments Spur 53 from IH 10 to Babcock Road Welcome Purpose of the Public Hearing: To solicit feedback from the community regarding proposed improvements Options for Commenting: 1) Verbal comments will commence after the presentation 2) Written comments can be placed in the comment box 3) Fax comments to 210-615-6295 4) E-Mail comments to: barrlynn.west@txdot.gov 5) Mail comments to: Texas Department of Transportation Attn: Barrlynn West P.O Box 29928 San Antonio, TX 78229-0928  Deadline for comments: March 27, 2014  Public Hearing Report will be posted at www.txdot.gov when analysis is complete Spur 53 from IH 10 to Babcock Road Welcome (Introductions)  Elected Officials Present  TxDOT Representatives  Project Team Members Spur 53 from IH 10 to Babcock Road Project Overview (Location Map) Spur 53 from IH 10 to Babcock Road Project Overview (Need and Purpose)  Need: Traffic congestion that is expected to worsen and growth of The University of Texas at San Antonio (UTSA)  Purpose: To improve mobility for vehicles and pedestrians within the project limits Spur 53 from IH 10 to Babcock Road Project Overview (Project Description)  Project Length : 2.35 miles  From Babcock Road to UTEX Boulevard : Expand from a 2lane roadway to 4-lane roadway with curb, storm sewer, and pedestrian and bicycle accommodations  From UTEX Boulevard to IH 10: Existing lanes - re-stripe existing outside lane to serve as shared use lane, and add sidewalk on south side of roadway  Provide medians from Babcock Road to Edward Ximenes Avenue  Improvements would require additional right-of-way and an easement Spur 53 from IH 10 to Babcock Road Project Overview (Previous Public Involvement)  Two previous public meetings were held for the project, one in December 2007 and one in November 2008  Multiple Stakeholder meetings have been held with individuals, HOA’s, and UTSA  Design changes in response to public comment: – Shifted alignment in central portion of project away from residents to reduce traffic noise and reduce impacts to trees – Construct shared use path on both sides of the roadway from Babcock Road to Valero Way – Construct right turn lanes into Edward Ximenes Ave and James Bauerle Blvd Spur 53 from IH 10 to Babcock Road Project Overview (Typical Sections) Existing Typical Section From Babcock Road to UTEX Blvd Proposed Typical Section From Babcock Road to Edward Ximenes Ave (Varies) Spur 53 from IH 10 to Babcock Road 10 Project Overview (Typical Sections) Proposed Typical Section From Babcock Road to Edward Ximenes Ave (Varies) Proposed Typical Section From Edward Ximenes Ave to Valero Way Spur 53 from IH 10 to Babcock Road 11 Project Overview (Typical Sections) Existing Typical Section From UTEX Blvd to IH 10 Proposed Typical Section From UTEX Blvd to IH 10 Spur 53 from IH 10 to Babcock Road 12 Project Overview (Project Planning and Funding)  Programmed in the 2013-2016 Transportation Improvement Program (TIP)  Total Estimated Construction Cost: $18.7 Million – TxDOT: $7.6 Million – CoSA: $11.1 Million  Funding Source: – TxDOT: State and Federal Funds – CoSA: Local and Federal Funds Spur 53 from IH 10 to Babcock Road 13 Project Overview (Project Schedule)  Anticipated Environmental Clearance: Spring 2014  TxDOT Letting Date: Summer 2014  CoSA Letting Date: Spring 2015  Construction Duration: Approximately Years per project Spur 53 from IH 10 to Babcock Road 14 Environmental Overview Key Environmental Issues Studied:  Traffic Noise  Edwards Aquifer  Vegetation  Threatened and Endangered Species  Section 4(f) and Chapter 26 Spur 53 from IH 10 to Babcock Road 15 Environmental Overview Traffic Noise:  Noise barriers were determined to be reasonable and feasible at locations Edwards Aquifer:  Project is on Edwards Aquifer Recharge Zone and the Contributing Zone Within the Transition Zone  Water Pollution Abatement Plan Spur 53 from IH 10 to Babcock Road 16 Environmental Overview Vegetation Impacts:  6.9 acres of Grassland/Mixed Herbaceous vegetation  2.5 acres of Mixed Deciduous Woodland vegetation  0.5 acre of Riparian vegetation Threatened and Endangered Species Impacts:  May affect, but not likely to adversely affect federally listed Golden-cheeked Warbler (GCW)  May affect, but not likely to adversely affect federally listed karst invertebrates in Karst Zone Spur 53 from IH 10 to Babcock Road 17 Environmental Overview Section 4(f) and Chapter 26:  The proposed project would require additional ROW from UTSA and SAWS These properties are subject to Section 4(f) and Chapter 26 regulations  Under Section 4(f) of the 1966 Transportation Act, projects which impact or use public parks, recreation areas, wildlife or waterfowl refuges and historic sites, must perform a 4(f) evaluation • De Minimis Determination  Chapter 26 of the Parks and Wildlife Code applies whenever TxDOT proposes to use or take any public land designated and used as a park, recreation area, scientific area, wildlife refuge, or historic site • Must hold a public hearing Spur 53 from IH 10 to Babcock Road 18 Environmental Overview Environmental Assessment:  Further details are provided in the Environmental Assessment (EA)  Project plans and the EA are available for viewing tonight  Project information can be viewed at the San Antonio TxDOT District office from 8am to 5pm Monday through Friday: TxDOT San Antonio District Office 4615 NW Loop 410 San Antonio, TX 78229 Spur 53 from IH 10 to Babcock Road 19 Public Comments Options for Commenting:  Verbal comments will commence after the formal presentation  Written comments can be placed in the comment box  Fax comments to 210-615-6295  E-Mail comments to: barrlynn.west@txdot.gov  Mail comments to: Texas Department of Transportation Attn: Barrlynn West P.O Box 29928 San Antonio, TX 78229-0928  Deadline for comments: March 27, 2014  Public Hearing Report will be posted at www.txdot.gov when analysis is complete Spur 53 from IH 10 to Babcock Road 20 VERBAL COMMENTS SPUR 53 (UTSA BOULEVARD) PUBLIC HEARING Spur 53 from IH 10 to Babcock Road

Ngày đăng: 30/10/2022, 17:10