1. Trang chủ
  2. » Ngoại Ngữ

Rehabilitation Effectiveness Monitoring Plan For Replacement Structures on the Lolo National Forest

7 2 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 7
Dung lượng 534,5 KB

Nội dung

Aquatic and Engineering Resources Lolo National Forest Rehabilitation Effectiveness Monitoring Plan For Replacement Structures on the Lolo National Forest Introduction This plan outlines the ongoing monitoring process for assessment of road-stream crossing rehabilitation work completed by the aquatic and engineering staffs of the Lolo National Forest This plan encompasses structures installed since 1996 that fulfill Regional standards for aquatic organism passage and accommodation of 100-yr design flood magnitude Using a “stream simulation” approach, the design goal is for the new structure to be transparent to species moving up and down the stream while also providing for natural stream processes The premise of stream simulation design is that similar physical characteristics between the actual stream and through the structure implies similar species passage conditions Accommodation of the 100-year design discharge means that there will be no back-water conditions and the structure and site are intended to withstand large flood events with minimal damage and will reasonably maintain all design features Monitoring of these structures allows us to assess if they are functioning as intended, and if not, provides meaningful data for determining what remediation actions are necessary to achieve the design goal Goal and Objectives The monitoring goal is to compare the physical characteristics of the adjoining upstream channel with characteristics within the crossing structure (e.g culvert, bridge, bottomless arch, etc.) to assess if stream simulation design components exist and are being maintained Monitoring plan framework and protocols address the following objectives:    Maintain the established monitoring framework and protocols existing in this document (i.e this plan represents the absolute basic information necessary for meaningful monitoring and has been specifically designed to be doable, each year, despite personnel and budget limitations If more detailed data is desired, can be afforded, or is needed, it should be a supplement to the data collected in accordance with this plan.) Provide core data necessary to determine if the crossing is meeting the intent of stream simulation design and if additional data collection and analysis are necessary to formulate a conclusion If necessary, provide data from which remediation action can be recommended Authors: Traci L Sylte and Shane Hendrickson Last Updated: tls 10/19/2022 /storage1/vhost/convert.123doc.vn/data_temp/document/eyh1666074401-127619916660744011147/eyh1666074401.doc Aquatic and Engineering Resources Lolo National Forest  Provide summaries of findings and recommendations to improve future design and construction methods The table below provides design parameter, criteria, and field methods used to fulfill objectives Design Parameter Assessed Field Method Evaluation and/or Effectiveness Criteria Site Condition and Stability Identify and provide comment on at least the following features: road fill erosion, inlet debris blockage, footing scour, culvert floor exposure, piping, lateral erosion, or other noticeable concerns Stream Channel Dimensions and Substrate Conditions Measure the natural bankfull channel width and take photos, measure, sketch, and comment on dimensions through the structure Stream Gradient Measure the stream thalweg and water surface slope above, through, and downstream of the crossing structure Additional Data Collection Completion of Field Form and Photos Recommendations for Future Design and Construction Improvements Completion of Field Form and Photos Presence/Absence: If any of these features are present, an engineer and/or hydrologist will determine if either the stream or structure integrity is compromised If the integrity is compromised or risk of failure or impairment is moderate to high, remediation actions will be taken Comparison to Natural Dimensions with Assessment of Impact if Departure Occurs: If stream conditions cause a depth, leap, or velocity barrier to aquatic species, or if dimensions not accommodate flood capacity, remediation actions will be planned immediately Comparison to Natural Gradient: If the stream gradient has discontinuities from the natural gradient that cause risks to substrate stability or present aquatic species passage risks, remediation actions will be planned immediately., Upon review of all data on the field form and photos, and engineer, fisheries biologist, and/or hydrologist will determine if site conditions warrant additional data collection Upon review of all data on the field forms, the annual summary report will identify lessons learned and provide recommendations for design and construction advancements Stream Simulation Approach The stream simulation design method was created as an alternative to conventional methods to pass a wide variety of aquatic and semi-aquatic species The basic concept of stream simulation is that species have evolved to meet the Authors: Traci L Sylte and Shane Hendrickson Last Updated: tls 10/19/2022 /storage1/vhost/convert.123doc.vn/data_temp/document/eyh1666074401-127619916660744011147/eyh1666074401.doc Aquatic and Engineering Resources Lolo National Forest passage challenges of natural channels and if we reproduce the primary characteristics of the stream inside the culvert, species passage is implied, if not assured Typically, designs use the upstream channel as a reference to replicate within the structure The minimal width that the structure spans is the bankfull channel width, but more often than not 1-2 feet of stream bank on either side of the bankfull width is desired Designs and construction techniques are still evolving to achieve the desired stream cross-section and bed features In reality, designs are challenged to optimize channel features under the constraint that, unless the entire valley bottom is spanned, true stream simulation can not be achieved (i.e natural lateral and vertical variation is limited and accommodation of the largest ranges of possible flood discharges and debris torrents is not possible) However, the basic premise is that these culverts will allow most processes and hydraulic conditions important for fish and wildlife migration and the transport of water and materials downstream Methods Monitoring Frequency To the extent possible, as-built monitoring will occur immediately following construction with future monitoring as necessary to assess performance measures immediately following flood events that have the ability to change site conditions Documentation Refer to the Appendix for a template of the field data forms The data forms are designed to be quick and easy, yet, collect meaningful data (2-3 hours is the average data collection time conducted by an experienced, two-person team) The data collection is a combination of qualitative and quantitative formats Sketches and photo points are key components that provide a visual record, as well as offer a of which additional measured values can be obtained An annual monitoring report will be prepared by either water or fisheries resource staff This report will: (1) summarize current year work and findings; (2) update Forest totals; and (3) as necessary provide recommendations for mitigation actions References and Acknowledgement The following references provided the framework and some narration for this document Harris, Richard R., 2005 Monitoring the Effectiveness of Culvert Fish Passage Restoration Final Report for California Department of Fish and Game Center for Forestry, University of California, Berkeley Authors: Traci L Sylte and Shane Hendrickson Last Updated: tls 10/19/2022 /storage1/vhost/convert.123doc.vn/data_temp/document/eyh1666074401-127619916660744011147/eyh1666074401.doc Aquatic and Engineering Resources Lolo National Forest Lacy, Mark, and Barry Thom, 2000 Restoration Effectiveness Monitoring Plan for the Western Oregon Stream Project Monitoring through June 2008 Oregon Department of Fish and Wildlife, Corvallis, Oregon Authors: Traci L Sylte and Shane Hendrickson Last Updated: tls 10/19/2022 /storage1/vhost/convert.123doc.vn/data_temp/document/eyh1666074401-127619916660744011147/eyh1666074401.doc Aquatic and Engineering Resources Lolo National Forest Appendix Stream Simulation Monitoring Form As-Built Survey Field date: _ / / Post-Built Survey Surveyor name(s): _ SITE Stream name: Forest Map with crossing site circled (check box when attached) Forest _ District _Road number: INFRA milepost (if possible, but not required): _ Legal description: T _ _ S / N, R _ _ E / W, Sec _ _, _ _ ¼ of _ _ ¼ Principal meridian _ (If GPS used: X/Y Coordinates Coordinate system Datum _) STRUCTURE and SITE CONDITION Shape Circular Box (concrete or other) Open-bottom arch Pipe-arch Ford Bridge Dimensions (inches) Width: _ Height*: _ Length: *Height is not possible on counter-sunk culverts Material Corrugated Metal; Structural Steel; Concrete Rust/Stain line: (feet from stream bottom) Site Condition Fill eroding Debris plugging inlet (% of opening blocked ) Debris blocking culvert Water flowing under culvert Footings or Abutment Scoured Poor alignment with stream Culvert Floor Exposed Other Describe overall condition STREAM STREAM CHANNEL DIMENSIONS (Taken upstream of the zone of structure influence) Bankfull Width STREAMBED SUBSTRATE RETENTION IN STRUCTURE Substrate is continuous throughout structure: Distance to substrate from top of culvert or bridge inlet ft; Distance to substrate from top of culvert or bridge outlet ft No substrate in structure Discontinuous layer of substrate in structure begins at _ ft; ends at ft (measured from inlet) STREAMBED SPECIAL FEATURES WITHIN STRUCTURE (WEIRS, VANES, BANDS, INDIVIDUAL ROCKS) Describe type, spacing, size (include in the sketch and provide photo) SUBSTRATE PARTICLE SIZES (estimate relative proportions up to 100%) Bedrock Boulders Cobbles Gravel Sand Silt/Clay Through/Inside the Structure Authors: Traci L Sylte and Shane Hendrickson Last Updated: tls 10/19/2022 /storage1/vhost/convert.123doc.vn/data_temp/document/eyh1666074401-1276199-16660744011147/eyh1666074401.doc Aquatic and Engineering Resources Lolo National Forest Upstream of Structure Influence GRADIENT (Brief longitudinal profile Lay out tape from upstream location through structure to downstream location and use laser level for all shots except those within the crossing – within the crossing just measure from the “ceiling” of the structure down to the bed and water surface) Station Tape Distance Upstream of Inlet At Inlet Inside of Structure Extra Inside of Structure At Outlet 5.Downstream of Outlet Rod Reading Location Description @ Stream Bottom @ Water Surface @ Stream Bottom @ Water Surface @ Stream Bottom @ Water Surface Top of Culvert (or Bottom of Bridge Superstructure) @ Stream Bottom @ Water Surface Distance to Stream Bottom Distance to Water Surface Distance to Stream Bottom Distance to Water Surface Top of Culvert (or Bottom of Bridge Superstructure) @ Stream Bottom @ Water Surface @ Stream Bottom @ Water Surface @ Stream Bottom @ Water Surface @ Stream Bottom @ Water Surface PHOTOGRAPHS -identify and provide captions Photo caption Directions Use this row if you need more than two stations upstream of the inlet Use this row if you need more than one station upstream of the inlet Location at top of breakpoint coming into the crossing inlet Location right at the crossing inlet Distance from the top of the culvert (or bottom of the bridge) down to ws or bed Use this if you need to get more than one location within the structure (bed varies substantially); otherwise leave blank Location right at the crossing outlet Location at top of breakpoint coming into the crossing inlet Use this row if you need more than one stations downstream of the outlet Use this row if you need more than two stations downstream of the outlet Required photos: Inlet from upstream Outlet from downstream Inside or Through Structure (turn flash on) Comments Inlet from upstream Outlet from downstream Inside of Structure* * Turn the flash on Comments: (List anything of interest, anything abnormal; general observations, etc.) Authors: Traci L Sylte and Shane Hendrickson Last Updated: tls 10/19/2022 /storage1/vhost/convert.123doc.vn/data_temp/document/eyh1666074401-1276199-16660744011147/eyh1666074401.doc Aquatic and Engineering Resources Lolo National Forest STREAMBED SKETCH – CROSS-SECTION, PLAN, AND PROFILE VIEWS Cross Section at Inlet Cross Section at Midpoint Cross Section at Outlet Cross Section Directions: Draw substrate in cross sections Measure and record cross-section dimensions of each cross section This includes the width and depth, as well as width of banks, etc If the structure is a bridge or is bottomless, just sketch the cross-section within the ovals provided Plan View Directions: show substrate in plan view with dimensions and any features installed or occurring within the structure that function as grade control Measure distances of structures from the inlet Profile View Directions: - draw profile of substrate and any features installed or occurring within the structure including grade control structures at the inlet or outlet with dimensions Measure Authors: and Traci L Sylte and Shane record all distances pulledHendrickson from the inlet Last Updated: tls 10/19/2022 /storage1/vhost/convert.123doc.vn/data_temp/document/eyh1666074401-1276199-16660744011147/eyh1666074401.doc ... warrant additional data collection Upon review of all data on the field forms, the annual summary report will identify lessons learned and provide recommendations for design and construction advancements... Thom, 2000 Restoration Effectiveness Monitoring Plan for the Western Oregon Stream Project Monitoring through June 2008 Oregon Department of Fish and Wildlife, Corvallis, Oregon Authors: Traci... Richard R., 2005 Monitoring the Effectiveness of Culvert Fish Passage Restoration Final Report for California Department of Fish and Game Center for Forestry, University of California, Berkeley

Ngày đăng: 18/10/2022, 13:26

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN

w