Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống
1
/ 77 trang
THÔNG TIN TÀI LIỆU
Thông tin cơ bản
Định dạng
Số trang
77
Dung lượng
4,49 MB
Nội dung
Environmental Monitoring Report Special Report February 2017 VIE: Greater Mekong Subregion Ben Luc-Long Thanh Expressway Project - Tranche Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB Review Mission, 17-24 October 2016 Prepared by Dasan Consultants Co., Ltd in joint venture with Kunhwa Engineering & Consulting Co., Ltd and International Consultants and Technocrats Pvt, Ltd for the Vietnam Expressway Corporation, the Ministry of Transport of Vietnam, and the Asian Development Bank CURRENCY EQUIVALENTS (as of 10 February 2017) VND1.00 = $0.000045 $1.00 = VND22,286 NOTE In this report, "$" refers to US dollars unless otherwise stated This environmental monitoring report is a document of the borrower The views expressed herein not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area