1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

MS for finish painting work

5 8 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 5
Dung lượng 228,35 KB

Nội dung

Saigon M&C Tower Project Method Statement For Fire Stopping I General II Aim III Scope of works IV Methodology Carbon steel pipe system Support system Tray - Trunking system A 14/03/08 C.T.P FIRST ISSUE Page L.Q.K J.R.P Saigon M&C Tower Project Method Statement For Fire Stopping I General: Items: - The Method Statement For Painting Works II Aim: The aim of works is to describe painting installation works for carbon steel pipe, support, tray/trunking…to ensure compliance with contract requirements approved shop drawings, materials, specification and quality control III Scope of Works: This scope of work shall include painting system of the SAIGON M&C TOWER project III Methodology: 1) Before primer, all dirt, dust, grease, oil or other foreign matters shall be removed by scrapers, wire brushes and solvents 2) All finished surfaces shall be free from runs, drops, ridges, waves, laps, brush marks and variations in color, texture and finish Coverage shall be complete, and each coat shall be so applied as to produce a film of uniform thickness Special attention shall be given to ensure that all surfaces including edges, corners, crevices, welds and rivets receive a film thickness equivalent to that of adjacent painted surfaces 3) Adjacent areas and installations shall be protected by the use of masking tape, drop cloths or other approved precautionary measures Metal surface adjacent to surfaces to receive water thinned paints shall be primer and/or touched-up prior to the application of water thinned paints 4) The first coat on render or board finishing shall include such repeated touching up of suction spots to produce a uniform color 5) Paint only in a well-ventilated area for avoided poisoning with thinner 6) Attention to all material and floor on the painting area for avoid paint dripping and damages 7) Colour of paint shall be showed as table Page Saigon M&C Tower Project Method Statement For Fire Stopping Table 1: Paint colour schedule System Colour of Primer coat Colour of Finishing paint Air conditioning pipe Fire protection pipe Plumping pipe Oil pipe Red Red Red Red Brown/Red Red Grey/Blue Yellow Tray -Trunking By manufacture By manufacture Support Red/Grey N/A Remarks Approved by the engineer Carbon steel pipe system # Step by step painting: ? Clean the pipe surface, removed all dirt, dust, oil, grease…etc ? Primer coat (Primer shall be one coat) ? Second coat (Finish painting shall be two coat) a) Primer coat (Anticorrosive paint) ƒ Spreading rate: 0.182kg/m2/coat ƒ Paint brush or roller coating ƒ Colour of paint follow table b) Second coat (Finishing paint) ƒ Spreading rate: 0.059kg/m2/coat ƒ Paint brush or roller coating ƒ Colour of paint follow table Support system ? Clean support, removed all dirt, dust…etc ? Primer coat (Anticorrosive paint) Primer coat (Anticorrosive paint) ƒ Spreading rate: 0.182kg/m2/coat ƒ Paint brush or roller coating ƒ Colour of paint follow table Tray-Trunking system ? Power coating (by manufacturer) and approved by the engineer Page Saigon M&C Tower Project Method Statement For Fire Stopping Page Saigon M&C Tower Project Method Statement For Fire Stopping Illustration for finish painting work Page ... Project Method Statement For Fire Stopping I General: Items: - The Method Statement For Painting Works II Aim: The aim of works is to describe painting installation works for carbon steel pipe,... Saigon M&C Tower Project Method Statement For Fire Stopping Page Saigon M&C Tower Project Method Statement For Fire Stopping Illustration for finish painting work Page ... control III Scope of Works: This scope of work shall include painting system of the SAIGON M&C TOWER project III Methodology: 1) Before primer, all dirt, dust, grease, oil or other foreign matters

Ngày đăng: 27/03/2022, 18:04

w