Method statement and Job Safe Analysis for concrete slab 1. Purpose : The purpose of this document is to describe the method for concrete slab and to details out the step to be taken to meet EHS and technical requirements for concrete slab. 2. Scope of work : This method statement covers the works which related to concrete slab work at site (workshop floor).This is also describes details of EHS requirement, equipment, manpower. 3. Responsibilities : It is overall responsibility of project manager to organize resources to perform concrete slab work activities as per project specification in with schedule and safety requirements. EHS Manager will ensure coordination with Site Manager and Site Supervisor that all measure taken shall be maintained until completion of job.