1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

MS for labelling installation work

8 7 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Saigon M&C Tower Project Method Statement For Label Installation Work General Aim Scope of works Material Methodology Identification marking for pipe size Under 80A Identification marking for pipe size from 100A and Over Identification marking for Cable support Identification marking for Equipment - 17/04/08 C.T.P N.A.K FIRST ISSUE Page 2/9 L.Q.K J.R.P Saigon M&C Tower Project Method Statement For Label Installation Work General: Items: - The Method Statement For Label Installation Works Aim: The aim of works is to describe label installation works for piping, cable support, equipments…to ensure compliance with contract requirements approved shop drawings, materials, specification and quality control Scope of Works: This scope of work shall include label installation system at basement areas, riser shaft, pipe shaft, and exposed areas of the SAIGON M&C TOWER project Material Material label: Letter signs and arrow are printed on decal tape with adhesive and approved by the engineer Methodology Table 1: Size of label, arrow, lettering schedule Outside diameter of pipe Size of Label Length of Arrow Height of letter letter letter letter letter letter letter Under 80A 90x30 120x30 140x30 40x10 50x10 60x10 20 100A and over 150x50 200x50 240x50 80x20 90x20 100x20 35 Cable support 200x50 NA 35 Equipment 250x80 or larger NA 50 Page 3/9 Saigon M&C Tower Project Method Statement For Label Installation Work Table 2: Colour of label, arrow, letter sign schedule Colour System Letter sign Label Letter & Arrow CHWS CHWR CWS CWR D/AC V/AC SP DP WP D/SP HP WFP BIP TP CWP HWP White White White White White White White White White White White White White White White White Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black WS White Black RS SS KWS White White White Black Black Black VS White Black Oil pipe LPG pipe High voltage OIP LPG HV White White White Black Black Black Low voltage Extra low voltage LV ELV White White Black Black Chilled water supply Chilled water return Condenser water supply Condenser water return AC Drain AC Vent Sprinkler pipe Drencher pipe Wet pipe Drain sprinkler pipe Hosereel pipe Water supply for fire tanks Breaching inlet pipe Transfer pipe Cold water pipe Hot water pipe Waste pipe stack Rain pipe stack Soil water pipe stack Kitchen waste stack Vent stack Identification marking for pipe size Under 80A: ? Check the pipe size ? Apply label size, arrow length and letter sign type over the pipe follow the flow direction (see table 1) ? Colour of label, arrow and letter sign refer to table ? Interval of marking = 9m #Note: ? Letter sign not application for small pipe 25A Page 4/9 Saigon M&C Tower Project Method Statement For Label Installation Work LETTER 140 70 60 17 10 20 43 LETTER 120 60 50 33 17 10 20 30 LETTER 90 40 40 25 15 5 10 20 5 30 30 5 Typical label dimension for pipe size Under 80A Page 5/9 Saigon M&C Tower Project Method Statement For Label Installation Work Identification marking for pipe size from 100A and Over ? Check the pipe size ? Apply label size, arrow length and letter sign type over the pipe follow the flow direction (see table 1) ? Colour of label, arrow and letter sign refer to table ? Interval of marking = 9m LETTER 130 100 35 35 20 65 7.5 LETTER 200 100 90 7.5 33 35 20 57 7.5 50 50 7.5 240 Page 6/9 Saigon M&C Tower Project Method Statement For Label Installation Work LETTER 150 30 35 20 50 7.5 50 80 7.5 60 Typical label dimension for pipe size from 100A and Over Identification marking for Cable support ? Apply label size, letter sign type over the cable support (see table 1) ? Colour of label, arrow and letter sign refer to table ? Interval of marking = 6m 51 35 24.5 7.5 50 7.5 100 Page 7/9 24.5 Saigon M&C Tower Project Method Statement For Label Installation Work 51 24.5 35 24.5 7.5 50 7.5 100 70 15 35 15 7.5 50 7.5 100 Typical label dimension for cable support #Note: ? Letter signs are written between label frame ? Label size shall be according to letter sign size Identification marking for Equipment ? Apply label size and the letter sign over equipments (see table 1) ? Colour of label and letter sign refer to table #Note: ? Label should be put equipment center and can see easily Page 8/9 Saigon M&C Tower Project Method Statement For Label Installation Work 250 150 50 50 15 80 15 50 Typical label dimension for Domestic WaterTransfer Pump 250 230 10 50 15 80 15 10 Typical label dimension for Exhaust Air Fan 370 340 15 80 50 15 15 Typical label dimension for Generator Page 9/9 15 ... Method Statement For Label Installation Work General: Items: - The Method Statement For Label Installation Works Aim: The aim of works is to describe label installation works for piping, cable... 30 30 5 Typical label dimension for pipe size Under 80A Page 5/9 Saigon M&C Tower Project Method Statement For Label Installation Work Identification marking for pipe size from 100A and Over... Project Method Statement For Label Installation Work LETTER 150 30 35 20 50 7.5 50 80 7.5 60 Typical label dimension for pipe size from 100A and Over Identification marking for Cable support ? Apply

Ngày đăng: 27/03/2022, 18:06

Xem thêm:

w