Ngày tải lên: 16/06/2014, 09:30
... installation of RM2000 and GP2000. Please always uninstall old program versions before installing a new program release! 1.2 Unit dependency of Import/Export of RM2000 Export and Import of RM2000 ... Version 8.46.05 • Pre-processor for suspension bridges in structure-special • Compensation of element length macro in structure-special • Demonstration of new postprocessor look (TDF) in structure-special ... of stresses due to state II (Cracked concrete). • New module FibTnd: Print out of normal stresses and forces in tendon for two load cases ( t-0, t-infinity). • New module TndChk: Control of...
Ngày tải lên: 06/09/2012, 15:18
Static and Dynamic Analysis of Spaceframes
... Ownership of the program and the documentation remain with TDV Austria. Use of the program and the documentation is restricted to the licensed users. Unlicensed use of the program or reproduction of ... Inp1: Number of Seismic Load (e.g.:1) Out1: (e.g.: seismic-x.sup) Specify the Response Spectrurm: Type of Resp.Spec. graph: d,v or a Load vector components definining the direction of the displacement, ... –500kNm): Elements 5 to 17 in steps of 3 at element begin DOF Mz Val-max = val-min = -500 Action Select ‘Action’ Insert ‘Re-start’ in the Action colum n of the Construction Schedule using:...
Ngày tải lên: 06/09/2012, 15:55
Static and Dynamic Analysis of Spaceframes
... CONSTR.SCHEDULE Definition of loading and construction stages. "RECALC Definition of calculation parameters and start of the calculation. "RESULTS Viewing of results and creating of output files ... hand side of the screen. #LOADS Definition of load cases. #ADDCON Definition of Additional Constraints (see chap. 6.11 ) #STAGE Definition of constructions stages. On selection of "RECALC, ... 3) b) Structure (definition of the geometry of the model and the interaction conditions of the different parts of the model) (Chapter 4) c) Loading (definition of the impacts on the structure...
Ngày tải lên: 06/09/2012, 15:55
Statnamic testing of piles in clay 1
... adsorbed water layer of the adjacent particle. The viscosity of the adsorbed water is larger than that of the free water. Deep penetration of the contact, as in the case of over- consolidated ... resistance in a dynamic pile test [kN] F o Initial downward force in a dynamic pile test [kN] F r Net force at a time of t = 2L/c later than the time of obtaining F o in a dynamic test [kN] ... behaviour of the soil around the pile were also reported and discussed. iv TABLE OF CONTENTS Page ABSTRACT ii ACKNOWLEDGEMENT iii TABLE OF CONTENTS iv LIST OF TABLES ix LIST OF...
Ngày tải lên: 07/11/2012, 10:44
Statnamic testing of piles in clay 2
... clay bed after 14 days of triaxial consolidation under a pressure of 280kPa. After pile installation the clay bed continued to be subjected to a pressure of Chapter 6 Testing data and discussions ... from that of a rapid load pile test, a new model will be proposed. It was found that the quake values of the pile shaft resistances of the rapid load tests were much higher than those of the ... pore water pressures of the later pile load tests were much lower than those of the first pile load tests, although the applied loads of the later tests were larger than those of the first tests....
Ngày tải lên: 07/11/2012, 10:44
KRONE - Guide Book - TESTING - Field Performance Testing of Copper & Permanent Link Chanel
... Permanent Links and Channels. Field Performance Testing V10 050111 Page 2 of 9 Performance Testing of Permanent Links and Channels Testing of telecommunications Permanent Links and Channels ... Field Performance Testing V10 050111 Page 3 of 9 2. Passive Testing With Hand-Held Field Testers There are currently three levels of hand-held field tester: Level 2e – for testing up to ... provided they have the latest software version loaded. The testing of Class E permanent links and channels necessitates using the correct adaptor head listed at the back of this document. The...
Ngày tải lên: 26/10/2013, 19:15
PERFORMANCE TESTING OF COPPER PERMANENT LINKS AND CHANNEL
... latest software specification limits are downloaded from tester manufacturer and stored in the testers. Field Performance Testing V10 050111 Page 2 of 9 Performance Testing of Permanent ... provided they have the latest software version loaded. The testing of Class E permanent links and channels necessitates using the correct adaptor head listed at the back of this document. The ... half-hour of continuous use. So if the test results seem low initially, re-test the low runs with a warmed up tester. Field Performance Testing V10 050111 Page 3 of 9 2. Passive Testing...
Ngày tải lên: 27/10/2013, 17:15
Tài liệu ADC KRONE - Guide - FO - Field Performance Testing of Fiber Link - ISO 11801 ppt
... Method of Reference Setting = Cl 9.1.1 of ISO/IEC 14763-3 Ed2 Similar to Method 3 of IEC 61280-4-1 Similar to Method C of TIA/EIA 526-14-A 1-Test Cord Method of Reference Setting = Cl 9.1.2 of ... Setting (Eg. SC on tester and SC on both ends of Link) OF Testing ADC KRONE Requirements V7_1&3T Dr2Page 1 of 12 PERFORMANCE TESTING OF OPTICAL FIBRE LINKS FOR COMPLIANCE TO ... (See Item 18) OF Testing ADC KRONE Requirements V7_1&3T Dr2Page 9 of 12 25 OTDR Testing, General Requirements 1. Use a Launch Cord and a Tail Cord for OTDR testing. [These Launch...
Ngày tải lên: 10/12/2013, 02:15
Tài liệu Dynamic Reconfiguration of Indoor Combination Networks Through the Use of Patch Panels pdf
... shelves without affecting service 7/05 • 1332621 Dynamic Reconfiguration Dynamic Reconfiguration of Indoor Combination Networks Through the Use of Patch Panels 2 www.adc.com • +1-952-938-8080 ... with Patch Panels at Different Stages Dynamic Reconfiguration of Indoor Combination Networks Through the Use of Patch Panels Executive Summary In terms of flexibility, the traditional combination ... Operation (Reconfiguration) Routing Through the Front Inserted Jack Alternative Through the Use of Radiofrequency Patch Panel Necessary Situation After Growth of Penetration In this example, subscriber penetration causes the...
Ngày tải lên: 10/12/2013, 18:15
Tài liệu FIELD PERFORMANCE TESTING OF COPPER PERMANENT LINKS AND CHANNEL Class D, Class E, Class EA pdf
... Released 08.05.2006 Field Performance Testing V15 060508 Page 2 of 11 Performance Testing of Permanent Links and Channels There are 3 distinct areas of cable testing; Certification, Qualification ... the latest software specification limits are downloaded from tester manufacturer and stored in the testers. Field Performance Testing V15 060508 Page 1 of 11 FIELD PERFORMANCE TESTING OF COPPER PERMANENT ... rigorous of all cable testing and uses the “Pass/Fail” criteria in one of the AS/NZS 3080, ISO/IEC 11801 or TIA/EIA 568 standards. The remainder of this document deals with Certification Testing...
Ngày tải lên: 12/12/2013, 12:15
Tài liệu ADC KRONE - Guide - Performance Testing of Optical Fiber Link doc
Ngày tải lên: 20/12/2013, 22:15
Tài liệu PERFORMANCE TESTING OF OPTICAL FIBRE LINKS pptx
... Method of Reference Setting = Cl 9.1.1 of ISO/IEC 14763-3 Ed2 Similar to Method 3 of IEC 61280-4-1 Similar to Method C of TIA/EIA 526-14-A 1-Test Cord Method of Reference Setting = Cl 9.1.2 of ... 2 of IEC 61280-4-1 Similar to Method B of TIA/EIA 526-14-A 198m FD ER 1 1 1m Splice OF Testing ADC KRONE Requirements V7_1&3T Dr2Page 4 of 12 15 Example A fibre link consists of ... KRONE (Asia Pacific) OF Testing ADC KRONE Requirements V7_1&3T Dr2Page 10 of 12 27 OTDR Testing, Unacceptable Results Due To Ghosting “Ghosting” is the persence of multiple peaks in...
Ngày tải lên: 22/12/2013, 12:15
02 three dimensional static and dynamic analysis of structure
... the equations of statics or the equations of geometry, in general, we should satisfy the equations of statics for the reasons previously stated. However, because of the existence of inexpensive ... group (or patch) of elements, of arbitrary shape, is subjected to node displacements associated with constant strain; and the results of a finite element analysis of the patch of elements yield constant ... the physical significance of both the potential and kinetic energy is the behavior of a pendulum shown in Figure 3.3. If the mass of the pendulum has an initial position of max h , the kinetic...
Ngày tải lên: 12/01/2014, 21:45
Tài liệu KRONE - Guide - TESTING - Field Performance Testing of Copper & Permanent Link Chanel pdf
... requirements. PL testing on PBE sites is not acceptable for a Warranty. Field Performance Testing V10 050111 Page 2 of 9 Performance Testing of Permanent Links and Channels Testing of telecommunications ... Field Performance Testing V10 050111 Page 3 of 9 2. Passive Testing With Hand-Held Field Testers There are currently three levels of hand-held field tester: Level 2e – for testing up to ... module end of a permanent link, are supported by Fluke Networks and by Krone Australia as acceptable adaptors for testing of permanent links to Class D performance. But with the release of the...
Ngày tải lên: 24/01/2014, 03:20
Tài liệu KRONE - Guide - TESTING - Field Performance Testing of Copper & Permanent Link Chanel (1) ppt
Ngày tải lên: 24/01/2014, 03:20
Tài liệu Static and Dynamic Analysis of the Internet’s Susceptibility to Faults and Attacks docx
Ngày tải lên: 18/02/2014, 01:20
Tài liệu Báo cáo Y học: Dynamic mechanism of nick recognition by DNA ligase ppt
Ngày tải lên: 21/02/2014, 01:21
Bạn có muốn tìm thêm với từ khóa: