... bad They can cause unpredictable changes in electrical properties of chips and cause systems to crash In the long term, these changes could lead to cracks in the circuit boards and irreparable chip ... automatic termination mechanisms integrated into the hardware The devices on the SCSI bus talk to the computer through a controller On modern PCs the SCSI controller is usually connected to the PCI ... maintain them 2.1.2 Computers All contemporary computers in common use are based on the Eckert–Mauchly–von Neumann architecture [235], sketched in figure 2.2 Each computer has a clock which drives a central...
Ngày tải lên: 03/06/2014, 01:29
... one of the three founders of Australia's first inter-University Electronic Commerce research and consulting group CollECTeR (Collaborative Electronic Commerce Technology and Research) Owen Cope ... identify the role of e-business and increase its acceptance rate Evaluate the Compatibility of Technologies Characteristics of technology such as complexity and suitability for the task for which it ... ebusiness projects, an iterative strategic planning cycle to incorporate the pace of technological change, an informational power base for access, control and manipulation of critical information...
Ngày tải lên: 14/03/2014, 19:20
Session 7 Risk and Change Management
... out production plant Principle of Project Principle of Project Principle of Project 10 Principle of Project 11 Principle of Project 12 Principle of Project 13 Principle of Project 14 Principle of ... of Project 15 Principle of Project 16 Principle of Project 17 Principle of Project 18 Principle of Project 19 Principle of Project 20 Principle of Project 21 Principle of Project 22 Principle of ... Project 27 Change Control Change Control System CM System CM Tool “Quality Software Project Management”, Futrell, Shafer, Shafer Principle of Project 28 Principle of Project 29 Principle of Project...
Ngày tải lên: 13/05/2014, 21:50
Designing a Change and Configuration Management Infrastructure
... contains a description of the compact disc contents and setup instructions in ASCII format (non–Microsoft Word document) 2410A_ms.doc This file is the Manual Classroom Setup Guide It contains the steps ... Word document (.doc) files that are included on the compact disc x Designing a Change and Configuration Management Infrastructure Document Conventions The following conventions are used in course ... Web page files Designing a Change and Configuration Management Infrastructure ix Student Materials Compact Disc Contents The Student Materials compact disc contains the following files and folders:...
Ngày tải lên: 16/10/2013, 12:15
Tài liệu Module 1: Introduction to Change and Configuration Management Design pptx
... must consider the deployment of CCM technologies as a project To maximize the project’s chances of success, you must understand the existing CCM process, follow a process to implement a CCM infrastructure, ... Introduction to Change and Configuration Management Topic Objective To introduce CCM, to describe its key elements, and to introduce the organizational structures required for CCM The Need for CCM ... location Note that the requirements of each customer are unique Defining the CCM Solution In this section, students assess the choice of available CCM technologies Students consider the respective...
Ngày tải lên: 10/12/2013, 15:15
Tài liệu Change Control and Policy and Workpace Management Chapter11 pptx
... account Go to the Action menu and select Properties On the property page, select the Account tab You will see that the Account Lock Out checkbox has been checked The OS did this in compliance ... the cubby of a jetliner Mobile users can either connect to the office from the road (such as a hotel or conference center) or from branch locations where they will be able to connect to the corporate ... access to the GPO according to the membership in the group There are two ways to apply the filter: Right-click on the root node of a Group Policy console, click Properties, and then select Security...
Ngày tải lên: 21/12/2013, 05:18
Prosci change management webinar Integrating change management and project management doc
... of changes: Current Transition Current Current Current – Project management: complexity and degree of technical change Future Transition Transition • are scaled to meet the specifics of the change: ... Resource allocation Schedule/tracking © Prosci Inc All rights reserved www.change-management.com Change management Project management Current Transition Future Change management The application ... used proficiently (People side) = SUCCESS Complementary disciplines with a common objective © Prosci Inc All rights reserved www.change-management.com Project management Project management Current...
Ngày tải lên: 16/03/2014, 01:20
Global electronics inc ABC implementation and the change management process
... Reproduced with permission of the copyright owner Further reproduction prohibited without permission Reproduced with permission of the copyright owner Further reproduction prohibited ... permission Reproduced with permission of the copyright owner Further reproduction prohibited without permission Reproduced with permission of the copyright owner Further reproduction prohibited ... permission Reproduced with permission of the copyright owner Further reproduction prohibited without permission Reproduced with permission of the copyright owner Further reproduction prohibited...
Ngày tải lên: 21/09/2015, 21:43
User and Security Management
... SQL Server c vai trò CSDL vai trò máy chủ Vai trò CSDL (Database roles) cho phép tất c p độ kh c độ truy c p CSDL kh c C c vai trò cho phép hạn chế cho phép người dùng th c thao t c kh c gọi vai ... hạn chế cho phép người dùng th c hiệnh thao t c kh c 6.4.1 C c vai trò CSDL C vai trò CSDL đ c biệt: vai trò Public Mọi người dùng định nghĩa CSDL thu c vai trò Public Nếu muốn người CSDL c ... liệu C c ràng bu c M c định Quy t c Chỉ số Khung nhìn 10 C c thủ tuc 11 Trigger Bảng 6.1: C c đối tượng CSDL Một người dùng tạo lập đối tượng CSDL gọi đối tượng sở hữu Người dùng c thể phải co quyền...
Ngày tải lên: 11/09/2012, 13:54
Wireless and Mobile Management
... receivers create additional problems (beyond multiple access): C A B A B Hidden terminal problem Ì B, A hear each other Ì B, C hear each other Ì A, C can not hear each other means A, C unaware of their ... frequency, but each user has own “chipping” sequence (i.e., code) to encode data encoded signal = (original data) X (chipping sequence) decoding: inner-product of encoded signal and chipping sequence ... unaware of their interference at B C C’s signal strength A’s signal strength space Signal fading: Ì B, A hear each other Ì B, C hear each other Ì A, C can not hear each other interferring at B 6:...
Ngày tải lên: 12/09/2012, 15:06
Báo cáo y học: "Oral Rehydration Therapy for Preoperative Fluid and Electrolyte Management"
... measured at the right axilla by an electronic thermometer (ET -C2 02P01, Termo Corporation, Tokyo, Japan) http://www.medsci.org Int J Med Sci 2011, With regard to the efficacy of ORT, the changes in ... agreed to receive the ORT Inclusion and exclusion criteria were the same as in the pilot study The patients, who did not agree to receive the ORT, received intravenous therapy instead The oral rehydration ... ORT, no changes were observed in the serum concentrations of potassium and chloride and the hematocrit value (Figure 2) In contrast, the serum concentration of sodium was decreased within the normal...
Ngày tải lên: 25/10/2012, 10:51
CCNA - P2 V3 - Router Startup and Configuration Management
... reserved ICND v2.0—2-5 ROM Functions • Contains microcode for basic functions © 2002, Cisco Systems, Inc All rights reserved ICND v2.0—2-6 Finding the Cisco IOS Software © 2002, Cisco Systems, Inc All ... configuration Load the configuration Run the configured Cisco IOS software © 2002, Cisco Systems, Inc All rights reserved ICND v2.0—2-4 Router Internal Components © 2002, Cisco Systems, Inc All rights ... • Describe the router boot sequence and explain how to verify that the router booted correctly • Identify the internal components of Cisco switches and routers © 2002, Cisco Systems, Inc All...
Ngày tải lên: 08/07/2013, 01:27
an entity-centric approach for privacy and identity management in cloud computing
... certificate of an RP, either because they not understand the importance of the approval decision or because they know that they must approve the certificate in order to get access to a particular ... approach Section concludes the paper C Identity Management in Cloud Computing In the traditional application-centric [5] IDM model, each application keeps trace of entities that uses it In cloud computing, ... is hijacked or the password is cracked the security of the entire system is compromised Metadata describes the active bundle and its privacy policies The metadata includes the following components...
Ngày tải lên: 31/07/2013, 09:43
Chapter 2 QUẢN TRỊ SẢN XUẤT VÀ TÁC NGHIỆP PRODUCTION AND OPERATION MANAGEMENT
... thư c đo đánh giá chất lượng dự báo sai so với giá trị th c tế Theo phương pháp liên tuc so sánh m c cầu dự báo so với m c cầu th c tế - Tín hiệu dự báo tính c ch lấy “Tổng sai số dự báo c ng ... the Forecast Error – RSFE) chia cho độ lệch tuyệt đối trung bình MAD TS = - Nếu TS >0 => C u th c tế lớn c u dự báo - = ∑ Nếu TS C u th c tế nhỏ c u dự báo - Một tín hiệu theo dõi tốt c ... kh c có kết dự báo kh c => C n kiểm định kết dự báo c ng c MAD sai số dự báo MSE => chọn hệ số α phù hợp -San mũ c điều chỉnh xu hướng (san mũ b c 2): kết hợp san mũ giản đơn c kết hợp điều chỉnh...
Ngày tải lên: 16/09/2013, 12:33
QUẢN TRỊ SẢN XUẤT VÀ TÁC NGHIỆP PRODUCTION AND OPERATION MANAGEMENT
... phẩm thiết kế c ch thích hợp c chi tiết lắp ráp c ch dễ dàng, nhanh chóng Thiết kế tin c y: Từng chi tiết c m c tin c y tập hợp lại ta c m c tin c y hệ thống muốn tăng m c độ tin c y hệ thống, ... vụ c giống cho khách hàng hay không M c độ giao dịch với khách hàng vi c phân phối dịch vụ C trường hợp m c độ giao dịch với khách hàng cao lĩnh v c thời trang thấp nhà hàng cung c p th c ... kế dịch vụ là: M c độ tiêu chuẩn hóa dịch vụ Tính chất sản phẩm phù hợp cho khách hàng cho nhóm khách hàng, dịch vụ c giống cho khách hàng hay không M c độ giao dịch với khách hàng vi c phân...
Ngày tải lên: 16/09/2013, 12:35
System Processes and Memory Management
... identify the process ID of the cat command $ ps -ef | grep cat From the current window, kill the cat command using the cat command’s process ID $ kill PID where PIDis the process ID of the cat command ... TTY TIME CMD Description The process identification number of the process The parent process identification number of the process The controlling terminal for the process The amount of CPU time ... issued in the terminal These commands are child processes of the terminal process The parent process receives and displays the output from the child process and then “kills” the process If a command...
Ngày tải lên: 02/10/2013, 09:20
Change time and change tense
... swimming The rescue started almost immediately Another driver told the police about the trouble The police called special rescue workers and a truck to pull the car out The driver of the truck, Paul ... about the object of each sentence Use who did Second student; Answer each question with a complete sentence The police called special rescue workers First student: Who did the police call? Second ... homework They explain the lessons to their students They correct their students' papers Students grade their teachers Teachers give grades at the beginning of the term Choice Questions Does the teacher...
Ngày tải lên: 16/10/2013, 08:15
Corporate Reputations, Branding and People Management 35
... way could they be regarded as novel, according to Norman and MacDonald, since they have been at the heart of the CSR agenda since the 1980s The more important criticism, however, lies in the ... It was also one of the first to appoint a director of CSR A key aspect of the Diageo’s approach to CC is that it is ‘owned’ by the main board and CEO A CC strategy and policy committee has been ... superior profits through charging more for their goods and services, such as the food market in which organic and ‘fair play’ producers are carving out a niche However, the case for CSR does not really...
Ngày tải lên: 18/10/2013, 00:15
Fiber Connectivity and Cable Management
... placement ordering guide in panel is factory installed OR Singlemode PCSC Duplex PCSC E PCST PCFC R PCSC-HP (zirconia sleeves) C Duplex PCSC-HP (zirconia sleeves) P PCST-HP (zirconia sleeves) PCFC-HP ... 05R for rack mount panels Duplex SC Ultra PCFC Ultra PCST Ultra PCSC PCFC 8° angled polish PCSC 8° angled polish E-2000 angled polish LX.5®1 LC1 PCSC 9° angled polish FC Hybrid (FC connector on ... traditional ADC splice deck SPLICE DECK BOTTOM SIDE SPLICE CHIP(S) (HEAT SHRINK SHOWN) Splice Deck with Splice Chip (Black) Splice Wheel with Splice Chip (Black) Ordering Information Description 3/06...
Ngày tải lên: 18/10/2013, 19:15
Grid Scheduling and Resource Management
... resource, usually leads to sub-optimal scheduling decisions 6.2.2.1 Direct communication In this scenario, each local scheduler can directly communicate with other schedulers for job dispatching ... shows the architecture of direct communication in the distributed scheduling paradigm If a job cannot be dispatched to its local resources, its scheduler will communicate with other remote schedulers ... then the daemon must authenticate the client for any communication that requires the WRITE access level If the daemon’s configuration contains SEC_DEFAULT_AUTHENTICATION = REQUIRED and does not contain...
Ngày tải lên: 19/10/2013, 03:20