Tài liệu tham khảo |
Loại |
Chi tiết |
17. Bubshait, A.A. & Al-Juwait, Y.A. (2002). Factors contributing to construction costs in Saudi Arabia, Cost Engineering, Vol. 44, Issue 5, pp 30 |
Sách, tạp chí |
Tiêu đề: |
Cost Engineering |
Tác giả: |
Bubshait, A.A. & Al-Juwait, Y.A |
Năm: |
2002 |
|
19. Ibrahim Mahamid, Amund Bruland 2011 2nd International Conference on Construction and Project Management IPEDR vol.15 (2011) © (2011) IACSIT Press, Singapore “Cost Overrun Causes in Road Construction Projects:„‟Consultants‟Perspective‟‟ |
Sách, tạp chí |
Tiêu đề: |
2011 2nd International Conference on Construction and Project Management IPEDR vol.15 (2011) © (2011) IACSIT Press, Singapore “ |
|
21. O. Koleola, and O. Henry. Factors Affecting the Accuracy of a Pre-Tender Cost Estimate in Nigeria. Journal of Cost Engineering. 2008, 50(9): 32–35 |
Sách, tạp chí |
Tiêu đề: |
Journal of Cost Engineering |
|
22. Okpala, Daniel C. & Aniekwu, Anny N. (1988), “Causes of High Costs of Construction In Nigeria”,Journal of Construction Engineering and Management, Vol. 114, No. 2, 233244 |
Sách, tạp chí |
Tiêu đề: |
Causes of High Costs of Construction In Nigeria”,"Journal of Construction Engineering and Management |
Tác giả: |
Okpala, Daniel C. & Aniekwu, Anny N |
Năm: |
1988 |
|
24. Elinwa, A. U. and Buba, S. A. (1993). “Construction cost factors in Nigeria.” Journal of Construction Engineering and Management. DOI: 10.1061/(ASCE)0733- 9364(1993)119:4(698)) |
Sách, tạp chí |
Tiêu đề: |
Construction cost factors in Nigeria |
Tác giả: |
Elinwa, A. U. and Buba, S. A |
Năm: |
1993 |
|
27. Nida Azhar et al., 2008, Cost overrun factors in construction industry of Pakistant, First International Conference on Construction In Developing Countries, August 4- 5, 2008, Karachi, Pakistan |
Sách, tạp chí |
Tiêu đề: |
Cost overrun factors in construction industry of Pakistant |
|
32. N uyễn T ị M n Tâm, C o T Hào Các nhân tố ảnh hưởng đến sự biến động chi phí của các dự án xây dựng. Tạp í p át tr ển KH&CN, tập 12, số 01-2009 |
Sách, tạp chí |
Tiêu đề: |
Các nhân tố ảnh hưởng đến sự biến động chi phí của các dự án xây dựng |
|
33. Long le-Hoai et al., 2008, Delay and Cost Overruns in Vietnam Large construction Projects: A Comparison with Other Selected Countries, KSCE Journal of Civil Engineering 12(6): p367-377 |
Sách, tạp chí |
Tiêu đề: |
Delay and Cost Overruns in Vietnam Large construction Projects: A Comparison with Other Selected Countries |
|
35. N uyễn Đìn T ọ & N uyễn T ị M Tr n 2009, Nghiên cứu khoa học trongquản trị kinh doanh, NXB Thống kê |
Sách, tạp chí |
Tiêu đề: |
Nghiên cứu khoa học trongquản trị kinh doanh |
Nhà XB: |
NXB Thống kê |
|
36. Hair & ctg (1998,111), Multivariate Data Analysis, Prentice-Hall International, Inc 37. Garson GD (2002), Guide to Writing Empiricel Pappers, Theses, and Dissertations,New York: Marcel Dekker |
Sách, tạp chí |
Tiêu đề: |
Multivariate Data Analysis |
Tác giả: |
Hair & ctg (1998,111), Multivariate Data Analysis, Prentice-Hall International, Inc 37. Garson GD |
Năm: |
2002 |
|
15. Yogini K. Patil, Pankaj P. Bhangale Investigation of Factors Influencing Cost Overrun in High-Rise Building Constructions (2016) |
Khác |
|
16. Kaming, P.F., Olomolaiye, P.O., Holt, G.D., & Harris, F.C. (1997).Factors influencing construction time and cost overruns on high-rise projects in Indonesia.Construction Management and Economics, 15, 83-94 |
Khác |
|
18. Ruth Apolot, Henry Alinaitwe, Dan Tindiwensi Journal of Construction in Developing Countries, 18(2), 33–47, 2013 |
Khác |
|
20. I. Mahamid, and A. Bruland. Analysis of cost diverge in road construction projects. Proceedings of the 2010 Annual Conference of the Canadian Society for Civil Engineering, Winnipeg, Manitoba, Canada, June 9-12, 2010 |
Khác |
|
23. Z. Al-Khaldi. Factors Affecting the Accuracy of Construction Costs Estimating in Saudi Arabia. Master thesis, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia, 1990 |
Khác |
|
26. Olawale, Y.A. 2010. Cost and Time Control Practice of Construction Projects in the UK:The Pursuit of effective management control. University of the West of England |
Khác |
|
28. Frimpong, Y. (2000) Project management in developing countries: causes of delay and cost overruns in construction of groundwater projects. Unpublished Masters Research Project, University of Technology, Sydney, Australia |
Khác |
|
29. Lưu Trườn Văn, N uyễn Lê Kế N ệp, và N uyễn Hoà N ĩ , Phân tích chi phí bị vượt trong các dự án cao ốc và chung cư cao tầng |
Khác |
|
30. Trần Hoàn Tuấn (2014) Các nhân tố ảnh hưởng đến chi phí và thời gian hoàn thành dự án trong giai đoạn thi công trường hợp nghiên cứu trên địa bàn thành phố Cần Thơ. Tập chí Khoa học Trường đại học Cần Thơ- Phân D: Khoa hoc Chính trị, Kinh tế và Pháp luật: 30 (2014): 26-33 |
Khác |
|
31. Vũ Qu n Lãm 2015, Các yếu tố gây chậm tiến độ và vƣợt dự toán các dự án đâu tƣ công tại Việt Nam. Hôi nhập và phát triển số 23(33), tháng 07-08/2015 |
Khác |
|