Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống
1
/ 176 trang
Thông tin tài liệu
BITEXCO FINANCIAL TOWER MAR 2009 Table of Contents Project Information Site Logistics Construction Program/Reports Construction Equipments Method for Construction MEP System Safety Plan Section Project Information 1.1 Project Description 1.1.1 Location 1.1.2 Perspective View 1.1.3 Site Layout 1.1.4 General 1.1.5 Description of Structural System 1.2 Employer’s Requirements 1.2.1 Scope of Works 1.3 Overall Project Organization