Biện pháp thi công sàn nâng nhà ga và depot

24 29 0
Biện pháp thi công sàn nâng nhà ga và depot

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

Thông tin tài liệu

HCMC METRO LINE 1 ‐ CP2 BIỆN PHÁP THI CÔNG LẮP ĐẶT SÀN NÂNG ‐ NHÀ GA VÀ DEPOT Doc No.: HCMC0000-000-MST-00058 08th Nov 2018 Rev.: C Page: Page of 12 Ho Chi Minh City Urban Railway Construction Project DỰ ÁN Ben Thanh - Suoi Tien Section (Line 1) Construction Package 2: Civil (Elevated and Depot) BIỆN PHÁP THI CÔNG SÀN NÂNG NHÀ GA VÀ DEPOT DOCUMENT STATUS Phiên Ngày Miêu tả A 07/06/2018 Đệ trình lần thứ B 21/09/2018 Đệ trình lần thứ hai B 08/11/2018 Đệ trình lần thứ ba PREPARED BY CHECKED BY APPROVED BY TRAN QUANG THANG IM JI HOON YOON YOUNG DOO NAME Ghi SIGNATURE DATE / 12/ 2018 / 12/ 2018 / 12/ 2018 HCMC METRO LINE 1 ‐ CP2 BIỆN PHÁP THI CÔNG LẮP ĐẶT SÀN NÂNG ‐ NHÀ GA VÀ DEPOT CONTENTS: GIỚI THIỆU SƠ ĐỒ TỔ CHỨC PHÂN CÔNG TRÁCH NHIỆM THIẾT BỊ & CƠNG CỤ DỤNG CỤ QUY TRÌNH THI CƠNG LẮP ĐẶT KIỂM TRA CHẤT LƯỢNG SỨC KHOẺ, AN TỒN & MƠI TRƯỜNG PHỤ LỤC Doc No.: HCMC0000-000-MST-00058 08th Nov 2018 Rev.: C Page: Page of 12 HCMC METRO LINE 1 ‐ CP2 BIỆN PHÁP THI CÔNG LẮP ĐẶT SÀN NÂNG ‐ NHÀ GA VÀ DEPOT Doc No.: HCMC0000-000-MST-00058 08th Nov 2018 Rev.: C Page: Page of 12 GIỚI THIỆU 1.1 Tổng quan Dự án Tên Dự án: Xây dựng đường sắt nội đô Tp.HCM, Tuyến (Bến Thành-Suối Tiên), Gói 2: Cơng tác Xây dựng (Tuyến cao & Depot) Gói gồm 17.24 km đường tàu chạy cao, từ Km2+360 đến Km19+591.37; có 05 cầu đặc biệt, 11 nhà ga, 04 trạm điện & khu Depot Vị trí: Bắt đầu từ quận kết thúc phường Long Bình, quận 9, thành phố Hồ Chí Minh 1.2 Mục tiêu Biện pháp Mục tiêu tài liệu để mô tả biện pháp thi công chi tiết cho công tác thi công sàn nâng (gồm quy trình thực hiện, kiểm sốt chất lượng, an tồn & vệ sinh môi trường) khu vực Nhà ga, Depot & Trạm điện tuyến Metro Line – Tp.HCM 1.3 Phạm vi công việc Lắp dặt sàn nâng Nhà ga Depot 1.4 Tài liệu tham khảo Tiêu chuẩn kỹ thuật phần kiến trúc (Nhà ga, Depot, Trạm điện), Ref No/Tham chiếu số UMRTL1CP2-STGN-CSA-SPE-00003-E, Approval dated 12th Dec 2017-ngày phê duyệt 12/12/2017 TCVN 9377: 2012 Công tác hồn thiện – Tiêu chuẩn thi cơng, kiểm tra nghiệm thu SƠ ĐỒ TỔ CHỨC CÔNG TRƯỜNG Sơ đồ tổ chức cơng trường sau: HCMC METRO LINE 1 ‐ CP2 BIỆN PHÁP THI CƠNG LẮP ĐẶT SÀN NÂNG ‐ NHÀ GA VÀ DEPOT Doc No.: HCMC0000-000-MST-00058 08th Nov 2018 Rev.: C Page: Page of 12 Project Manager Mr.Sheki IHARA Safety Manager Mr Koo Jeong Hoi Quality Manager Mr Lam Thanh Tu Architecture Manager Mr Yoon Young Doo Environment Manager Ms Nguyen Thi Hien Manager Mr Park Weon Kee Surveyor Mr Nguyen Duy Quang Mr Nguyen Tan Quoc Deputy Site Manager Mr Nguyen Phu Truong Sub-contractor Project Manager Quality Controller Sub-contractor Site Manager Surveyor Team Team Leader Engineers Operators Safety & Environment Workers PHÂN CÔNG TRÁCH NHIỆM 3.1 Giám đốc Dự án Quản lý điều hành tồn cơng tác thiết kế, thi công & công việc liên quan Gói thầu số 2, Xây dựng đường sắt nội Tp.HCM, Tuyến (Bến Thành-Suối Tiên), Gói 2: Cơng tác Xây dựng (Tuyến cao & Depot) 3.2 Phó Giám đốc Dự án Hỗ trợ Giám Đốc Dự án (GĐDA) việc lập kế hoạch & quản lý Dự án Thay GĐDA điều hành quản lý tồn cơng việc trường hợp GĐDA vắng mặt 3.3 Quản lý sức khoẻ, an tồn, mơi trường Thiết lập & thực cách có hiệu chương trình, kế hoạch Sức khoẻ, An tồn & HCMC METRO LINE 1 ‐ CP2 BIỆN PHÁP THI CƠNG LẮP ĐẶT SÀN NÂNG ‐ NHÀ GA VÀ DEPOT Doc No.: HCMC0000-000-MST-00058 08th Nov 2018 Rev.: C Page: Page of 12 Môi trường công trường 3.4 Quản lý chất lượng Quản lý tồn cơng tác đảm bảo chất lượng & quản lý chất lượng, chịu trách nhiệm tổ chức thực Hệ thống quản lý chất lượng, thiết lập kế hoạch/quy trình đảm bảo & quản lý chất lượng vấn đề liên quan đến chất lượng khác 3.5 Kiểm xoát Thiết lập & kiểm tra toàn hệ thống mốc, cao độ, điểm, đường tham chiếu & triển khai cho cấu kiện thi công dựa kế hoạch phê duyệt 3.6 Quản lý cơng trường Quản lý tồn cơng tác thi công công trường thực Nhà thầu hay Nhà Thầu phụ, đảm bảo việc thi công thực vẽ thi công, điều kiện kỹ thuật & kế hoạch chất lượng phê duyệt 3.7 Kỹ sư công trường Hỗ trợ quản lý công trường việc tổ chức thực công trường, theo dõi, ghi nhận lại tồn hoạt động thi cơng DANH SÁCH THIẾT BỊ & CÔNG CỤ No Description 01 Máy định vị LASER 02 Máy cắt HCMC METRO LINE 1 ‐ CP2 BIỆN PHÁP THI CÔNG LẮP ĐẶT SÀN NÂNG ‐ NHÀ GA VÀ DEPOT No Description 03 Máy hút bụi 04 Máy bắt vít/khoan 05 Xe rùa để vận chuyển ngang 06 Vận thăng hàng để vận chuyển đứng 07 Dụng cụ nhấc sàn nâng Doc No.: HCMC0000-000-MST-00058 08th Nov 2018 Rev.: C Page: Page of 12 HCMC METRO LINE 1 ‐ CP2 BIỆN PHÁP THI CÔNG LẮP ĐẶT SÀN NÂNG ‐ NHÀ GA VÀ DEPOT Doc No.: HCMC0000-000-MST-00058 08th Nov 2018 Rev.: C Page: Page of 12 QUY TRÌNH THI CƠNG LẮP ĐẶT BƯỚC Bước 1: Chuan bị bề mặt Bước 2: Định vị Bước 3: Lắp đặt 5.1 MÔ TẢ CÔNG VIỆC Bề mặt nên (sàn Epoxy) hồn thiện vệ sinh Cơng tác cần bàn giao trước lắp sàn nâng (nếu có): *Giá đỡ tủ điện, máng cáp & giá đỡ máng cáp *Hệ thống MEP Định vị điểm khởi đầu thể vẽ Bật mực cao độ Lắp đặt Lắp đặt trụ đỡ sàn nâng (bằng keo dán chuyên dụ ng Không cho phép lại keo đơng cứng hồn tồn khoảng 48h) Bắn vít lắp đặt giằng Lắp đặt sàn Lắp đặt tấm: *Tiến hành lắp đặt sàn nâng bốn hướng xung quanh tiếp giáp với tường *Cân chỉnh cao độ & độ phẳng bề mặt sàn trình lắp đặt & hoàn thành toàn *Lắp đặt đứng, cố định vít xuống sàn & cách lắp nẹp viền V inox vào sàn nằm ngang * Lắp đặt chân tường Vinyl để che khe hở tường & sàn nâng QUẢN LÝ CHẤT LƯỢNG Danh sách kiểm tra A-04 Danh sách kiểm tra A-05 Danh sách kiểm tra: A-06 Kiểm tra hoàn thiện: A-07 *Thường xuyên dọn dẹp vệ sinh & cuối làm việc * lớp bả o vệ be mặ t sàn (chang hạ n tam Polypropylene) sẽ được lap đặ t Giao nhận lưu trữ vật tư Vật tư phải lưu giữ khu vực có bào vệ thơng thống 5.2 Chuẩn bị mặt thi cơng Bề mặt sàn nâng kỹ thuật phải hoàn thiện (sơn chống bụi định vẽ phê duyệt) ; Bề mặt dọn dẹp sẽ, khơng cịn bụi bẩn trước thi cơng sàn nâng Các hạng mục công việc giao thoa khác (nếu có) phải bàn giao trước tiến hành thi cơng sàn nâng http://sso.gsenc.com/sso/std/ssoLogin_cert.jsp HCMC METRO LINE 1 ‐ CP2 BIỆN PHÁP THI CƠNG LẮP ĐẶT SÀN NÂNG ‐ NHÀ GA VÀ DEPOT 5.3 Doc No.: HCMC0000-000-MST-00058 08th Nov 2018 Rev.: C Page: Page of 12 Định vị Định vị điểm khởi đầu lắp đặt thể vẽ , lưới vị trí chân đỡ sàn nâng theo 02 phương Định vị cao độ hoàn thiện sàn (FFH) máy định vị cao độ laser từ mốc cao độ chuẩn 5.4 Lắp đặt Cố định chân đỡ sàn keo dán chuyên dụng Bắn vít lắp đặt giằng Bắt đầu từ điểm khởi đầu, tiến hành lắp đặt sàn nâng bốn hướng xung quanh tiếp giáp với tường (dùng cắt vị trí tiếp giáp với tường); Khe hở tối đa 5mm sàn nâng với tường, cột ; cân chỉnh cao độ & độ phẳng bề mặt sàn trình lắp đặt & hoàn thành toàn Lắp đặt đứng, cố định vít xuống sàn & cách lắp nẹp viền V inox vào sàn nằm ngang Lắp đặt chân tường Vinyl để che khe hở tường & sàn nâng HCMC METRO LINE 1 ‐ CP2 BIỆN PHÁP THI CÔNG LẮP ĐẶT SÀN NÂNG ‐ NHÀ GA VÀ DEPOT 5.5 Doc No.: HCMC0000-000-MST-00058 08th Nov 2018 Rev.: C Page: Page of 12 vệ sinh Trong & cuối làm việc, thường xuyên dọn dẹp vật tư dư thừa, rác thải khỏi vị trí làm việc để tránh làm hư hỏng/ trầy xước bề mặt sàn nâng Lau chùi hàng ngày giẻ lau vắt khơ Nếu có vết bẩn bám sử dụng hố chất trung tính xử lý vị trí bị bám bẩn Khơng sử dụng hố chất vệ sinh có độ axít kiềm cao chảy qua kẽ roang sàn làm hư hại giằng bên KIỂM SOÁT CHẤT LƯỢNG Tất công tác chuẩn bị, lắp đặt & nghiệm thu phải tuân thủ yêu cầu Tiêu chuẩn kỹ thuật & Kế hoạch kiểm tra thử nghiệm phê duyệt cho công tác sàn nâng Kiểm tra đồng ý: (1) Khi sàn: Không có tiếng ồn, khơng dịch chuyển, độ ổn định cao (2) Thẳng góc cạnh, cao động phẳng (3) Kích thước với vẽ phê duyệt Bảo vệ sàn nâng: o Trong trình lắp đặt sàn nâng, khu vực lắp đặt cô lập, việc lưu thơng vào bên HCMC METRO LINE 1 ‐ CP2 BIỆN PHÁP THI CƠNG LẮP ĐẶT SÀN NÂNG ‐ NHÀ GA VÀ DEPOT Doc No.: HCMC0000-000-MST-00058 08th Nov 2018 Rev.: C Page: Page 10 of 12 phục vụ cho việc trực tiếp lắp đặt sàn nâng, không cho phép hoạt động khác diễn Các việc thi công khác không phép vào khu vực thi công sàn nâng bàn giao o Khu vực sau thi công xong sàn nâng khơng để người lại ngày để keo dán chân đỡ khô cố định vị trí Khu vực thi cơng sàn nâng khố lại để phịng ngừa hư hỏng nghiệm thu o hồn thành cơng việc Sau hoàn thành lắp đặt sàn nâng, lớp bảo vệ bề mặt sàn (tấm Polypropylene) lắp đặt để o tránh hư hại hoạt động sau SỨC KHOẺ, AN TỒN & MƠI TRƯỜNG (HSE) Nói chung, u cầu sức khoẻ, an tồn & môi trường thực thi theo kế hoạch phê duyệt Trong lưu ý yêu cầu 8.1 - Kế hoạch huấn luyện liên quan đến u cầu sức khoẻ, an tồn & mơi trường Các biện pháp an toàn huấn luyện, truyền đạt, thị đến tồn cơng nhân Cần đảm bảo tất cơng nhân huấn luyện an tồn, huấn luyện giảm thiểu nguy tai nạn kỹ sư trường, cán an toàn trước bắt đầu công việc - Tất công nhân phải ký vào biên huấn luyện để đảm bảo họ hoàn toàn hiểu hết nội dung huấn luyện - Họp khởi động công việc phải tổ chức trước bắt đầu công việc - Hơn nữa, chuyên đề chuyên biệt việc giảm thiểu nguy tai nạn phải tổ chức đầu buổi họp khởi động công việc - Tất công nhân phải dẫn dắt & hướng dẫn nhân Nhà Thầu có đủ hiểu biết cơng tác/u cầu an tồn sơ cấp cứu, an toàn sử dụng cẩu, thiết bị nâng, phản ứng tình khẩn cấp, … 8.2 Trang thiết bị an tồn cho người lao động Tất cơng nhân phải trang bị trang bị bảo hộ lao động (PPE) vào công trường giày, nón, … Ngồi ra, cơng việc cần thiết, trang bị bảo hộ lao động theo cơng việc (kính, găng tay, bịt tai , ) phải trang bị thêm 8.3 - Họp bắt đầu công việc hàng ngày Vào buổi sáng, tất nhân Nhà thầu & Thầu phụ phải tập hợp họp lại nhóm phù hợp để thảo luận an tồn trước bắt đầu cơng việc TBM buổi họp ngắn gọn & xem phương pháp hiệu để giảm thiểu kiểm soát nguy an toàn nâng cao ý thức an toàn người lao động theo phạm vi cơng việc 10 HCMC METRO LINE 1 ‐ CP2 BIỆN PHÁP THI CƠNG LẮP ĐẶT SÀN NÂNG ‐ NHÀ GA VÀ DEPOT - Doc No.: HCMC0000-000-MST-00058 08th Nov 2018 Rev.: C Page: Page 11 of 12 TBM bao gồm vài đầu mục an toàn điện giật thường xuyên & bất thường, làm việc cao, an toàn nâng hạ, làm việc điều kiện thời tiết bất lợi (mưa, gió),… 8.4 - Giám sát liên quan đến yêu cầu sức khỏe, an tồn & mơi trường Kỹ sư trường/Giám sát/Tổ trường phụ trách khu vực tiến hành kiểm tra hàng ngày yêu cầu an toàn để phát yếu tố an tồn; có, yếu tố an toàn phải khắc phục - Nhóm HSE Nhà Thầu kiểm tra hàng ngày để đảm bảo công tác kiểm sốt HSE trì người phân công 8.5 Đánh giá No Step- Bước STT A – Chuẩn bị Hazards/RisksNguy Action Taken- Hành động tiến hành Action by- Hành động Người vào chưa quen với công trường & quy định làm việc Huấn luyện & dẫn nhập HSE thường Cán AT/Giám xuyên, cách Tổ chức TBM sát/Công nhân Trang thiết bị an Trang bị an toàn cá nhân (áo phản Cán AT/ Tổ tồn cá nhân quang, giày, nón BHLĐ) bắt buộc; Trang bị trưởng/Công nhân không phù hợp an tồn theo cơng việc (mặt nạ, kính, dây AT, ) cần thiết - Công cụ dụng cụ Thường xun kiểm tra, thay có hư Tổ trưởng/Cơng bị hư hỏng hỏng nhân Nguy rò rỉ điện Nối đất cho thiết bị Định kỳ kiểm tra & sửa chữa hư hỏng, bảo dưỡng định kỳ Chiếu sáng - Chiếu sáng phù hợp thiếu ánh sang Đường di chuyển/ Duy trì đường di chuyển phù hợp không gian làm việc Lưu trữ vật tư Thợ điện/ Tổ trưởng/ KS giám sát Thợ điện/ Tổ trưởng/ KS giám sát Thợ điện/ Tổ trưởng/ Giám sát Lưu trữ cách, tránh sụp đổ, gây Tổ trưởng/ Giám nguy làm bị thương người lao động sát 11 HCMC METRO LINE 1 ‐ CP2 BIỆN PHÁP THI CÔNG LẮP ĐẶT SÀN NÂNG ‐ NHÀ GA VÀ DEPOT No Step- Bước STT Hazards/RisksNguy Action Taken- Hành động tiến hành Doc No.: HCMC0000-000-MST-00058 08th Nov 2018 Rev.: C Page: Page 12 of 12 Action by- Hành động B Vận chuyển Bị thương vận Thao tác (giữ thẳng lưng nâng vật Tổ trưởng/ Giám vật liệu chuyển/ nâng hạ tư, mang vác trọng lượng vừa sức người, sử sát/ Công nhân không cách dụng công cụ dụng cụ phù hợp), giữ lối gọn gàng/sạch C up/ Vệ sinh Nguy điện Sử dụng trang vệ sinh; Thợ điện/CN/Tổ cuối ngày giật & bụi trưởng cuộn cáp điện & ổ cắm cẩn thận ; lưu trữ làm việc gọn ĐÍNH KÈM: Vật liệu kết dình – Builders bond 12 Doc No.: HCMC-0000000-MST- 00058 Date: 08th Nov 2018 Rev.: C Page: Page of 12 HCMC METRO LINE 1 - CP2 METHOD STATEMENT FOR RAISED FLOOR WORK - STATION AND SUBSTATION Ho Chi Minh City Urban Railway Construction Project PROJECT TITLE Ben Thanh - Suoi Tien Section (Line 1) Construction Package 2: Civil (Elevated and Depot) METHOD STATEMENT FOR RAISED FLOOR WORKS STATION AND DEPOT DOCUMENT STATUS REV No DATE DESCRIPTION A 07/06/2018 First Submission B 21/09/2018 Second Submission C 08/11/2018 Third Submission PREPARED BY CHECKED BY APPROVED BY TRAN QUANG THANG IM JI HOON YOON YOUNG DOO NAME REMARKS SIGNATURE DATE Dec 2018 Dec 2018 Dec 2018 HCMC METRO LINE 1 - CP2 METHOD STATEMENT FOR RAISED FLOOR WORK - STATION AND SUBSTATION CONTENTS: INTRODUCTION SITE ORGANIZATION RESPONSIBILITIES EQUIPMENT & TOOLS INSTALLATION PROCEDURE QUALITY CONTROL HEALTH, SAFETY AND ENVIRONMENT (HSE APPENDIX Doc No.: HCMC-0000000-MST- 00058 Date: 08th Nov 2018 Rev.: C Page: Page of 12 HCMC METRO LINE 1 - CP2 METHOD STATEMENT FOR RAISED FLOOR WORK - STATION AND SUBSTATION Doc No.: HCMC-0000000-MST- 00058 Date: 08th Nov 2018 Rev.: C Page: Page of 12 INTRODUCTION 1.1 Overall of Project Project name: Ho Chi Minh City Urban Railway Construction Project, Ben Thanh - Suoi Tien Section (Line 1), Contract package-2: Civil (Elevated and Depot) Package shall include 17.24km of Elevated Railway, from Km2+360 to Km19+591.37; include 05 special bridges, 11 stations, substations and Depot area Location: Starting at District and ending at Long Binh Ward, District 9, Ho Chi Minh City 1.2 Purpose The purpose of this document is to describe the detailed construction method (including procedure, quality control, environment & safety management) for Raised Floor Work at Stations, Substations & Depot of Metro line project at Ho Chi Minh City 1.3 Scope of work Installation raise access floor at Stations and Depot 1.4 References Architectural Specification (Station, Depot & Substation) Ref No UMRTL1-CP2-STGN-CSASPE-00003-E, Approval dated 12th Dec 2017 TCVN 9377: 2012 Finishing work – Specification for Construction, check and acceptance SITE ORGANIZATION Site Organization Chart for these works is described as follows HCMC METRO LINE 1 - CP2 METHOD STATEMENT FOR RAISED FLOOR WORK - STATION AND SUBSTATION Doc No.: HCMC-0000000-MST- 00058 Date: 08th Nov 2018 Rev.: C Page: Page of 12 Project Manager Mr.Sheki IHARA Safety Manager Mr Koo Jeong Hoi Quality Manager Mr Lam Thanh Tu Architecture Manager Mr Yoon Young Doo Environment Manager Ms Nguyen Thi Hien Manager Mr Park Weon Kee Surveyor Mr Nguyen Duy Quang Mr Nguyen Tan Quoc Deputy Site Manager Mr Nguyen Phu Truong Sub-contractor Project Manager Quality Controller Sub-contractor Site Manager Surveyor Team Team Leader Engineers Operators Safety & Environment Workers RESPONSIBILITIES 3.1 Project Manager Managing for all Design, Construction and other works of Ho Chi Minh City Urban Railway Construction Project under the Contract Package-2, Ben Thanh – Suoi Tien section (Line 1) 3.2 Deputy Project Manager Support the Project Manager in planning and managing the Project In the absence of Project Manager, he will be a Project Manager’s representative to control and manage all works of the project 3.3 HSE Manager Establishing, implementing HSE programs/plans effectively at site HCMC METRO LINE 1 - CP2 METHOD STATEMENT FOR RAISED FLOOR WORK - STATION AND SUBSTATION 3.4 Doc No.: HCMC-0000000-MST- 00058 Date: 08th Nov 2018 Rev.: C Page: Page of 12 Quality Manager Managing overall works for Quality Assurance and Quality Control He is also responsible for ensuring the implementation of Quality Management Systems, establishing QA/QC Plans, Procedures and other related quality matters 3.5 Surveyor Setting out all survey markings, points and parameters for the locations and elevations of each structure based on the approved plans 3.6 Site Manager Managing for all construction activities executed by the Contractor or Subcontractor to ensure that they are constructed in accordance with the approved construction drawings, works specifications, and Project Quality Plan 3.7 Site Engineer Assisting Construction Manager in organizing controlling, monitoring and recording all activities EQUIPMENT LIST AND TOOLS No Description 01 MULTILINE LASER LEVEL 02 Cutter 03 Vacuum cleaner HCMC METRO LINE 1 - CP2 METHOD STATEMENT FOR RAISED FLOOR WORK - STATION AND SUBSTATION No Description 04 Screwing/Drilling machine 05 Horizontal Movement: Wheelbarrow 06 Vertical Movement: Material Hoist; 07 Tile/Panel Puller Doc No.: HCMC-0000000-MST- 00058 Date: 08th Nov 2018 Rev.: C Page: Page of 12 HCMC METRO LINE 1 - CP2 METHOD STATEMENT FOR RAISED FLOOR WORK - STATION AND SUBSTATION Doc No.: HCMC-0000000-MST- 00058 Date: 08th Nov 2018 Rev.: C Page: Page of 12 INSTALLATION PROCEDURE WORK SEQUENCE STEP1: Surface preparation STEP 2: Setting out STEP 3: Installation pedestal, stringer, panel and skirting 5.1 QUALITY MANAGEMENT WORK DESCRIPTION The surface (epoxy floor) was done and clean Work to be Completed before RFL Work (if any): *Base of Electrical Panel, Support of Cable Tray * MEP fixtures Check list A-04 The starting point as shown in drawings Reference Level Point setting Installation of the pedestal (with the application of adhesive) No traffic is allowed until adhesive is completed set & dry (appx 48h) Installation of stringer by screws Check list A-05 Installation of Panel: *Panels to be laid in four sides to the perimeter of the wall *Level calibration & adjustment is required during the installation process and upon completion * Installation of vertical panels, fix it by screwing to the substrate and by the installation of stainless steel angle to horizontal panels * Installation of Vinyl Skirting to cover the gap between raised floor & perimeter wall Check list A-06 Final inspection (acceptance): check list A-07 *Keep regular Cleaning, during working hour & at the end of each work day * Protect the work until final acceptance of the completed work Keep rooms lockable Delivery, storage & handling Materials will be stored in a secured and well-ventilated area 5.2 Substrate & Space Preparation The substrate under Raised floor must be done (floor anti-dust painting to be applied as mentioned on approved working drawing) The substrate to be clean from debris and sand Other interface works (if any) should be released before access floor installation HCMC METRO LINE 1 - CP2 METHOD STATEMENT FOR RAISED FLOOR WORK - STATION AND SUBSTATION 5.3 Doc No.: HCMC-0000000-MST- 00058 Date: 08th Nov 2018 Rev.: C Page: Page of 12 Setting out Setting out the starting point as shown in design drawing, and grid line of raised floor’s pedestals in two directions; Determining & setting of the finish floor height (FFH) with the use of laser equipment from approved datum level 5.4 Installation Installation of adjustable pedestal shall start with the application of adhesive to the base of pedestal onto floor slab Installation of stringer by screws From the starting point, panels to be laid on the head of the pedestal and shall proceed in four sides to the perimeter of the wall (where cut panels are required) A maximum gap of mm is allowable at perimeter walls, columns; Level calibration & adjustment is required during the installation process and upon completion Installation of vertical panels, fix it by screwing to the substrate and by the installation of stainless steel angle to horizontal panels Installation of Vinyl Skirting to cover the gap between raised floor & perimeter wall HCMC METRO LINE 1 - CP2 METHOD STATEMENT FOR RAISED FLOOR WORK - STATION AND SUBSTATION 5.5 Doc No.: HCMC-0000000-MST- 00058 Date: 08th Nov 2018 Rev.: C Page: Page of 12 Cleaning During working hour & at the end of each workday, remove unused materials, debris out of from the raised floor area, avoiding damage & scratches to surfaces of raised floor Daily cleaning by using of damp mops If any stubborn soils/stains, use neutral detergent or neutral chemical to strip off No strong cleaning chemical (acid/alkaline) is allowed since it will leak to the joint between panels then damage the stringer QUALITY CONTROL All preparation, installation & inspection must comply with the requirements in Construction specification and other requirements in approved Inspection and Testing Plan for Raised Floor Work Check & acceptance: (1) When walking on the floor: no noise, no movement & good stability (2) Straight edge, level & flat: Within 3mm gap per Rule 3m and Difference level of edge between panel beside each other less than 0.5 mm (3) Dimension follow approved design drawing Protection of Raised Floor: HCMC METRO LINE 1 - CP2 METHOD STATEMENT FOR RAISED FLOOR WORK - STATION AND SUBSTATION Doc No.: HCMC-0000000-MST- 00058 Date: 08th Nov 2018 Rev.: C Page: Page 10 of 12 No other works are allowed in the work area until handover All installed area is not allowed to be o open for access for a minimum of days to facilitate curing of adhesive Protect the work so it will not be damaged until final acceptance of the completed work Keep rooms o lockable After the completion of the installation of raised floor, a protective layer (for instance Polypropylene o sheet) will be installed, for the protection of raised floor from damages by subsequent activities HEALTH, SAFETY AND ENVIRONMENT (HSE) Fundamentally, health, safety and environment control will be implemented in compliance with the onsite safety plan and environmental safety plans which have been approved However, one of the following activities will basically be implemented 8.1 - Training plan related to health, safety and environment control Measures for construction will be distributed and instructed to all workers It is necessary to ensure that all workers shall be trained and disseminated with working experiences by site engineer, safety staff before conducting their work - All workers must sign the minutes of training to ensure that they have clearly understood the contents of the training - The meeting of the execution plan will be held before conducting - Moreover, specific seminars as mentioned above will be held at the beginning of meeting with the content on safety dissemination - All workers will be fostered and guided by a Contractor’s staff who is fully capable of understanding safety work such as first aid training, safety measures when using cranes, lifting techniques, emergency procedures etc… 8.2 Labor protection and safety equipment All workers should wear basic personal protective equipment (PPE) during construction such as protective boots, helmets, etc Furthermore, when required, work specific PPE (glass, gloves, earplug,…) should be equipped accordingly 8.3 - Tool Box Meeting (TBM) On each morning, all staffs of main contractor and subcontractor shall hold a meeting to discuss the safety in proper groups at the site before starting work TBM is a brief meeting and considered as one of the most effective ways to eliminate or control accidents/incidents and raise the awareness of labor safety according to the scope of work 10 HCMC METRO LINE 1 - CP2 METHOD STATEMENT FOR RAISED FLOOR WORK - STATION AND SUBSTATION - Doc No.: HCMC-0000000-MST- 00058 Date: 08th Nov 2018 Rev.: C Page: Page 11 of 12 TBM includes several separated topics such as: Electric shock at emergency and regular, working at a high position, electrical safety, lifting safety, procedures to perform work during bad weathers (rainy, windy) etc 8.4 - Supervision related to health, safety and environment control (HSE Engineers/Supervisors/Foremen in charge of each specific area at the site will conduct the daily safety work in order to detect any actions/lack of safety conditions arising, and if any, subcontractors/employees involved will be required to fix immediately - The contractor's HSE group will check the daily activities of safety control to ensure that such activities are performed by the right person being appointed 8.5 Risk Assessment No Step STT A Preparation Hazards/Risks- Action Taken- Action by New personnel Proper HSE induction & training, regular Safety Officer/ unfamiliar to the TBM to be organized Supervisor/ Worker site and work rules Improper PPE Basic PPE (Reflective jacket, safety boot, Safety Officer/ helmet) is compulsory, Work Specific PPE Forman/ Worker(mask, glass, harness, …) when required/ Defective Tool Regular inspection, replace the defective Forman/ Worker (Trowel, Shovels, tool if any Wheel Barrow, ) Electrical Hazards Grounding for equipment Regular checking and fix the broken, if any Maintenance as requirement Lighting Access/ Space Storage Material Good lighting during time of darkness/ Working Maintain proper Access Electrician/ Forman/ Supervisor Electrician/ Forman/ Supervisor Electrician/ Forman/ Supervisor of Proper storage avoid collapse, injures Forman/ Supervisor hazard to people 11 HCMC METRO LINE 1 - CP2 METHOD STATEMENT FOR RAISED FLOOR WORK - STATION AND SUBSTATION No Step STT Hazards/Risks- Action Taken- Doc No.: HCMC-0000000-MST- 00058 Date: 08th Nov 2018 Rev.: C Page: Page 12 of 12 Action by B Movement of material Injury due to Proper practice (keep back straight when Forman/ manual handling lifting of material, adequate carrying Supervisor/ weight, proper tools/means of carrying), Workers clear access all times C End-day Site Cleaning-up Dust and electrical Use a face mask when cleaning Electrician/ trip hazards Worker/FormanRoll back & store tidy power cable & socket 12 ... vít xuống sàn & cách lắp nẹp viền V inox vào sàn nằm ngang Lắp đặt chân tường Vinyl để che khe hở tường & sàn nâng HCMC METRO LINE 1 ‐ CP2 BIỆN PHÁP THI CÔNG LẮP ĐẶT SÀN NÂNG ‐ NHÀ GA VÀ DEPOT 5.5... tiêu Biện pháp Mục tiêu tài liệu để mô tả biện pháp thi công chi tiết cho công tác thi công sàn nâng (gồm quy trình thực hiện, kiểm sốt chất lượng, an tồn & vệ sinh mơi trường) khu vực Nhà ga, Depot. .. 2012 Công tác hồn thi? ??n – Tiêu chuẩn thi cơng, kiểm tra nghiệm thu SƠ ĐỒ TỔ CHỨC CÔNG TRƯỜNG Sơ đồ tổ chức công trường sau: HCMC METRO LINE 1 ‐ CP2 BIỆN PHÁP THI CÔNG LẮP ĐẶT SÀN NÂNG ‐ NHÀ GA VÀ DEPOT

Ngày đăng: 29/08/2021, 17:39

Từ khóa liên quan

Tài liệu cùng người dùng

Tài liệu liên quan