I. MOBILIZATION WORKS AND MOBILIZATION PLAN
1.1 Setting up the construction site
Due to the special manner of project, that can shorten the construction time. Base on the topography, scope of work, and item of work to be listed in the designed document, the Contractor shall arrange the works with the following sections:
Base on each item section of work of, the Contractor shall assign the special constructed groups as shown in the “Workforce Mobilization Plan”
Utilize in maximum of the construction equipment
The project schedule and management is very important, that shall be prepared by the Project Manager, soon after having the Acceptant Letter be issued by the Employer. The following shall be the main sections:
The preparation including of:
2.2 The schedule of the execution
2.3 The preparation of the construction method
2.5 Management and testing at site