THÔNG TIN TÀI LIỆU
Thông tin cơ bản
Định dạng | |
---|---|
Số trang | 155 |
Dung lượng | 4,45 MB |
Nội dung
Ngày đăng: 28/01/2021, 21:22
Nguồn tham khảo
Tài liệu tham khảo | Loại | Chi tiết | ||
---|---|---|---|---|
[16] Garcia J.M (2006 ) Theory and Practical Exercises of System Dynamics, Barcelona, Spain | Sách, tạp chí |
|
||
[24]Hubbard, D. G. (1990) Successful utility project management from lessons learned. Proj. Manage. J., 21~3, 19–23 | Sách, tạp chí |
|
||
[1] Russell, J., Skibniewski, J. & Cozier, D. (1990) Qualifier-2: knowledge-based system for contractor pre-qualification. Journal of Construction Engineering, ASCE, 116, 322–331 | Khác | |||
[2] L. Crowley, D. Hancher (1995) Risk assessment of competitive procurement. Journal of Construction Engineering and Management, 121, 241–248 | Khác | |||
[3] Ibrahim M. Mahdi, Mike J. Riley , Sami M. Fereig, Alex P. Ale (2002). A Multi- Criteria Approach To Contractor Selection, Engineering Construction andArchitectural Management ,Volume 9, issue 1 | Khác | |||
[4] Y.Ilker Topcu (2003). A decision model proposal for construction contractor selection in Turkey , Building and Environment, Volume:39, Issue:4 | Khác | |||
[5] Irem Dikmen, M. Talat Birgonul (2003). Strategic perspective of Turkish Construction Companies, Journal of Management in Engineering, Vol 19, Issue 1 | Khác | |||
[6] Ansoff, H. I. (1965). Corporate strategy: An analytic approach to business policy for growth and expansion, McGraw-Hill, New York | Khác | |||
[7] Porter, Michael E. Free Prese. (1980). Competitive strategy: Techniques for analysing industries and competitors, Industrial Marketing Management, Volume 11 , issue 4 | Khác | |||
[8] Edwin A. Locke et al (1981) Goal Setting and Task Performance: 1969-1980, Psychological Bulletin, Volume:90, Issue:1 | Khác | |||
[9] Daniel Baloi; Andrew D.F. Price (2003) . Modelling Global Risk Factors Affecting Construction Cost Performance, International Journal of Project Management, Volume 21, issue 4 | Khác | |||
[10] N. El-Sawalhi, D. Eaton, R. Rustom, (2007) Contractor prequalification model: state-of the-art, International Journal of Project Management , 25(5), 465–474 | Khác | |||
[11] Mawdesley, M.J., Al-Jibouri, S. (2010). Modelling construction project productivity using systems dynamics approach. International Journal of Productivity and Performance Management 59 (1), 18–36 | Khác | |||
[12] Richardson, G.P., Pugh, A.L., (1981). Introduction to System Dynamics Modeling with Dynamo. MIT Press, Cambridge, Mass | Khác | |||
[13] Coyle, R.G. (1996). System Dynamics Modelling: A Practical Approach, Journal of the Operational Research Society , Volume:48 , Issue:5 | Khác | |||
[14] Pratap K. J. Mohapatra, Purnendu Mandal, Madhab C. Bora (1994). Introduction To System Dynamics Modeling, SangamBooks, London, p.25-43 | Khác | |||
[17] Nguyễn Văn Định. Bài giảng Chuyên đề Logic mờ và ứng dụng, Khoa CNTT, Học Viện NN Việt Nam | Khác | |||
[18] Phan Xuân Minh, Nguyễn Ngọc Phước (1997). Lý thuyết điều khiển mờ , Nhà xuất bản khoa học và kỹ thuật | Khác | |||
[19] Nguyễn Cát Hồ, Nguyễn Công Hào ( 2009). Giáo trình Logic mờ và ứng dụng , Khoa Công Nghệ Thông Tin, Trường Đại học Khoa Học | Khác | |||
[20] Hans Hellendoorn, Christoph Thomas ( 1993). Defuzzification In Fuzzy Controllers , Journal of Intelligent and Fuzzy Systems, Vol. 1, 109-123 | Khác |
TỪ KHÓA LIÊN QUAN
TÀI LIỆU CÙNG NGƯỜI DÙNG
TÀI LIỆU LIÊN QUAN