Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống
1
/ 72 trang
THÔNG TIN TÀI LIỆU
Thông tin cơ bản
Định dạng
Số trang
72
Dung lượng
1,34 MB
Nội dung
E3035 v8 Subproject: Distribution Efficiency Project HA NOI POWER CORPORATION Distribution Efficiency Project (dep) HA NOI POWER CORPORATION Component 1: Improve rural nework of old Ha Noi area - phase Component 1: Improve Ha Dong District and Son Tay town networks Environmental Management Plan (EMP) Establisher Ha noi, : Pham Thi Hai 19 April 2012 dong hai consulting and construction joint stock company Table of contents Environmental Management Plan Subproject: Distribution Efficiency Project (EMP) .1 I GENERAL INTRODUCTION .3 II POLICY, REGULATIONS, AND INSTITUTIONAL FRAMEWORKS 2.1 Vietnamese Legislations 2.2 World Bank Safeguard Policies .5 III SUBPROJECT DESCRIPTION AND SCOPE OF WORK 3.1 Objectives of the Subproject 3.2 Subproject Location .5 3.3 Subproject Management Organization 3.4 Subproject description 3.4.1 Medium voltage line 3.4.2 Medium voltage underground cable 10 3.4.3 Low voltage line 12 3.4.4 Substation 17 3.6 Main Activities Before and During Construction 24 3.6.1 Main Activities Before and During Construction 24 3.6.2 Transprortation 24 3.7 Subproject Implementation Schedule and Total Investment .25 3.7.1 Subproject Implementation Schedule 25 3.7.2 Total investment of the project: 25 IV ENVIRONMETNAL BACKGROUND 26 4.1 Summary of natural condition and society of Long Bien district .26 4.2 Summary of natural condition and society of Hoang Mai district 27 4.4 Summary of natural condition and society of Soc Son district 28 4.5 Summary of natural condition and society of Gia Lam district 29 4.6 Summary of natural condition and society of Dong Anh district 29 4.7 Summary of natural condition and society of Ha Dong district 30 4.8 Summary of natural condition and society of Son Tay town 30 V SUBPROJECT POTENTIAL IMPACTS 31 5.1 Environmental screening: 31 VI ENVIRONMENTAL MANAGEMENT PLAN: .36 6.1 Mitigation measures: 36 VII.ENVIRONMENTAL MONITORING PLAN 49 VIII EMP IMPLEMENTATION ARRANGEMENT AND CAPACITY BUILDING 52 a) During Detailed Design and Preparation of Bidding Contract Documents .52 b) During Construction Phase 52 IX REPORTING PROCEDURE 54 X CAPACITY BUILDING FOR EMP IMPLEMENTATION .55 XI.ESTIMATED COST FOR IMPLEMENTING THE EMP .56 XII COMMUNITY CONSULTATION AND DISCLOSURE OF INFORMATION 57 12.1 Community consultation: 57 12.2 Disclosure of information: 62 ANNEX .63 TOR for monitoring of emp implementation for construction supervising consultant 63 ANNEX .65 Report template for monitoring of EMP implementation 65 ANNEX .67 Report template for monitoring of EMP implementation 67 ANNEX .69 Subproject area map .69 ANNEX .70 Some pictures of project area 70 Environmental Management Plan Subproject: Distribution Efficiency Project ANNEX .71 Consultancy minutes 71 ANNEX .72 Environmental protection commitment 72 I GENERAL INTRODUCTION According to electric network investigation figures at districts of Ha Noi city found that some of Medium voltage lines and low voltage networks not ensure reliability and safety in supply electricity needed to be upgraded voltage and fall cable for ensure reliability Although Some of Low voltage networks are still good but go in the garden of private house, too close the private house This will make the operation meet with difficulty in the future Therefore, they have to be adjusted to reduce compensation cost Many actual substations is Environmental Management Plan Subproject: Distribution Efficiency Project over load because the the growing rate is too fast Thus, the upgrowth of capacity and supplement of substation to share for actual over load substation is necessary Ha Noi Distribution Efficiency subproject comprises two components as follow: 1.Component 1: Improve rural network of old Ha Noi area – phase 2.Component 2: Improve Ha Dong District and Son Tay town networks The Subproject is implemented in districts of Ha Noi city include: Long Bien District, Hoang Mai district, Tu Liem urban district, Gia Lam urban district, Soc Son urban district, Dong Anh urban district, Ha Dong district and Son Tay town The activities of the project include: i) Construct fifty two of new 35/0.4 kV and 22/0.4kV substations; ii) improve 25 substations; iii) move substations; iv) New construction and improve 25.427 km 22kV and 35kV underground cable; v) New construction and improve 926.842 km low voltage line These activities can cause negative impacts on environment and public in preconstruction phase, construction phase and operation phase To ensure that the potential negative impacts are identified and mitigated during project implementation and compliance with policies on environment assessment of World Bank (OP/BP 4.01), Environment Management Plan (EMP) of project had been prepared in accordance with the guidance of the Environment Management Framework (EMF) of DEP This EMP includes: project description, policy framework, regulations of environmental technical, the potential negative impacts, the proposed mitigation methods will be implemented in the periods of pre-construction, construction and operation, implementation arrangements EMP also includes Environmental Codes of Practice (ECOP) will be incorporated into tender documents and contract, attached with environmental monitoring According to regulations of VietNam government, the subproject has to make environmental protection commitment The environmental protection commitment of the subproject is confirmed in the document No 288/TB-UBND dated on 13 December, 2011 by Gia Lam District people’s Commitee – Ha Noi city, Document No 712/TB-UBND dated on 27th December, 2011 by Hoang Mai District people’s Commitee – Ha Noi city, document No 643/TB-UBND dated on 31st December, 2011 by Tu Liem District people’s Commitee – Ha Noi city II POLICY, REGULATIONS, AND INSTITUTIONAL FRAMEWORKS 2.1 Vietnamese Legislations • Law on Protection of the Environment No 52/2005/QH11 passed by the National Assembly on November, 29th, 2005 regulates the obligations of individuals, organizations in protecting environment • Law on Water Resource No 08/1998/QH10 dated 20 May, 1998 • Decree of Government No 80/2006/ND-CP dated August, 2006 on guidance for implementation of Law on Protection of the Environment • Decree of Government No 29/2011/ND-CP dated 18 April, 2006 regulating strategic environmental assessment, environmental impact assessment and environment protection commitment • Circular No.26/2011/TT-BTNMT dated 18 July, 2011 on guidance for Decree No.29/2011/ND-CP dated 18 April, 2011 • Decree of Government No.106/2005/ND-CP dated 17 August, 2005 on guidance for Law on electricity relating to the protection of high-voltage networks Environmental Management Plan Subproject: Distribution Efficiency Project • Decree of Government No.81/2009/ND-CP dated 12 October, 2009 amending some Article of Decree No.106/2005/ND-CP dated 17 August, 2005 • Circular No.12/2011/TT-BTNMT dated 14 April, 2011 relating to toxic waste management • Vietnam National Standard: QCVN01: 2009/BYT- national technical regulation on drinking water quality; QCVN02: 2009/BYT- national technical regulation on domestic water quality; QCVN08: 2008/BTNMT - national technical regulation on surface water quality; QCVN09: 2008/BTNMT - national technical regulation on ground water quality; QCVN05: 2009/BTNMT – air quality – Standard for ambient air quality; QCVN06: 2009/BTNMT – air quality –specified maximum allowable concentrations of certain hazardous substances in ambient air • Guidance of EVN No 2623/CV-EVN - KHCN & MT dated 28 May, 2007 on management and pollution prevention and exposure to PCBs 2.2 World Bank Safeguard Policies An environmental screening was undertaken in line with the guidelines provided in the Environmental Management Framework (EMF) of the DEP project and it showed that the World Bank’s policies on Environmental Assessment (OP 4.01) and Involuntary Resettlement (OP 4.12) will be triggered for the subproject In addition, the Bank’s requirements on public consultation and information disclosure will need to be followed The implementation of policy on involuntary resettlement (OP 4.12) will be addressed in a separate report III SUBPROJECT DESCRIPTION AND SCOPE OF WORK 3.1 Objectives of the Subproject The objectives of the proposed subproject are to: - Prevent overload of the local power grid for the subproject communes - Reduce power losses, improve electricity quality, and provide stable power the areas - New construction and improve electric network to meet demand for use of electricity to develop socio-economic at present and in the future of subproject area 3.2 Subproject Location The subproject is implemented in 74 communes in districts of Ha Noi city comprise: Long Bien District, Hoang Mai district, Tu Liem urban district, Gia Lam urban district, Soc Son urban district, Dong Anh urban district, Ha Dong district and Son Tay town List of communes in the project, as follow: Hoang Mai district (7 wards) Thinh Liet ward Đai Kim ward Hoang Liet ward Linh Nam ward Yen So ward Hoang Van Thu ward Thanh Tri ward Tu Liem district (9 Gia Lam District (10 communes ) communes) Trung Van commune Yen Vien commune Me Tri commune Yen Thuong commune Tay Tuu commune Phu Dong commune Xuan Phuong commune Co Bi commune Minh Khai commune Dang Xa commune Tay Mo commune Trau Quy Townlet Dai Mo commune Da Ton commune Environmental Management Plan Subproject: Distribution Efficiency Project Thuy Phuong commune Phu Dien commune Dong Anh communes) Kim No Co Loa Dai Mach Viet Hung Vong La disctrict Ha Dong (6 wards) Phu Luong ward Phu Lam ward Phu La ward Dong Mai ward Bien Giang ward Yen Nghia ward (5 Long Bien district wards): Long Bien ward Ngoc Thuy ward Duc Giang ward Sai Dong ward Thuong Thanh Viet Hung ward Bo De ward Phuc Loi ward Gia Thuy ward Kim Son commune Duong Xa commune Phu Thuy commune (9 Soc Son district (15 communes) Hong Ky commune Trung Gia commune Tan Minh commune Kim Lu commune Xuan Thu commune Tan Dan commune Minh Tri commune Mai Dinh commune Hien Ninh commune Phu Lo commune Phu Ninh commune Quang Tien commune Duc Hoa commune Xuan Giang commune Viet Long commune Son Tay Town (13 wards, communes) Son Dong commune Kim Son commune Co Dong commune Xuan Son commune Thanh My commune Duong Lam commune Xuan Khanh ward Phu Thinh ward Trung Son Tram ward Ngo Quyen commune Le Loi Ward Son Loc Ward Quang Trung Ward 3.3 Subproject Management Organization - Subproject Owner: Electricity of Ha Noi coporation - Technical Design Consulting Unit: Dong Hai consulting and construction joint stock company - Subproject Management Unit: Project management Board of EVN Ha Noi - Electricity of Ha Noi coporation 3.4 Subproject description 3.4.1 Medium voltage line Newly construction and improve 35.182 km medium voltage line Length of section and subproject areas which line passes descriped as follow: Environmental Management Plan Subproject: Distribution Efficiency Project Table 3.4.1 Table of description voltage line Length No Section (m) I Dong Anh district CoLoa commune MV transmission line supply electricity for 500 Xom Vang substation Viet Hung commune MV transmission line supplies electricity for 450 Gia Luong substation MV transmission line supplies electricity for 450 Lo Giao substation MV transmission line supplies electricity for 270 Doai substation II Vong La commune MV transmission line supplies electricity for Lang Chai 330 substation The line goes along the rice field and the village road to new Xom Vang Substation MV transmission line supplies electricity for Gia Luong substation is connected to the pole of Gia Luong substation belong to 473E1 feeder It passes through the rice fields and village road to New Gia Luong substation MV transmission line supplies electricity for Lo Giao substation connected to Pole belong to 473E1 feeder It passes through the road then goes along the village road to new Lo Giao substation It starts at pole No belong to feeder476 E1 It passes through the railway then goes along the village road of Viet Hung commune then goes across the rice field to new Doai substation The line starts from connected point pole then goes along the village road to new Lang Chai substation 1,080 The branch is connected at the pole before the pole belong to Tan Yen substation – feeder Trung Gia 972-TG It goes above the rice field to Ca Phe substation Trung Gia commune Branch to Xom Do substation Branch to Xuan Son substation Description Soc Son district Hong Ky commune Branch to Ca Phe substation of improvement and newly construction medium 356 256 The branch is connected at T6 pole belong to feeder 972 TG It goes along the village road to Xom Do substation The branch is connected at feeder972 TG It goes along the village road and rice field to Xuan Son Substation Tan Minh commune Branch to Xuan Dong substation 30 The branch is connected at no number pole belong to 674 Da Phuc intermediate feeder It goes along the village road to Xuan Dong substation Environmental Management Plan Subproject: Distribution Efficiency Project Branch to Son Doai substation Kim Lu commune Branch to Xuan Duong substation 500 Branch to Kim Trung substation 300 Branch to My Linh substation branch Minh Tri commune Branch to Go Gao substation Branch to Lap Tri substation 350 700 100 1,252 The branch is connected at the pole before Dong Bong substation belong to 478 E19 feeder It goes along the village road to Go Gao substation 531 The branch is connected at the pole before Dong Bong substation belong to 478 E19 feeder It goes along the village road to Lap Tri substation 400 The branch is connected at the added pole between 31 and 32 pole belong to 672 Da Phuc intermediate feeder It goes along the village road to Hoang Duong substation 900 The branch is connected at no number pole belong to 673 Phu Lo intermediate feeder It goes along the village road to Noi Phat substation 150 The branch is connected at the pole number 16 belong to 671 Phu Lo intermediate feeder It goes along the village road to Phu Lo substation 40 The branch is connected at the pole number belong to 478 E1.19 feeder It goes along the village road to Ve Linh substation 300 The branch is connected at the pole number belong to 972 Da Phuc intermediate feeder It goes along the village road to Cong Hoa substation Branch to Noi Phat Substation Phu Lo commune Branch to Phu Lo substation 10 Phu Linh commune Branch to Ve Linh substation Branch to Cong Hoa substation 11 The branch is connected at the pole before electric industrial school It goes along the village road to Xuan Ap substation The branch is connected at pole number belong to 478 E1.19 feeder It goes along the village road to My Linh substation Mai Dinh commune Branch to Hoang Duong substation The branch is connected at no number pole belong to 674 Da Phuc intermediate feeder It goes along the village road to Xuan Ap substation Tan Dan commune Branch to Xuan Ap substation The branch is connected at pole number belong to 674 feeder It goes along the village road to Xuan Duong substation The branch is connected at no number pole before Kim Trung substation It goes along the village road to Kim Trung substation Xuan Thu commune Branch to Xuan Lai substation 520 The branch is connected at no number pole belong to 974 Da Phuc intermediate feeder It goes along the village road to Son Doai substation Duc Hoa commune Environmental Management Plan Subproject: Distribution Efficiency Project Branch to Thanh Hue 600 Branch to Hau Duc 400 Branch to Duc Hoa substation 12 13 III IV V Xuan Giang commune Branch to Lai Cach substation Viet Long commune Branch to Tang Long substation Branch to Luong Phuc substation Long Bien district Ngoc Thuy ward Branch to Ngoc Thuy group 20 substation Phuc Loi Ward Branch to Phuc Loi 14 substation Ha Dong district Phu Luong Commune The line passes through the railway Son Tay Town Feeder973 starts at E1.7 to the pole N0 from Tung Thien intermediate Feeder979 from E1.7 to the pole N0 17 Feeder973 from Tung Thien intermediary to the pole No 176 400 490 70 300 The branch is connected between pole 20 and 21 belong to 674 Da Phuc intermediate feeder It goes along the village road to Thanh Hue substation The branch is connected at the pole number belong to 674 Da Phuc intermediate feeder It goes across the field to Duc Hau substation The branch is connected at the pole number belong to 674 Da Phuc intermediate feeder It goes along the village road to Duc Hoa substation The branch is connected to 478 E1.19 feeder It goes along the village road to Lai Cach substation The branch is connected to 973 Trung Gia-Dong Ngan feeder It goes along the village road to Tang Long substation The branch is connected to 478-E19 feeder It goes along the village road to Lai Cach substation 320 The branch is connected at the pole number belong to 375 E1 feeder It goes along the field to Ngoc Thuy group 20 substation 518 The branch is connected at Hoi Xa substation bus work belong to 373-E2 feeder It goes along the village road to Phuc Loi 14 substation 720 The line passes through the railway ( border Ha Dong station) 6,398 This feeder starts from E1.7 It goes above the rice field and private house to the pole number from Tung Thien intermediary Then it is connected to Tung Thien intermediate substation 9,585 4,371 This Feeder starts from E1.7 It goes across the garden, field and private house to near 19/5 business substation From that point it turns left It goes closely to ancient town to close material depot substation then turn right It follows closely road 32 to the pole No 63 belong to Son Tay, Ba Vi district, Ha Noi city This Feeder starts from Tung Thien intermediary It goes along the street and the village road to close Son Tay-Xuan Mai road From that point it turns right then follows closely Son Tay-Xuan Mai road to circuit breaker 176 Environmental Management Plan Subproject: Distribution Efficiency Project Branch to moving substations 1,245 3.4.2 Medium voltage underground cable Total length of new construction and improvement medium voltage underground cable feeder is 25.427km The length of every section and subproject area that the line goes through described as follow: Table 3.4.2: Description of new construction and improve medium voltage underground cable line N Section Length Description (m) I Tu Liem district 24kV Medium The line goes along pavement of Do Duc Duc street voltage then turn in lane It goes along side of the lane near underground cable 416 wasteland It supplies electricity for new Me Tri feeder to Me Tri substation substation II Gia Lam district 35kV Medium The line goes along canal edge of An Dao street It voltage supplies electricity for new Trau Quy 11 substation underground cable 280 feeder supply electricity for Trau Quy 11 substation III Hoang Mai district Yen So Ward Section from pole 14 to Yen Duyen 135 The line goes on the roadside border on private house church substation Section from Yen Duyen church substation to Yen Duyen substation Section from Yen Duyen substation to Van Chi substation Section from pole number 30.1 to Yen Duyen B substation Thinh Liet ward 24kV Medium voltage 416 461 498 271 The line goes on the roadside border on private house The line goes on the road right, a part of it boder on private house, a part of it boder onYen So lake The line goes on the road right to near pole number 38 From that point it turns left to Yen Duyen B substation The line starts from Thinh Liet substation belong to feeder 484 E3 It goes along 1141 lane, Giai Phong Environmental Management Plan Subproject: Distribution Efficiency Project The result obtained through the community consultation are summarized as follows: N I District (ward/commune) Place Time Number of Participants Delegate Summary comment of delegates Hoang Mai district Nguyen Van Sang : Vice chairman of ward people’s committee Tran Thi Minh: Chairman of the Executive Board of the farmer Ta Thi Tha: Representative of women's Executive Board Hoang Liet ward Hoang Liet ward people’s committee hall h to 11h30 date 13/12/2011 11 - Guiding People in the project area electrical safety measures - Minimize the impact on daily life of the people Nguyen Dinh Tuat: Chairman of Fatherland Front Committee Tran Ba Giap: Representation of veterans’s organization Executive Board Tran Toan Thuong: Representative of league Executive Board The representative household assets affected: 5/8 households 58 Subproject: Distribution Efficiency Project Nguyen Tiet Cuong: Vice chairman of ward people’s committee - Implement measures to minimize environmental impact - Implementation of the appropriate time to reduce the loss of property to people - Construction implementation when the crop harvested - Implement measures to minimize environmental impact Tran Thi Thuy Hang: Secretary of league Executive Board Hoang Van Thu ward Hoang Van Thu ward people’s committee hall h to 11h30 date 9/12/2011 11 Dinh Thi Ngat: Chairman of women's Executive Board Tran Xuan Ngoc: Vice chairman of Fatherland Front committee The representative household assets affected: 7/7 households II Tu Liem district Nguyen Trong Cong: Chairman of commune people’s committee Trung Van commune Trung Van commune people’s committe hall Ngo Quang Chien: Representative Veterans’ organization 1h to 4h date 14/12/2011 Bui Dinh Loc: Chairman of commune Fatherland Front committee The representative household assets affected: 3/3 households 59 Subproject: Distribution Efficiency Project Nguyen Thi Huong: Vice chairman of commune people’s committee Me Tri commune Me Tri commune people’s committee hall 7h30 to 11h30 date 10/12/2011 10 - Construction implementation when the crop harvested - Guiding People in the project area electrical safety measures - Construction implementation when the crop harvested - Implement measures to minimize environmental impact - Guiding People in the project area electrical safety measures Thu Hoa: Representative of women's Executive Board Ngo Van Tich: Representative of the Executive Board of the farmer The representative household assets affected: 7/7 households Nguyen Minh Giang: Chairman of commune people’s committee Nguyen Thi Thoa: Representative of women's Executive Board Dai Mo commune Dai Mo commune people’s committee hall 7h30 to 11h30 date 8/12/2011 11 Do Dac Tieu: Representative of veterans’ organization Executive Board The representative household assets affected: 7/8 households III Gia Lam district 60 Subproject: Distribution Efficiency Project Tran Duc Dien: Chairman of commune people’s committee Da Ton commune Da Ton commune From 1h30 to 5h people’s date 12/12/2011 committee hall - Construction implementation when the crop harvested - Implement measures to minimize environmental impact - Construction implementation when the crop harvested - Implement measures to minimize environmental impact Bui Van Ma: Representation of commune Fatherland Front committee 11 Nguyen Thi Nga: Representative of women's Executive Board Le Anh Dung: Representative of league Executive Board The representative household assets affected: 6/6 households Phu Thi commune Phu Thi commune people’s committee hall 7h30 to 11h30 date 13/12/2011 11 Le Van Huy: Chairman of commune people’s committee Nguyen Van Thanh: Chairman of commune Fatherland Front committee Dang Van Dac: Representative of elderly people commune Executive Committee Nguyen Duong Thanh: 61 Subproject: Distribution Efficiency Project Representative of the Executive Board of the farmer The representative household assets affected: 7/8 households - Guiding People in the project area electrical safety measures 12.2 Disclosure of information: - The EMP report in Vietnamese will be announced at ward/commune People's Committee in the subproject area for the public, organizations are able to access The abbreviated EMP will be sent to the ward People's Committee that the line come across to announce for crowded public to stydy Estimated disclosure time is in April 2012 - The EMP report in English and Vietnamese will be sent to The Center for Information and Development of Vietnam at 63 Ly Thai To Hanoi for the evaluation of government office and community; - The EMP report in English will be sent to the Infoshop of World Bank in Washington to announce 62 Subproject: Distribution Efficiency Project ANNEX TOR for monitoring of emp implementation for construction supervising consultant Background The construction supervising consultant will deliver technical services (“Services”) to ensure efficient implementation of the EMP for the project Scope of services: Services provided by the supervising consultant will include reviewing and monitoring of construction activities to ensure mitigation measures described in the EMP for the project are correctly complied with and negative environmental impacts are minimized On behalf of the PMU, supervising consultant undertakes the following duties: - Conduct frequent field inspection; - Review the implementation of environmental protection measures described in the EMP and contract documentation; - Review the effectiveness of the mitigation measures and environmental performance of the project; - If necessary, validate the acceptability of construction methods with regards to environmental compliance (for temporary and permanent items), relevant design plans and other submitted documents If necessary, the supervising consultant will seek for and recommend methods with less environmental impacts with consultation with the design consultant and the PMU; - Validate inspection results with regards to any non-conformance to environmental performance and effectiveness of any countermeasures; - Provide audit results for the leading engineer of the contractor in accordance with nonconformance handling procedure described in the EMP; - Direct the contractor to take corrective actions within a specific time period and exercise additional monitoring if necessary, as per the requirements of the contract in case of nonconformance and complaints; - Direct the contractor to take actions to mitigate impacts and comply with the EMP in case non-conformance is found; - Direct the contractor to stop any activity resulting negative impacts and/or in case the contractor does not fulfill requirements of the EMP, to take corrective actions - For contracts that need Site Environmental Management Plan (SEMP), the supervising consultant will conduct a final review and approve all environmental plans at the site that may affect environment This work includes but not limited to: dredging areas, material quarries and dumping areas and worker houses The supervising consultant will review and approve such SEMP submitted by the contractor If such plans are found non-compliant to the EMP, EPC or RAP, the supervising consultant will work with the PMU and contractor for a proper solution - Complaint handling: Complaints from local residents will be collected by site officer of the contractor, which may include violations to noise level, dust concentration and traffic safety requirements The lead consultant of the contractor and the supervising consultant will address and work out a final solution organizes all such complaints The supervising 63 Subproject: Distribution Efficiency Project consultant will provide a list of these complaints and confirm they have been properly handled by the contractor in the same way with issued identified during site inspection - Confirmation of monthly payment: The supervising consultant will confirm monthly payment for environment related activities undertaken by the contractor - Report: The supervising consultant will make the following reports in English: o Report twice a week on non-conformances o Monthly summary report will include issues and findings from the reviewing and monitoring of construction activities o At the end of project, the supervising consultant will make a final summary report on findings from their work, number of violations, and solutions, etc as well as provide consultancy and guidance on how to implement such duties in future 64 Subproject: Distribution Efficiency Project ANNEX Report template for monitoring of EMP implementation (Used for report by supervising consultant to PMU) Project name: Project location: Province: District: Commune/Town: Supervising consultant: Full name No Date of report:…………………… Parameter Assessment of comments by supervising consultant and community Comment/ Recommenda tion Construction phase Water turbidity and soil erosion Noise level at the site and nearby residential area Dust concentration Solid waste and site cleaning after construction Conflict between workers and local residents Disease spreading Hygiene condition and safety for workers Local traffic interruption Road damage 10 Safety measure application 11 Material management 12 Remained soil and rock management 13 Evidences about loss to biodiversity (if any) 14 Evidences about loss to cultural and 65 Subproject: Distribution Efficiency Project No Parameter Assessment of comments by supervising consultant and community Comment/ Recommenda tion historical sites 15 Other environmental issues (if any) … Operation phase 16 Transmission line lobby maintenance 17 Health and safety for operation workers and local residents 66 Subproject: Distribution Efficiency Project ANNEX Report template for monitoring of EMP implementation (Used for reports by contractor) Project name: Project location: Contractor name: Initial or monthly report: Date of report: No Impact Mitigation measure taken Comment Construction phase Surface water pollution Noise and vibration level Soil erosion Air pollution Impacts on agriculture land due to temporary land acquisition Local traffic interruptions Existing road damage Solid waste from excavation Remained soil management 10 Environmental impacts by workers 11 Conflict between workers and local residents 12 Disease spreading between workers and local residents 13 Health and safety 14 … Reported by : Title : Address : 67 Subproject: Distribution Efficiency Project Telephone : 68 Subproject: Distribution Efficiency Project ANNEX Subproject area map 69 Subproject: Distribution Efficiency Project ANNEX Some pictures of project area TBA Liên Hợp - xã Tây Mỗ TBA Tây Tựu - xã Tây Tựu Cột hạ tận dụng Cột hạ tận dụng Cột hạ tháo dỡ Cột hạ tháo dỡ 70 Subproject: Distribution Efficiency Project ANNEX Consultancy minutes 71 Subproject: Distribution Efficiency Project ANNEX Environmental protection commitment 72