1. Trang chủ
  2. » Thể loại khác

SV PTA no 2 20171124

60 72 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Cấu trúc

  • 1. Cover

  • 2. Content

  • 3. Fly Sheet_Section 2

  • Staff Village Design Brief REV3 24Nov2017

  • Staff Village Sample MP Revision 3

    • Sheets and Views

      • Layout1

  • The Laundry Estimation

  • 5. Fly Sheet

  • MEP_TS of Staff Housing - Scope of Works (MEP)20171124(d)

Nội dung

HOI AN SOUTH DEVELOPMENT PROJECT PHASE DUY HAI COMMUNE - DUY XUYEN DISTRICT QUANG NAM PROVINCE STAFF VILLAGE CONTRACT POST TENDER ADDENDUM NO.2 EMPLOYER EXECUTIVE ARCHITECT HOI AN SOUTH DEVELOPMENT LIMITED Tay Son Tay Hamlet, Duy Hai Commune Duy Xuyen District, Quang Nam Province Vietnam WONG & OUYANG (HK) LTD 27/F, Dorset House, Taikoo place 979 King’s Road Hong Kong ARCHITECT DESIGN MECHANICAL & ELECTRICAL ENGINEER WATG SINGAPORE INC Commonwealth Ln., #02-03 Singapore 149555 PARSONS BRINCKERHOFF (ASIA) LTD 7F One Kowloon, Wang Yuen Street Kowloon Bay, Kowloon Hong Kong STRUCTURAL ENGINEER QUANTITY SURVEYOR P&T CONSULTANTS (VIETNAM) CO.LTD 4/F Dinh Le Building, 01 Dinh Le Street, Ward 12, District 4, Ho Chi Minh City Vietnam WT PARTNERSHIP (VIETNAM) LTD TMS Building, Level 3, Unit 301 172 Hai Ba Trung Street, Dakao Ward District 1, HCM City Vietnam FAÇADE CONSULTANT CIVIL ENGINEER INHABIT GROUP (HK) 2/F Shen Kwong, Commercial Building 8, Des Voeux Road West Hong Kong ARUP (HK) LTD Level Festival Walk 80 Tat Chee Avenue, Kowloon Tong Kowloon Hong Kong NOVEMBER 2017 HOI AN SOUTH DEVELOPMENT PHASE STAFF VILLAGE CONTRACT POST TENDER ADDENDUM NO.2 CONTENT Item Tender Documents To Refer Description Total page Volume - Section (2.3.1) Architectural Design Brief & Specifications pages Volume - Section (2.3.5) MEP Design Brief & Specificaitions 48 pages Total 56 pages SECTION (2.3.1) ARCHITECTUAL DESIGN BRIEF & SPECIFICATIONS DESIGN BRIEF & ACCOMMODATION SCHEDULE SUMMARY HOIANA STAFF VILLAGE REV 24 November 2017 Area No 1.00 1.01 Room Name Staff Rooms Bedroom Apartment (4 Pax) Space Requirements No.(s) Area (m2) Remarks  Personal wardrobe for clothes and belongings  Secure storage drawers  Study/ writing table  Mirror for grooming  Attached full bathroom  Power points  Rubbish bin location  Living room  Kitchen and dining area  Balcony with screen for AC outdoor units 480 57.2 m2  Kitchen equipment for every unit apartment are treated as loose home appliances Contractor shall allow cost for delivery, receiving, storage and installation  Refer to Staff Village Matrix  Kitchen equipment for every unit apartment are treated as loose home appliances Contractor shall allow cost for delivery, receiving, storage and installation  Refer to Staff Village Matrix  Kitchen equipment for every unit apartment are treated as loose home appliances Contractor shall allow cost for delivery, receiving, storage and installation  Refer to Staff Village Matrix 1.02 Bedroom Apartment (2 Pax)  Personal wardrobe for clothes and belongings  Secure storage drawers  Study/ writing table  Mirror for grooming  Attached full bathroom  Power points  Rubbish bin location  Living room  Kitchen and dining area  Balcony with screen for AC outdoor units 48 57.2 m2 1.03 Bedroom Apartment (1 Pax)  Personal wardrobe for clothes and belongings  Secure storage drawers  Study/ writing table  Mirror for grooming  Attached full bathroom  Power points  Rubbish bin location  Living room  Kitchen and dining area  Balcony with screen for AC outdoor units 72 37.96 m2 5 / 12 DESIGN BRIEF & ACCOMMODATION SCHEDULE SUMMARY HOIANA STAFF VILLAGE REV 24 November 2017 Area No 2.00 2.01 Room Name Administration Office Admin/ Manager support personnel 2.02 Lobby, reception and security 2.03 Staff Academy Office 2.04 Recreation room 2.05 Gym 2.06 Mini mart / Convenience store Hair, beauty salon and SPA Coffee shop / staff bar 2.07 2.08 2.09 Online gaming area (internet café) Space Requirements No.(s) Area (m2) Remarks  The administrative office shall house the Staff Village manager and support personnel  An open plan office area together with one enclosed office shall be provided  The office shall be easily accessible and close to the reception area  A reception counter shall be set up at the entry lobby  The counter shall also double as the security counter to control and monitor access  The reception and security could be combined with the administrative office with a window into the entry foyer  Provide lounge for waiting area 20 m2 Total area including office + open plan Area to be proportion with the number of occupants           Provide open office for staff Stationary storage Pantry Indoor recreational area for billiards, table tennis, board games and TV Treadmills Exercise bicycles Free weight set Bench press multi-use machine Bare shell finished – operation to be outsource  Bare shell finished – operation to be outsource  Cold room facilities  Bar Fridges  Tables and chairs for 100 Pax  Pantry  Wash area  Long desk with separate booths (outsourced) 175 m2 65 m2 75 m2 20 m2 120m2 To be in one building only 30 m2 6 / 12 DESIGN BRIEF & ACCOMMODATION SCHEDULE SUMMARY HOIANA STAFF VILLAGE REV 24 November 2017 Area No 3.00 Room Name Multi- Purpose Building Food and Beverage Areas Space Requirements To be located at Ground Floor of Multi-purpose building Kitchen and dining shall be also utilized for staff training  Food and beverage facilities  Seating area to be designed as a series of connected & contrasting spaces + seating configurations  The Staff Diner will operate from 06.00 am to 20.00 every day, with three meal periods  The menu will consist primarily of standard Vietnamese dishes, with some Chinese and Western alternatives  There should be a salad bar, coffee station etc  All the meals will be prepared onsite in the staff diner, so it will need to be equipped a with fully functional kitchen, able to prepare up to 300 meals per seating 3.01 Dining 3.02 Adjacent outdoor covered terrace  To be used as outdoor dining 3.03 Food Preparation 3.04 Food dry storage pantry  The kitchen facilities and dishing out facility shall be designed by the food services consultant  Kitchen shall be also utilized for staff training  To be confirmed by kitchen consultant 3.05 Food cold storage 3.06 Male and Female  washroom  To be confirmed by kitchen consultant To comply the local code as required No.(s) Area (m2) Remarks Refer to sample mater plan for location 700 m2  All areas to be reconfirmed by Kitchen Consultant  Refer to enclosed Master Plan sample for location 50 m2  All areas to be reconfirmed by Kitchen Consultant 150 m2 All areas to be reconfirmed by Kitchen Consultant m2 All areas to be reconfirmed by Kitchen Consultant m2 All areas to be reconfirmed by Kitchen Consultant As local code required 7 / 12 DESIGN BRIEF & ACCOMMODATION SCHEDULE SUMMARY HOIANA STAFF VILLAGE REV 24 November 2017 Area No Room Name Staff Village Academy Space Requirements To be located at First Floor of Multi-purpose building Classroom  Classroom to be fitted with white boards, projectors and screen  classrooms shall fit for 250 students  classroom dedicated for 20 desktop computers  Provide toilets for male and female Multi- Purpose Hall To be located at Second Floor of Multi-purpose building 3.08 Function Rooms     4.00 Outdoor Facilities Transport waiting area, pick-up and drop off 3.07 4.01 4.02 Outdoor covered BBQ area 4.03 Mini soccer area Multi-sport court (Volleyball / Basketball) 4.04 4.05 4.06 5.00 5.01 Ablution block Landscape Parking Areas Staff coach / bus shelter drop off No.(s) Area (m2) 50 m2 Refer to sample mater plan for location With slide and fold partition Shall be use for medical check-up For staff Banquet training purpose Provide toilets for male and female  Security fence and entry gates to control access sheltered entries and drop-off shall be part of the design  Separate service vehicles access shall be provided  Provide 4X Park Pro Double Cabinet BBQ or similar and approved 36 m2 1 836 m2 22m X 38m  To comply local code  To be designed as varied, contrasting spaces with adequate shade, seating areas, pergolas & various zone for gathering and relaxation Work with the standard coach dimensions of 29 seater coach 5.02 Staff coach parking 3.25m X 12.00m 13 5.03 Car Parking Motor bike parking 2.5m X 5.00m 20 5.04 Remarks Refer to sample mater plan for location  Provide covered motor bike parking m2 per slot 700 8 / 12 DESIGN BRIEF & ACCOMMODATION SCHEDULE SUMMARY HOIANA STAFF VILLAGE REV 24 November 2017 Area No 6.00 6.01 Room Name Support Areas Entry to Village 6.02 CCTV 6.03 Security and fencing Covered Pathways 6.04 6.05 Delivery and removal areas 6.06 Laundry and link drying space 6.07 Cleaning and Storage Space Requirements  To have its own sense of arrival with covered entry and gate to reflect a hotel environment  Surveillance are to be provided at Entrance Lobby, every Lift lobby and every corridor along the block apartment only No.(s) Area (m2) Remarks  To security specification  Provide covered walkways between blocks and pick-up points/ parking  A proper area shall be set up to receive supplies as well as remove garbage from the residences  The area shall be sheltered from the weather and located away from the entrance to the residences  The garbage storage and removal area shall be set up to prevent the spread of bugs and rats  Washers and dryers  Stainless steel sinks  Counter area for folding and power points for ironing  To comply with code and intended number of users  Provide laundry space for every block  Provide pantry and storage for every level of block apartment  Storage is sufficient to store mattresses and cleaning tools Refer to attached drawings as an example All areas to be reconfirmed by Kitchen Consultant 1 72 m2 15 All areas to be reconfirmed by Kitchen Consultant 9 / 12 DESIGN BRIEF & ACCOMMODATION SCHEDULE SUMMARY HOIANA STAFF VILLAGE REV 24 November 2017 STAFF VILLAGE MATRIX PER TOWER BLOCK Bedroom Apt Bedroom Apt Bedroom Apt person share people share people share Level 0 16 Level 0 16 Level 0 16 Level 0 16 Level 0 16 Level 0 16 Level 0 16 Level 0 16 Level 0 16 Level 10 0 16 Level 11 16 Level 12 24 0 No of Apartment 24 16 160 No of Staff per Apartment Subtotal No of staff 24 32 640 Twin Tower (Block 1) Total number of staff per block 696 10 / 12 ACCOMODATION SCHEDULE SUMMARY HOIANA STAFF VILLAGE 24 November 2017 REV.3 Stage 40meters Stage Sunrise Outdoor Sports Block - 12 Storey Apt Outdoor Sports Block - 12 Storey Apt Block - 12 Storey Apt Administration Building Trace of Extended kitchen/ Dining line Storey Multi-Purpose Classrooms Kitchen & Dining Drop- off area Entry / Exit 700 slots Motorbike Parking 20 Car Parking 50 meters set back from STP Car Parking 13 - Coach Parking TK 02 TK 01 Sunset STP R03 TK 12 B TK 03 TK 14 12 A TK TK 13 A B 04 F5 NO RT HE 10 TK AN KS TK &B 09 B UIL DIN TK GS 11 FO TK 09 A EX PA NS IO TK 08 R04 R05 TK 07 B 0% CA PA CIT TK Y 07 A TK TK 06 A TK A TK 13 05 06 TK TIM 15 ES AT ED LA ND FO RT Staff Village (Building Orientation / Requirements Example) 35 Hoi An South Development, Vietnam Phase Package 7, Staff Village Design-and-Build Contract, Technical Specification for MEP Installations miscellaneous installations These Works shall be fully commissioned, tested and handed over in running order and shall include, inter alias, the following, together with all necessary ancillary equipment This Sub-Contractor shall coordinate for all necessary equipment handling-over, taking delivery, and storage This Sub-contractor shall be responsible for all the installation, testing and commissioning to the complete satisfaction of CLIENT / ENGINEER Design, supply and installation, testing and commission of complete Main Entrance Intercom Access Control System The System shall include key pads, security controllers, electronic locks, door leaf to door frame connectors, magnetic door contacts, door release buttons, intercom equipment, control panels, power supply units, metallic flexible conduits, patch cords and cables, and other miscellaneous installations as described below These Works shall be fully commissioned, tested and handed over in running order and shall include, inter alias, the following, together with all necessary ancillary equipment All conduits on the non-secured side shall be concealed type This Sub-Contractor shall coordinate for all necessary equipment handling-over, taking delivery, and storage This Sub-contractor shall be responsible for all the installation, testing and commissioning to the complete satisfaction of CLIENT / ENGINEER Design, supply and installation, testing and commission of complete Surveillance System The System shall include various type (fixed, pan/tilt/zoom, dome) CCTV cameras completed with mounting brackets (ceiling, wall, pole), cameras lens, patch cords, control cable, power supply units, LCD CCTV monitors, surveillance control consoles, Surveillance Network Switches, Network Management Software and flexible conduits for protecting patch cords All Video Management Software, video encoders/ decoders, NVR, LED screens, operator’s central control workstations, VMS server, Central Storage and the associated software and licenses, as required for the completion of the installation, shall be supplied and installed by this Sub-Contractor The cameras shall be installed for monitoring all hallways, corridors and lift lobbies The Sub-Contractor shall coordinate with Owner’s IT and Security Operators/Consultants to finalize the system requirements This Sub-Contractor shall coordinate for all necessary equipment handling-over, taking delivery, and storage This Sub-contractor shall be responsible for all the installation, testing and commissioning to the complete satisfaction of the CLIENT / ENGINEER Design, supply and installation, testing and commission of complete telephone sets for offices Furthermore, telephone sets shall be provided on each level of the apartment for emergency purpose (i.e to call the reception, maintenance or emergency numbers) These Works shall be fully commissioned, tested and handed over in running order and shall include, inter alias, the following, together with all necessary ancillary equipment This Sub-Contractor shall coordinate for all necessary equipment handling-over, taking delivery, and storage This Sub-contractor shall be responsible for all the installation, testing and commissioning to the complete satisfaction of CLIENT / ENGINEER Design, supply and installation of Radio Communication System The Systems shall include DMR Repeater, Master Unit, Remote Unit, Amplifiers, Handsets, Splitters, Record Stations, Dispatch Console, Playback Console, Maintenance and Management Terminal, PARSONS BRINCKERHOFF (ASIA) LTD PAGE 34/SECTION 1** November 2017 Hoi An South Development, Vietnam Phase Package 7, Staff Village Design-and-Build Contract, Technical Specification for MEP Installations Management Software, connectivity to Local Authority, RF switches, cables and other miscellaneous installations as described below These Works shall be fully commissioned, tested and handed over in running order and shall include, inter alias, the following, together with all necessary ancillary equipment This Sub-Contractor shall coordinate for all necessary equipment handling-over, taking delivery, and storage This Sub-contractor shall be responsible for all the installation, testing and commissioning to the complete satisfaction of CLIENT / ENGINEER Design, supply and installation of Common Antenna System for Radio Communication System The Systems shall include all types of indoor and outdoor antennas, coaxial cables, splitters, couplers, Point-of-Interfaces, patching cables and other miscellaneous installations as described below These Works shall be fully commissioned, tested and handed over in running order and shall include, inter alias, the following, together with all necessary ancillary equipment This Sub-Contractor shall coordinate for all necessary equipment handling-over, taking delivery, and storage This Sub-contractor shall be responsible for all the installation, testing and commissioning to the complete satisfaction of CLIENT / ENGINEER Design, supply and installation of WiFi System The WIFI system coverage shall be required for all units of the apartment, public areas and offices The Systems shall include all types of indoor and outdoor WiFi Access Point, WiFi Controller, Firewall, patching cables and other miscellaneous installations as described below These Works shall be fully commissioned, tested and handed over in running order and shall include, inter alias, the following, together with all necessary ancillary equipment This Sub-Contractor shall coordinate for all necessary equipment handling-over, taking delivery, and storage This Sub-contractor shall be responsible for all the installation, testing and commissioning to the complete satisfaction of CLIENT / ENGINEER Design, supply and installation, testing and commission of complete IPTV System with Cable TV The IPTV System with Cable TV and equipment shall include satellite TV dish antenna for reception of satellite TV signals, satellite receivers, feed horn, low noise block converter, modulators with channel amplifier, digital/analogue set-top-boxes, encoders, decoders, multiplexers, IP QAMs, broadband fiber optics transmitters and receivers, UHF & AM/FM antenna, splitters, power supply unit, and other miscellaneous installations areas as described below Cable TV shall be provided for all units These Works shall be fully commissioned, tested and handed over in running order and shall include, inter alias, the following, together with all necessary ancillary equipment This Sub-Contractor shall coordinate for all necessary equipment handling-over, taking delivery, and storage This Sub-contractor shall be responsible for all the installation, testing and commissioning to the complete satisfaction of CLIENT / ENGINEER 10 Design, supply and installation of Smart Meter System (for control and monitoring of air conditioner, electricity (lighting and power supply) and washing machine/dryer) with Smart ID Cards The Smart Meter System shall be required for all units of the apartment, and laundry area The System shall include Energy Controllers in connection with the airconditioners inside each units of the apartments and all the washing machines/dryers in PARSONS BRINCKERHOFF (ASIA) LTD PAGE 35/SECTION 1** November 2017 Hoi An South Development, Vietnam Phase Package 7, Staff Village Design-and-Build Contract, Technical Specification for MEP Installations the laundry area, Credit Loading Devices (CLD) with card readers in the indoor common area of the Staff Village, Central Management Server (CMS) with management software installed, network connection cables between the Energy Controllers, the Credit Loading Devices and the Network Switch, and other miscellaneous items essential for the system The Energy Controllers shall support remote credit loading from the Credit Loading Devices through Ethernet connection Internal credits can be loaded to the Energy Controllers of dedicated air-conditioners, power supplies or washing machines/dryers by making payments with Smart ID Cards via the corresponding Credit Loading Devices The card readers shall be compatible to read the Smart ID Cards This Sub-contractor shall furnish all software and Smart ID Cards (minimum Smart ID Cards per unit) necessary for the operation of this System The software install in the Central Management Server shall allow operators to manage transaction logs, adjust the unit charges per wash or per power supply / air-condition operation period, etc This Sub-Contractor shall be responsible for all necessary interfacing with the air-conditioners, electricity/lighting/power supply systems, washing machines/dryers, and all meters and provisions required for the complete functioning of the Smart Meter System These Works shall be fully commissioned, tested and handed over in running order and shall include, inter alias, the following, together with all necessary ancillary equipment This Sub-Contractor shall coordinate for all necessary equipment handling-over, taking delivery, and storage This Sub-contractor shall be responsible for all the installation, testing and commissioning to the complete satisfaction of CLIENT / ENGINEER 11 Primary cable containment system (i.e main metal cable trunking) will generally be provided under the corresponding Electrical Contractor for field wirings from the ELV rooms to the corresponding plant rooms Other than the primary cable containment system, this Contractor shall provide all cable containment systems for the System This Contractor shall be required to provide his own cable containment systems, to the complete satisfaction and acceptance of the Architect / Main Contractor / Engineer, as and when required 12 The Contractor shall provide all conduit system, conduit outlet boxes, conduit junction boxes and accessories from the main metal trunking cable containment system (by the corresponding Electrical portion contractor) to all equipment 13 The Contractor shall be responsible for ensuring that the final installation is in full compliance with all requirements and regulations of relevant Government Authority The Contractor shall also be responsible for obtaining all necessary permits, etc where applicable 14 The Contractor shall make good all damage and penetrations to walls, floor tiles, raise floors, ceilings and finishes incurred during the process of installing the Systems 15 The Works shall also fully comply with all statutory ordinances, regulations, standards, and codes of practice, circular letters relevant to the ELV installation together with any amendments made thereto as required by the relevant Authorities for the safe and proper operation of the Works 16 Provide all conduit systems for final cable connections of ELV System interfaces, the work PARSONS BRINCKERHOFF (ASIA) LTD PAGE 36/SECTION 1** November 2017 Hoi An South Development, Vietnam Phase Package 7, Staff Village Design-and-Build Contract, Technical Specification for MEP Installations shall include all ground continuity connection works between metal trunking and the conduit systems 17 PVC conduits shall be provided unless GI conduits are required by the relevant Authorities, Government Departments, regulations, fire codes or otherwise specified in this Specification 18 The Contractor shall provide all necessary wirings and necessary cable containment, concealed conduits, trunkings, and accessories 19 The Contractor shall provide power supply to all system equipment from the ELV distribution boards/power outlets 20 All patch cord color shall be easily distinguished from other system and shall be approved by CLIENT / ENGINEER This Contractor shall liaise and coordinate with the Structured Cabling System Sub-Contractor for cable colour 21 All network equipment shall be approved by CLIENT / ENGINEER and coordinate with Client IT Department prior to manufacturing and installation 22 Mock up for any part of the installation as required by the Employer’s Representatives / Architect / Engineer 23 Provision of all software licenses for all software packages used in the System and free update of all software to the latest service and maintenance patches for the project during DLP shall be supplied and installed by the Contractor 24 Factory mock-up of the installation, with the corresponding Sub-Contractors for the door manufacturing of each type of door completed with all devices of the System Complete mock up installation report shall be submitted to CLIENT / ENGINEER for record and approval 25 All electrical installations shall be provided and installed in accordance with Local Electrical Requirements 26 Remove all temporary protection from the installed services, equipment and materials and proceed with all necessary reconditioning Take ownership of Client Supplied Equipment / Materials and to proceed with all necessary reconditioning; schedule of equipment to be handover 27 Testing, commissioning and set to work all installations and works provided by this Contract Provide attendance for interface items 28 Pre-installation mock up and demonstration of workmanship for approval before mass installation begins 29 Coordinate with the builder’s / Main Contractor, the internal Sub-Contractors and the Direct and /or Specialist Contractors to provide the coordinated engineering inputs in the production of co-ordinated Combined Services Installation Drawings (CSIDs) and Combined Builder’s Works Drawings (CBWDs) This Sub-contractor is responsible for providing drawing prints and obtaining approval of the CSIDs and CBWDs before actual commencement of works The submission and approval process should pace with the overall construction programme 30 Endeavor to maintain the effective and satisfactory coordination with the Main Contractor and other Sub-Contractors in respect of works scheduling and progress PARSONS BRINCKERHOFF (ASIA) LTD PAGE 37/SECTION 1** November 2017 Hoi An South Development, Vietnam Phase Package 7, Staff Village Design-and-Build Contract, Technical Specification for MEP Installations 31 Design, supply and install temporary hoisting/scaffolding and working platforms if those provided on site by the builder’s / Main Contractor are not suitable for the particular purpose 32 Provide submission schedules for drawings, samples, materials, design calculation, method statements, factory visit, FAT, SAT, material delivery and T&C procedures 33 Demonstrations and documentation as required by the Local Authorities and the third party inspector, as commissioned by the Employer to achieve the required Occupation Permit(s) 34 Submission of working and as-fitted drawings with CD-ROM under this contract 35 Provide design drawings, calculation, programme, samples, shop drawings and equipment/ material submissions 36 Coordination with other contractors, consultants and client’s representatives 37 Free maintenance of the installations under this Contract Works during the Defects Liability Period 38 Supply and delivery of spares and special tools to any designated location in Vietnam as advised by the Architect / engineer 39 The Works shall also fully comply with all statutory ordinances, regulations, standards etc, relevant to the above installation and systems together with any amendments made thereto as required by the relevant government authorities for the safe and proper operation of the Works This Contractor shall prepare and proceed for all submissions and allow for all costs relating to all statutory inspections and certificates and for sectional completion as appropriate and as necessary 40 Attend and coordinate for interfacing with the BMS Sub-Contractor as necessary to complete the works 41 Testing, commissioning and set to work all installations and works 42 Pre-installation mock up and demonstration of workmanship for approval before mass installation 43 Endeavor to maintain the effective and satisfactory coordination with the Main Contractor and other Sub-Contractors in respect of works scheduling and progress 44 Design, supply and installation of all provision for interfacing with other Sub-Contracts 45 Provide maintenance service for authority re-inspection after practical completion 46 Provide training to the Employer’s operation staff 47 Provide 24-month free comprehensive maintenance service after practical completion 1.8.6 Vertical Transportation System Design, supply and installation of passenger lifts and firemen lifts The speed and capacity should be subject to the submission of calculation and justification for Client / Engineer to endorse prior commencement of equipment purchase / works Each apartment block should be with to nos of passenger lift Firemen lift provisions should comply with codes requirements and minimum per each PARSONS BRINCKERHOFF (ASIA) LTD PAGE 38/SECTION 1** November 2017 Hoi An South Development, Vietnam Phase Package 7, Staff Village Design-and-Build Contract, Technical Specification for MEP Installations tower, can be integrated with the passenger lift if layout design able to so The Lift supervisory panel can indicate the status and position of each lift and allow manual override control and inter-com function All provisions and installation should comply with Vietnam regulations and international standard on safety level Passenger Lift car should be with interior design and subject to the endorsement from Client / Architect / engineer Lift control should be reserved with card reader, exact control strategy subject to the endorsement of client / architect The lift installation should be including all necessary intermediate structural / support beams and building and all necessary accessories elements to complete entire installations PARSONS BRINCKERHOFF (ASIA) LTD PAGE 39/SECTION 1** November 2017 Hoi An South Development, Vietnam Phase Package 7, Staff Village Design-and-Build Contract, Technical Specification for MEP Installations APPENDIX - MEP provisions and Design Criteria MEP Provisions for Staff Village Provisions Electrical Installations Transformer 2x 2,000 KVA Tx (Installations by others) Emergency Gen-set x 800 KVA (Installations by others) To support 1) FSI 2) Plumbing / drainage sump pumps 3) Lift (Firemen + P-lift Homing) 4) Essential lightings 5) ELV and security systems About 25% kitchen load for essential equipment Requirements: x 2,500A ACB (by others) in 22kV switch Rooms for connection to Staff Village x 500A MCCB (by others) in 22kV switch Rooms for connection to Staff Village to support FSI x 500A MCCB (by others) in 22kV switch Rooms for connection to Staff Village to support non FSI OPTION: Design supply and install generator and the entire emergency power supply system within the site area and completed with fuel storage / supply and necessary accessories The fuel storage should be capable for minimum 8-huor Fire mode operation Power Supply for the Flat Units 40 A, 1-Pahse MCB (for base tender design : flat without A/C units in living area of flats) 63 A, 1-Phase MCB (Optional design for flats with A/C units on living area and bedrooms) Individual elect meter at EL rooms PARSONS BRINCKERHOFF (ASIA) LTD PAGE 40/SECTION 1** For elect water heater & elect induction cookers Living area 2x Twin S/O 1x lighting point + 1-way switch Door bell DP switch for A/C unit Dining area 1x Twin S/O 1x lighting point + 1-way switch DP switch for A/C unit Kitchen area 2x Twin S/O 2x lighting point + 1-way switch DP switch for ventilation fan 1x fused connection for kitchen cabinet DP switch for water heater + Switched fuse connection unit 1x 13A S/O for refrigerator 1x 13A S/O for hood November 2017 Hoi An South Development, Vietnam Phase Package 7, Staff Village Design-and-Build Contract, Technical Specification for MEP Installations MEP Provisions for Staff Village Provisions Requirements: 1x 13A S/O for range 1x 13A S/O for cooker 1x 13A S/O for oven Bathroom 2x S/O 2x lighting point + 1-way 2-gang lighting switch DP switch for ventilation fan + connection unit DP switch for water heater + Switched fuse connection unit Foyer 1x lighting point + 1-way switch Corridor 1x lighting point + 1-way switch Balcony 1x lighting point + 1-way switch Bedroom 1x Twin S/O 1x lighting point + 1-way switch DP switch for A/C unit Power supply and necessary security control / smart card system to laundry under apartment blocks Laundry requirements refer to the attached schedule MVAC Installation No central A/C system but ventilation Flat Units Base Tender design should be in natural ventilation (without A/C in living area of flat but with A/C in bedrooms) Optional design: Air-conditioning for living area and bedrooms of all flats Individual DX AC units for each flat - Single split type - Multiple split type Design indoor temperature 24oC Public Lift Lobby Ventilation: Individual exhaust air fan for each toilet / shower cubical to external Split type unit AC system x Indoor units provided for each lift lobby Design indoor temperature 25oC PARSONS BRINCKERHOFF (ASIA) LTD PAGE 41/SECTION 1** Bedroom Hp indoor unit

Ngày đăng: 05/11/2019, 11:39

w