1. Trang chủ
  2. » Giáo Dục - Đào Tạo

SV PTA no 1 20171110

109 43 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Cấu trúc

  • 1. Cover

  • 2.1 Content

  • 3. Fly Sheet_Section 2

  • 4. Staff Village Area Program and Requirements REV 9Nov2017

  • 5. Fly Sheet

  • Staff Village Sample MP Revision 2 11.8.2017

    • Sheets and Views

      • Layout1

  • 1 Bedroom Rev2_1Pax 11.8.2017

  • 2 Bedroom Rev2_ 2Pax 11.8.2017

  • 2 Bedroom Rev2_4Pax 11.8.2017

  • Multi Purpose Bldg 1st Floor

  • Multi Purpose Bldg 2nd Floor

  • Multi Purpose Bldg Ground Floor

  • 6. Fly Sheet_mep

  • EL Utility Lead-in Plan (Staff Village)

  • ELV Utility Lead-in Plan (Staff Village)

  • 7. Fly Sheet_COM

  • Appendix_PTA1

  • Particular Conditions_PTA1

  • 8. Fly Sheet_Bill

  • Revised pricing proposal form_171110

Nội dung

HOI AN SOUTH DEVELOPMENT PROJECT PHASE DUY HAI COMMUNE - DUY XUYEN DISTRICT QUANG NAM PROVINCE STAFF VILLAGE CONTRACT POST TENDER ADDENDUM NO.1 EMPLOYER EXECUTIVE ARCHITECT HOI AN SOUTH DEVELOPMENT LIMITED Tay Son Tay Hamlet, Duy Hai Commune Duy Xuyen District, Quang Nam Province Vietnam WONG & OUYANG (HK) LTD 27/F, Dorset House, Taikoo place 979 King’s Road Hong Kong ARCHITECT DESIGN MECHANICAL & ELECTRICAL ENGINEER WATG SINGAPORE INC Commonwealth Ln., #02-03 Singapore 149555 PARSONS BRINCKERHOFF (ASIA) LTD 7F One Kowloon, Wang Yuen Street Kowloon Bay, Kowloon Hong Kong STRUCTURAL ENGINEER QUANTITY SURVEYOR P&T CONSULTANTS (VIETNAM) CO.LTD 4/F Dinh Le Building, 01 Dinh Le Street, Ward 12, District 4, Ho Chi Minh City Vietnam WT PARTNERSHIP (VIETNAM) LTD TMS Building, Level 3, Unit 301 172 Hai Ba Trung Street, Dakao Ward District 1, HCM City Vietnam FAÇADE CONSULTANT CIVIL ENGINEER INHABIT GROUP (HK) 2/F Shen Kwong, Commercial Building 8, Des Voeux Road West Hong Kong ARUP (HK) LTD Level Festival Walk 80 Tat Chee Avenue, Kowloon Tong Kowloon Hong Kong NOVEMBER 2017 HOI AN SOUTH DEVELOPMENT PHASE STAFF VILLAGE CONTRACT POST TENDER ADDENDUM NO.1 CONTENT Item Tender Documents To Refer Description Total page Volume - Section (2.3.1) Architectural Design Brief & Specifications 20 pages Volume - Section (2.3.5) MEP Design Brief & Specifications pages Volume - Section (3.1.i) Appendix to Tender pages Volume - Section (3.1.ii) Particular Conditions of Contract 15 pages Volume - Section Appendix - Tender pricing proposal form 61 pages Volume - Section Environmental Impact Assessment 322 pages Total 424 pages SECTION (2.3.1) ARCHITECTUAL DESIGN BRIEF & SPECIFICATIONS HOIANA STAFF VILLAGE Design Brief and Area Program November 2017 DESIGN BRIEF & ACCOMMODATION SCHEDULE SUMMARY HOIANA STAFF VILLAGE November 2017 REV G DESIGN BRIEF INTRODUCTION Project Information Hoi An South Development Limited is located at Duy Hai Commune, Duy Xuyen District, Quang Nam Province The project is a mixed use, tourism oriented resort, featuring hotels, casino, entertainment & residential offerings The development will also provide Staff housing, this is to be called the “Staff Village” Scope of Works The scope of works is to Design and Build the Staff Village to the following design brief, area schedules and relevant design standards PLANNING CONCEPTS Building Orientation  Orientation of buildings should limit east & west exposure to doors & windows  General planning concepts should align with tropical planning recommendations  The design should allow for the optimum use of natural ventilation in accordance with the above principles This is to reduce the need for extended use of air conditioning, although a/c will be provided  Building layout to be blocks lifts serving each block, so lifts in total  Kitchen for each unit: simple table top, cupboard, fridge, sink, power points  Kitchen appliances are not included under D&B tender and to be confirmed at a later stage (Portable electric cooker stoves, kettles, etc.)  Common facilities can be positioned at ground floor as podium  Separate building for training facilities + multi-purpose hall Room Configuration  Room designs should be modular, see attached study example attached for information only Design Aesthetics Aesthetics should be simple, neutral, practical, light, bright and airy External finishes & faỗade treatment:        Walls to be either painted render or robust cladding panels or a combination of the two Door & window frames to be in pre-finished PVDF coated aluminium All flashings, drips, louvres & other features to match above Glass to be heat strengthened / single glazed systems Door & window systems to be side-hung, top-hung, sliding, or as appropriate Shading devices / canopies & similar to be in pre-finished PVDF coated aluminium sheeting Fascia to be rigid pre-formed simple profile pre-finished PVDF coated aluminium / 10 DESIGN BRIEF & ACCOMMODATION SCHEDULE SUMMARY HOIANA STAFF VILLAGE November 2017      REV G Eaves to be sealed with pre-finished PVDF coated aluminium with insect screens over ventilation slots Balustrades to be galvanized steel and painted Handrails to be galvanized steel and painted Any other elements related to the faỗade to be non-corrosive All terraced areas to be finished in non-slip tiled finish to fall Landscape            Simple contrasting local soft landscapes & shade trees Simple seating walls & raised timber deck areas forming interesting rest areas with varied forms at different levels Rest areas should have some planted pergola structures for shade & some roofed areas for rain days Ground levels should be varied to create berms / grass banks where people can relax on the ground & under trees – these could be sculptural & simple bold forms for groups to gather and picnic, rest, etc Tropical landscape design easy to source locally and adoptable to site environment All blocks are to be link by shaded walkways Planted pergola structure can be also integrated and timber seating areas along the landscape Plant species shall be locally source to be adoptable to local environment Provide water tap for landscape maintenance and irrigation Walkways requires lighting along pavements etc and consider landscape lighting by spotting trees only Along the main entrance requires tall trees to screen from WTP and Laundry Facilities Additional information refers to Landscape Performance Specification ALL SERVICES and Facilities Refer to standard specifications attached  Signage design to be by our signage consultant, D&B contractor will construct & install  Loose furniture: D&B contractor to provide as optional items  No refuse chute in this staff housing, instead there will be refuse collection rooms  Coffee shop, Mini mart, kitchen for dining area: bare shell, to be outsourced / tbc  Laundry area: simple finishing, operation & machines to be outsourced – MEP team to check with laundry consultant  Motorbike parking: house up to 500 bikes – can be adjusted later MEP provisions:  Please see attached correspondences from MEP team & PBA  Meters are provided for each unit to control their utility usage (mostly aircon)  Surveillance: provided only at ground floor, entrance lobby  Simple traffic control system AREAS OF SPECIAL INTEREST / 10 DESIGN BRIEF & ACCOMMODATION SCHEDULE SUMMARY HOIANA STAFF VILLAGE November 2017       REV G All areas should allow for natural cooling & air flow, fans should be considered and options/ suggestions provided Power saving measures should be included to reduce power consumption while apartments are not occupied All detailing should provide good weather tightness at all junctions Limited timber should be utilized as a finish Terrace door opening options should be provided to achieve best weather tightness Provisions to limit condensation should be considered as integral to the design proposal SECURITY Refer to attached design standards INTERNAL MATERIALS & FINISHES    All materials to be robust, low maintenance, non-corrosive (exposed coastal location) Openings should be protected in terms of sun penetration & solar gain See NWHDS & technical specification attached EXTERNAL MATERIALS & FINISHES   All materials to be robust, low maintenance, non-corrosive (exposed coastal location) See NWHDS & technical specification attached REFERENCE DESIGN TOOLS THAT MAY BE UTILIZED AND SHOULD BE CONSIDERED       North - south building orientation (or as close as possible) Open stairs and landings for increased ventilation opportunities Deep eaves for shading Large openings for good ventilation Louvre – window configurations, closeable in bad weather and when a/c activated Ventilated roof space to reduce thermal – heat gain on upper floors / 10 DESIGN BRIEF & ACCOMMODATION SCHEDULE SUMMARY HOIANA STAFF VILLAGE November 2017 REV G VENTILATION MAXIMISED WHERE POSIBLE ROOF SPACE VENTILATION MAXIMISED / 10 DESIGN BRIEF & ACCOMMODATION SCHEDULE SUMMARY HOIANA STAFF VILLAGE REV G November 2017 Area No 1.00 1.01 Room Name Staff Rooms Bedroom Apartment (4 Pax) Space Requirements No.(s) Area (m2) Remarks  Personal wardrobe for clothes and belongings  Secure storage drawers  Study/ writing table  Mirror for grooming  Attached full bathroom  Power points  Rubbish bin location  Living room  Kitchen and dining area  Balcony with screen for AC outdoor units 320 57.2 m2  Kitchen equipment for every unit apartment are treated as loose home appliances Contractor shall allow cost for delivery, receiving, storage and installation  Refer to Staff Village Matrix  Kitchen equipment for every unit apartment are treated as loose home appliances Contractor shall allow cost for delivery, receiving, storage and installation  Refer to Staff Village Matrix  Kitchen equipment for every unit apartment are treated as loose home appliances Contractor shall allow cost for delivery, receiving, storage and installation  Refer to Staff Village Matrix 1.02 Bedroom Apartment (2 Pax)  Personal wardrobe for clothes and belongings  Secure storage drawers  Study/ writing table  Mirror for grooming  Attached full bathroom  Power points  Rubbish bin location  Living room  Kitchen and dining area  Balcony with screen for AC outdoor units 32 57.2 m2 1.03 Bedroom Apartment (1 Pax)  Personal wardrobe for clothes and belongings  Secure storage drawers  Study/ writing table  Mirror for grooming  Attached full bathroom  Power points  Rubbish bin location  Living room  Kitchen and dining area  Balcony with screen for AC outdoor units 48 37.96 m2 / 10 DESIGN BRIEF & ACCOMMODATION SCHEDULE SUMMARY HOIANA STAFF VILLAGE REV G November 2017 Area No 2.00 2.01 Room Name Administration Office Admin/ Manager support personnel 2.02 Lobby, reception and security 2.03 Staff Academy Office 2.04 Recreation room 2.05 Gym 2.06 Mini mart / Convenience store Hair, beauty salon and SPA Coffee shop / staff bar 2.07 2.08 2.09 Online gaming area (internet café) Space Requirements No.(s) Area (m2) Remarks  The administrative office shall house the Staff Village manager and support personnel  An open plan office area together with one enclosed office shall be provided  The office shall be easily accessible and close to the reception area  A reception counter shall be set up at the entry lobby  The counter shall also double as the security counter to control and monitor access  The reception and security could be combined with the administrative office with a window into the entry foyer  Provide lounge for waiting area 20 m2 Total area including office + open plan Area to be proportion with the number of occupants     Provide open office for staff Stationary storage Pantry Indoor recreational area for billiards, table tennis, board games and TV Treadmills Exercise bicycles Free weight set Bench press multi-use machine Bare shell finished – operation to be outsource  Bare shell finished – operation to be outsource  Cold room facilities  Bar Fridges  Tables and chairs for 100 Pax  Pantry  Wash area  Long desk with separate booths (outsourced)       175 m2 65 m2 75 m2 20 m2 120m2 To be in one building only 30 m2 / 10 SCHEDULE NO.2.3A FUNCTION BUILDING CONSTRUCTION WORKS No Description Unit Qty Unit rate (VND) Material Labour Amount (VND) Builder's Works (Cont'd) Kitchen appliances A Sink basin + tap No B Cooktop No Built-in Cabinet C MDF lower kitchen cabinet including local granite stone benchtop m D MDF upper kitchen cabinet m E MDF wardrobes m F Shoe cabinet No Reception counter (specify details such as size, material, etc.) no Lavatory counter top Install FF&E and Gym equipment no G Receive and install FF&E including Loose furniture in apartment units, admin building & outdoor furniture, kitchen appliances for apartment units (fridge, electrical stoves, kettles, etc.), drapery (blackout curtains for windows) item H Receive and install Gym equipment including benches, leg machines, arm machines, back machines, chest and shoulder machines, cable machines, running machines, etc and accessories item Additional Items for Builder's Works Others filled by the Tenderer if necessary: To COLLECTION of Schedule No 2.3A Schedule No.2.3a /8 - SCHEDULE NO.2.3A FUNCTION BUILDING CONSTRUCTION WORKS No Description Unit Qty Unit rate (VND) Material Labour Amount (VND) COLLECTION From Page Schedule No 2.3A / - From Page Schedule No 2.3A / - From Page Schedule No 2.3A / - From Page Schedule No 2.3A / - From Page Schedule No 2.3A / - From Page Schedule No 2.3A / From Page Schedule No 2.3A / From Page Schedule No 2.3A / Carried to MAIN SUMMARY Schedule No.2.3a /9 - SCHEDULE NO.2.3B FUNCTION BUILDING MEP WORKS No Description Unit Qty Unit rate (VND) Material Labour Amount (VND) SCHEDULE NO.2.3B FUNCTION BUILDING MEP WORKS Generally A The Tenderer is referred to Tenderer's proposal of specifications, material list and drawings for all details related to this section of the works and he is to include for complying with all the requirements contained therein, whether or not they are specifically mentioned within the items Note B For detailed description of materials and workmanship, refer to relevant section in the Contractor's proposal of Drawings and Specifications Note C All items are intended to be inclusive of necessary labors, plants and fixings, accessories etc to complete as requires Note D Method of measurement of quantities is required following RICS Principles of Measurement (International) for Works of Construction June 1979 (hereafter referred to as the POM) Note E The Bill of Quantities provided by the Employer is for guide only The tenderer has to take of quantities based on his own design and fill/ insert details in according to the structure of Bill of quantities provided Note To COLLECTION of Schedule No 2.3B Schedule No.2.3b/1 - SCHEDULE NO.2.3B FUNCTION BUILDING MEP WORKS No Description Unit Qty Unit rate (VND) Material Labour Amount (VND) MEP SERVICES PLUMBING SYSTEM AND DRAINAGE SERVICES (Tenderer insert detailed items here comprise of cold water system, hot water system, storm water system, soil waste drainage and vent system, sanitaryware and tapware installation) Cold water system (Tenderer insert detailed items here comprise of pump, valves, pipes, fitting and accessories, etc … to complete system) A ……………………………… B ……………………………… C ……………………………… D ……………………………… Hot water system (Tenderer insert detailed items here comprise of pump, valves, pipes, fitting and accessories, etc … to complete system) E ……………………………… F ……………………………… G ……………………………… H ……………………………… Storm water system (Tenderer insert detailed items here comprise of pipes, fitting and accessories, etc …) I ……………………………… J ……………………………… K ……………………………… Soil, waste drainage and vent system (Tenderer insert detailed items here comprise of pipes, fitting and accessories, etc …) L ……………………………… M ……………………………… To COLLECTION of Schedule No 2.3B Schedule No.2.3b/2 - SCHEDULE NO.2.3B FUNCTION BUILDING MEP WORKS No Description Unit Qty Unit rate (VND) Material Labour Amount (VND) PLUMBING SYSTEM AND SANITARY SYSTEM (CONT'D) Sanitaryware and Tapware installation (Tenderer insert detailed items here comprise of pipes, fitting and accessories, etc …) A ……………………………… B ……………………………… C ……………………………… D ……………………………… ELECTRICAL SERVICES (Tenderer insert detailed items here comprise of main and sub-main distribution, lighting and small power, cable containment, lighting protection system, earthing bonding, PABX system, TV and wifi system, etc ) Main and sub-main distribution (Tenderer insert detailed items here comprise of switchboards included busbar & ancillaries, including all necessary fittings, supports, hangers and all necessary accessories as specified to complete system) E ……………………………… F ……………………………… G ……………………………… H ……………………………… Lighting and small power (Tenderer insert detailed items here comprise of lighting fixture, switch, socket outlet; circuits; approved cables; copper conductors; drawing into and including conduits and fittings and/or flexible conduits and fittings or any cable installing facilities as specified; earth continuity conductors, etc to complete system) I ……………………………… J ……………………………… K ……………………………… L ……………………………… To COLLECTION of Schedule No 2.3B Schedule No.2.3b/3 - SCHEDULE NO.2.3B FUNCTION BUILDING MEP WORKS No Description Unit Qty Unit rate (VND) Material Labour Amount (VND) ELECTRICAL SERVICES (CONT'D) Cable containment (Tenderer insert detailed items here comprise of Metal trunkings and fittings; covers; cable supporting facilities; running joints and fixings , etc … to complete system) A ……………………………… B ……………………………… C ……………………………… D ……………………………… Lighting protection system (Tenderer insert detailed items here comprise of lightning terminal including all brackets, clamps accessories, connection, fixed to structure; lightning coaxial cable; supported at approved spacing; including jointing and fixing; lighting earth pit; etc to complete system) E ……………………………… F ……………………………… G ……………………………… H ……………………………… Earthing and Bonding (Tenderer insert detailed items here comprise of equipotential bonding, copper taps, earth copper terminal, earth pit, etc … to complete system) I ……………………………… J ……………………………… K ……………………………… L ……………………………… PABX System (Tenderer insert detailed items here comprise of equipment, including fittings and accessories to complete system) M ……………………………… N ……………………………… To COLLECTION of Schedule No 2.3B Schedule No.2.3b/4 - SCHEDULE NO.2.3B FUNCTION BUILDING MEP WORKS No Description Unit Qty Unit rate (VND) Material Labour Amount (VND) ELECTRICAL SERVICES (CONT'D) TV and wifi system (Tenderer insert detailed items here comprise of equipment, including fittings and accessores to complete system.) A ……………………………… B ……………………………… C ……………………………… HVAC SERVICES (Tenderer insert detailed items here comprise of condensate drain system and refridgretion pipe, mechanical ventilation system, staircase and lobby essurisation system, air conditional system, electrical and control system, etc…) Condensate drain system and Refrigeration piping (Tenderer insert detailed items here comprise of pipes and fittings, jointing, supports and accessores to complete system.) D ……………………………… E ……………………………… F ……………………………… Mechanical ventilation system (Tenderer insert detailed items here comprise of ductworks, thermal insulation, ventilation fans, fittings, jointing, supports and accessores to complete system.) G ……………………………… H ……………………………… I ……………………………… J Staircase and lobby essurisation system (Tenderer insert detailed items here comprise of ductworks, ventilation fans, fittings, jointing, supports and accessores to complete system.) ……………………………… K ……………………………… L ……………………………… To COLLECTION of Schedule No 2.3B Schedule No.2.3b/5 - SCHEDULE NO.2.3B FUNCTION BUILDING MEP WORKS No Description Unit Qty Unit rate (VND) Material Labour Amount (VND) HVAC SERVICES (CONT'D) Air conditioning system (Tenderer insert detailed items here comprise of ductworks, air grilles, thermal insulation, air conditioning equipment , fittings, jointing, supports and accessores to complete system.) A ……………………………… B ……………………………… C ……………………………… D ……………………………… E ……………………………… Electrical and control system (Tenderer insert detailed items here comprise of electrical power and control equipment, cable containment, fittings, jointing, supports and accessores to complete system.) F ……………………………… G ……………………………… H ……………………………… I ……………………………… FIRE SERVICES (Tenderer insert detailed items here comprise of fire hydrant and hosereel system, automatic sprinkler system, automatic fire alarm system, portable equipment, etc ) Fire hydrant and hosereel system (Tenderer insert detailed items here comprise of fire hydrant, pipe, fittins, accessories, etc … to complete system) J ……………………………… K ……………………………… L ……………………………… M ……………………………… N ……………………………… To COLLECTION of Schedule No 2.3B Schedule No.2.3b/6 - SCHEDULE NO.2.3B FUNCTION BUILDING MEP WORKS No Description Unit Qty Unit rate (VND) Material Labour Amount (VND) FIRE SERVICES (CONT'D) Automatic sprinkler system (Tenderer insert detailed items here comprise of pipe, valves and ancillaries, sprinkler head, fittings and accessories to complete system) A ……………………………… B ……………………………… C ……………………………… D ……………………………… Automatic fire alarm system (Tenderer insert detailed items here comprise of equipment and accessories to complete system) E ……………………………… F ……………………………… G ……………………………… H ……………………………… Portable equipment (Tenderer insert detailed items here comprise of portable fire extinguishes, and fixing accessories to complete system) I ……………………………… J ……………………………… K ……………………………… L ……………………………… LIFT (Tenderer inser detailed item here comprise of equipment and fittings, accessories to complete system) M ……………………………… F ……………………………… Additional items: Others filled by the Tenderer if necessary: To COLLECTION of Schedule No 2.3B Schedule No.2.3b/7 - SCHEDULE NO.2.3B FUNCTION BUILDING MEP WORKS No Description Unit Qty Unit rate (VND) Material Labour Amount (VND) COLLECTION From Page Schedule No 2.3B / - From Page Schedule No 2.3B / - From Page Schedule No 2.3B / - From Page Schedule No 2.3B / - From Page Schedule No 2.3B / - From Page Schedule No 2.3B / From Page Schedule No 2.3B / Carried to MAIN SUMMARY Schedule No.2.3b/8 - SCHEDULE NO.3 EXTERNAL WORKS No Description Unit Qty Unit rate (VND) Material Labour Amount (VND) SCHEDULE NO.3 EXTERNAL WORKS Generally A The Tenderer is referred to Tenderer's proposal of specifications, material list and drawings for all details related to this section of the works and he is to include for complying with all the requirements contained therein, whether or not they are specifically mentioned within the items Note B For detailed description of materials and workmanship, refer to relevant section in the Contractor's propsal of Drawings and Specifications Note C All items are intended to be inclusive of necessary labors, plants and fixings, accessories etc to complete as requires Note D Method of measurement of quantties is required following RICS Principles of Measurement (International) for Works of Construction June 1979 (hereafter referred to as the POM) Note Multi-sport court E Leveling site from existing level to meet design level m3 F Sub-grade preparation, compacted K=0.95 m2 G Crushed stone subbase (thicness?) m3 H Concrete M200 to surface (thickness?) m3 J Acrylic surface system to top of concrete slab m2 K Metal work for net and support posts Item L Lighting post No To COLLECTION of Schedule No 2.3 Schedule No.3/1 - SCHEDULE NO.3 EXTERNAL WORKS No Description Unit Qty Unit rate (VND) Material Labour Amount (VND) Parking Areas A m3 B Leveling site from existing level to meet sub-base level as design Sub-grade preparation, compacted K=0.95 C Crushed stone subbase (thicness?) m3 D Concrete M200 to surface (thickness?) m3 E Line marking Item Covered parking area m2 m2 Internal Road and Buggys F Leveling site from existing level to meet sub-base level as design m3 G Sub-grade preparation, compacted K=0.95 m2 H Crushed stone subbase (thicness?) m3 J Concrete M200 to surface (thickness?) m2 K Line marking Item L Concrete kerbs (size?) m Covered walkway m2 N Landscaping Grass including topsoil (specified thickness and type of grass) Planted trees including topsoil and planter walls if any No O Stormwater Drainage Note: Please specified size of pipe/manholes Note M m2 RC pipes P Supply and install of reinforced concrete pipes including excavation, backfill, sand compressing, unreinforced bedding foundation, marker, joints and fittings Q List of Size of pipe R … m To COLLECTION of Schedule No 2.3 Schedule No.3/2 - SCHEDULE NO.3 EXTERNAL WORKS No Description Unit Qty Unit rate (VND) Material Labour Amount (VND) Stormwater Drainage (cont'd) A Reinforced concrete manholes Installation of manhole including excavation, backfill, blinding concrete, concrete , formwork, reinforcement, ladders, and manhole cover B List of Size of manholes No C … No D Etc No E Sewage system Note: Please specified size of pipe/manholes Note RC pipes F Supply and install of reinforced concrete pipes including excavation, backfill, sand compressing, unreinforced bedding foundation, marker, joints and fittings G List of Size of pipe H … m Reinforced concrete manholes J Installation of manhole including excavation, backfill, blinding concrete, concrete , formwork, reinforcement, ladders, and manhole cover K List of Size of manholes No L … No M Etc No Sundries N Irrigation System to landscaping area O Park Pro Double Cabinet BBQ or similar P Security and fencing No Additional Items Others filled by the Tenderer if necessary: To COLLECTION of Schedule No 2.3 Schedule No.3/3 - SCHEDULE NO.3 EXTERNAL WORKS No Description Unit Qty Unit rate (VND) Material Labour Amount (VND) COLLECTION From Page Schedule No 2.3 / - From Page Schedule No 2.3 / - From Page Schedule No 2.3 / - Carried to MAIN SUMMARY Schedule No.3/4 - SCHEDULE NO.4 PROVISIONAL SUM No Description Unit Amount (VND) SCHEDULE NO.4 PROVISIONAL SUM A Supply and deliver FF&E including Loose furniture in apartment units, admin buildings, outdoor furniture, kitchen appliances for apartment units (fridge, electrical stoves, kettles, etc.), drapery (blackout curtains for windows) item 57,500,000,000 B Supply and install Signages including wayfinding, banner, billboards, ect item 8,050,000,000 C Supply and deliver Gym equipment including benches, leg machines, arm machines, back machines, chest and shoulder machines, cable machines, running machines and accessories item 1,000,000,000 Carried to MAIN SUMMARY Schedule No.4/1 - ... people share Level 0 16 Level 0 16 Level 0 16 Level 0 16 Level 0 16 Level 0 16 Level 0 16 Level 0 16 Level 0 16 Level 10 0 16 Level 11 16 Level 12 24 0 No of Apartment 24 16 16 0 No of Staff per Apartment... and address 1. 1.2.4 & 1. 3 TBA Quantity Surveyor 1. 1.2 .11 WT Partnership LLC, Room 3 01- 302, TMS Building, 17 2 Hai Ba Trung, District HCM, Vietnam Time for Completion of the Works 1. 1.3.3 360 days... Exit Coach Parking Coach Parking TK 02 TK 01 Sunset TK 12 STP R03 B TK A 03 TK 14 12 TK TK 13 A B 04 F5 NO 08 TH E 10 TK TA NK S& TK 09 BU B ILD ING TK 11 SF OR TK 09 A EX PA N SIO TK R04 R05 TK

Ngày đăng: 03/11/2019, 19:28

TÀI LIỆU CÙNG NGƯỜI DÙNG

  • Đang cập nhật ...

TÀI LIỆU LIÊN QUAN

w