1. Trang chủ
  2. » Giáo Dục - Đào Tạo

GH maincon boq

160 115 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 160
Dung lượng 3,92 MB

Nội dung

GHOMES APARTMENT PROJECT, HCMC, VIETNAM MAIN CONTRACTOR FOR CONSTRUCTION, FINISHING & MEPF WORK Item Description Page No Total Remark FINAL SUMMARY BILL - PRELIMINARIES BILL - BASEMENT Bill No 2.1: Sub-structure Bill No 2.2: Service Apartment basement MEP work Bill No 2.3: Residential basement MEP work Lump sum BILL - TOWER STRUCTURE AND PUBLIC FINISHING Bill No 3.1: Service Apartment tower Bill No 3.2: Residential tower Provisional sum BILL - TOWER APARTMENT FINISHING Bill No 4.1: Service Apartment tower finishing Bill No 4.2: Residential tower finishing Provisional sum BILL - TOWER MEP WORK Bill No 5.1: Public Service Apartment tower MEP Bill No 5.2: Public Residential tower MEP Bill No 5.3: Apartment MEP (incl SA & Resi.) Bill No 5.4: Infrastructure MEP Provisional sum BILL - EXTERNAL WORK Provisional sum Sub-Total Add : 10% VAT TOTAL AMOUNT (VND) Note: GHOMES APARTMENT PROJECT, HCMC, VIETNAM BILL 1: PRELIMINARIES Item Description DRAWINGS Construction Drawings, shop drawings and co-ordination drawings As built drawings FORM, TYPE AND CONDITIONS OF CONTRACT CONTRACT AND PRICING OF PRELIMINARIES Pricing of preliminaries WARRANTIES & BONDS Insurances Accidents to Contractor's Personnel Contractor's Equipment insurance Marine Cargo and Transit insurance Other Insurances Professional Indemnity Insurance Bank warranties Performance Bond 10 Advance Payment Bond 11 Warranty bond for DLP period CONTRACTOR'S LIABILITY 12 Contractor's acceptance of Site conditions Unit Quantity item 1.00 item 1.00 item 1.00 item item item item item 1.00 1.00 1.00 1.00 1.00 item item item 1.00 1.00 1.00 item 1.00 item 1.00 SUB-CONTRACTORS, SUPPLIER AND OTHERS EMPLOYED ON THE WORKS Installation of Authorities incoming services Contractor's responsibility for all Direct 14 contractor and Nominated suppliers 13 As mentioned in the "Instruction to Tenderers", the Main Contractor has to take responsibility of management on site with Direct Contractor & Nominated Suppliers in term of Safety, Quality and Progress.The Main Contractor shall take full responsibility to get a good quality and timely project The list of Direct Contractors & Supplier as below: Direct Contractor: MV and LV system: Prime cost sum VND 170,000,000,000 VND Attendance fee & overhead profit, added by Main contractor Fire fighting & fire protection system: Prime cost sum VND 60,000,000,000 Attendance fee & overhead profit, added by Main contractor Lift & Elevator: Prime cost sum VND 65,000,000,000 Note Note Note Total Rate (VND) Amount (VND) Remarks GHOMES APARTMENT PROJECT, HCMC, VIETNAM BILL 1: PRELIMINARIES Item 15 Description Attendance fee & overhead profit, added by Main contractor MEP equipment of Swimming pools: Prime cost sum VND 3,500,000,000 Attendance fee & overhead profit, added by Main contractor Aluminium doors, windows, Canopy, Glass Balustrade: Prime cost sum VND 190,000,000,000 Attendance fee & overhead profit, added by Main contractor Logo & Signage: Prime cost sum VND 20,000,000,000 Attendance fee & overhead profit, added by Main contractor ADMINISTRATION OF CONTRACT AND WORKS Contractor's superintendence Resident supervisors and independent inspectors Resident site staff Access for the Employer to the Works Access for inspection and testing Site safety Unit Quantity Note Note Note month 26.00 month 26.00 month item item month item item item item item item item 26.00 1.00 1.00 26.00 item item month item 1.00 1.00 26.00 1.00 item 1.00 item item item 1.00 1.00 1.00 item 1.00 item 1.00 item 1.00 39 Protection of exposed excavated surfaces item 1.00 40 Vector control item 1.00 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 Reporting of Accidents and Incidents Visitors Publicity of the Works Confidentiality of Project Information Meetings Public relations measures Trespassing and acts of nuisance SITE AND WORKS Setting out of the Works Boundary relationship Progress surveys Restrict nuisance of dust and noise Interference with traffic and adjoining properties Extraordinary traffic and special loads Cables/services detection Maintain existing services 36 Response to damages to existing services Maintenance and protection of existing roads, footpaths etc Protecting the Works from inclement 38 weather etc 37 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Total Rate (VND) Amount (VND) Remarks GHOMES APARTMENT PROJECT, HCMC, VIETNAM BILL 1: PRELIMINARIES Item Description 41 Damage and theft 42 Site security 43 Security measures PLANT AND TEMPORARY WORKS 44 Site offices and meeting rooms 45 Temporary access and temporary roads 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 Removal of water and temporary drainage (install, maintance and removal) Shoring and temporary works Signs and advertisements Hoardings, fencing and gates etc Project name board Scaffolding and staging Contractor's temporary offices, stores, workshops etc Temporary water and electrical services Temporary telephone services Temporary fire protection services Temporary lightning protection system Other temporary works Plant tools and vehicles Crane …… Hoist ………… Transformer …… Conc' Placing Boom… Use of explosive powder tools etc Loading in excess of design load COMPLETION Removal of rubbish Leave clean on completion MATERIALS AND WORKMANSHIP Samples Quality Assurance and Quality Control (QAQC) Contract Close-out Project record documents Prototype ANY OTHER ITEMS other equipment & tools BILL NO 1: PRELIMINARIES Unit Quantity item item item 1.00 1.00 1.00 item item 1.00 1.00 item 1.00 item item item item item 1.00 1.00 1.00 1.00 1.00 item 1.00 item item item item item 1.00 1.00 1.00 1.00 1.00 item item item item item item 1.00 1.00 1.00 1.00 1.00 1.00 month month 26.00 3.00 item 1.00 item 1.00 item item item 1.00 1.00 1.00 item 1.00 Total Rate (VND) Amount (VND) Remarks GHOMES APARTMENT PROJECT, HCMC, VIETNAM 2.1 BASEMENT- BUILDING WORKS No Description Quantity Unit SHORING CÔNG TÁC CHỐNG ĐỠ SHEET PILING CÔNG TÁC CỪ LARSEN Levelling & prepare to work San phẳng chuẩn bị mặt thi công Provide, install & remove sheet pile system Cung cấp, lắp dựng, tháo dỡ hệ chống cừ Larsen Shoring system for retaining the excavation work Hệ chống thành hố đào cho công tác đào đất 5,367 m2 316 m lot 5,650 m3 103 m3 23,634 m3 1,424 m3 44 m3 1,103 m3 5,710 m3 23,954 m3 PILLING WORK CÔNG TÁC CỌC EARTHWORK CÔNG TÁC ĐẤT EXCAVATION CÔNG TÁC ĐÀO ĐẤT Excavation starting from top of ground level, including excavating in cement improved soil Đào đất từ cao độ mặt tự nhiên bao gồm đào đất gia cố xi măng For Service Apartment Excavation to hall of basement by machine Đào đất toàn tầng hầm máy Excavation by labor to pilecaps, tie beam, drainage, pit Đào đất thủ công cho đài cọc, dầm tầng hầm, mương thu nước, hố thu For Residential Excavation to hall of basement by machine Đào đất toàn tầng hầm máy Excavation by labor to pilecaps, tie beam, drainage, pit Đào đất thủ công cho đài cọc, dầm tầng hầm, mương thu nước, hố thu BACKFILL CÔNG TÁC LẤP ĐẤT For Service Apartment Backfilling with sand to required compaction density K=0.95 Đắp cát san lấp cho cơng trình máy đầm 9T, độ chặt K=0.95 For Residential Backfilling with sand to required compaction density K=0.95 Đắp cát san lấp cho cơng trình máy đầm 9T, độ chặt K=0.95 DISPOSAL VẬN CHUYỂN ĐỔ ĐI 10 11 For Service Apartment Removal of surplus unsuitable excavated material from Site Vận chuyển đất đào dư thừa khỏi công trường For Residential Removal of surplus unsuitable excavated material from Site Vận chuyển đất đào dư thừa khỏi công trường Supply Material (VND) Labor (VND) Total Rate (VND) Amount (VND) Remark GHOMES APARTMENT PROJECT, HCMC, VIETNAM 2.1 BASEMENT- BUILDING WORKS No Description Quantity Unit TERMITE CONTROL CHỐNG MỐI 12 13 14 15 16 17 18 19 For Service Apartment To basement Cho tầng hầm Bottom of excavations Đáy hố đào Surface of embankment Thành hố đào To pilecaps, tie beam, drainage, pit Cho đài cọc, dầm tầng hầm, mương thu nước, hố thu Bottom of excavations Đáy hố đào Surface of embankment Thành hố đào For Residential To basement Cho tầng hầm Bottom of excavations Đáy hố đào Surface of embankment Thành hố đào To pilecaps, tie beam, drainage, pit Cho đài cọc, dầm tầng hầm, mương thu nước, hố thu Bottom of excavations Đáy hố đào Surface of embankment Thành hố đào 381 m2 719 m2 444 m2 418 m2 2,049 m2 2,001 m2 2,076 m2 2,075 m2 381 m2 444 m2 2,049 m2 2,076 m2 50 m3 30 m3 216 m3 AGGREGATE BASE COURSES LỚP CẤP PHỐI 19 20 21 22 For Service Apartment Under Basement slabs, t=150mm Dưới sàn hầm, dày 150mm Under pilecaps, tie beam, drainage, pit, t=150mm Dưới đài cọc, dầm tầng hầm, mương thu nước, hố thu, dày 150mm For Residential Under Basement slabs, t=150mm Dưới sàn hầm, dày 150mm Under pilecaps, tie beam, drainage, pit, t=150mm Dưới đài cọc, dầm tầng hầm, mương thu nước, hố thu, dày 150mm EXTERIOR IMPROVEMENTS CÔNG TÁC CẢI TẠO LEAN CONCRETE BASE COURSES CƠNG TÁC BÊ TƠNG LĨT 23 24 25 Plain concrete, Grade B12.5, 100mm thk Bê tông tạo phẳng, cấp độ bền 12.5, dày 100mm For Service Apartment Under Basement slabs 100mm thk Dưới sàn hầm Under pilecaps, tie beam, drainage, pit 50mm thk Dưới đài cọc, dầm tầng hầm, mương thu nước, hố thu For Residential Under Basement slabs 100mm thk Dưới sàn hầm Supply Material (VND) Labor (VND) Total Rate (VND) Amount (VND) Remark GHOMES APARTMENT PROJECT, HCMC, VIETNAM 2.1 BASEMENT- BUILDING WORKS No 26 Description Under pilecaps, tie beam, drainage, pit 50mm thk Dưới đài cọc, dầm tầng hầm, mương thu nước, hố thu Quantity Unit 99 m3 30 nos 47 nos 47 nos 47 nos 115 nos 109 nos 109 nos 109 nos 158 m2 349 m2 127 m2 m2 175 m2 342 m2 1,020 m2 318 m2 CUT-OFF & TREATMENT PILE HEADS CÔNG TÁC ĐẬP VÀ XỬ LÝ ĐẦU CỌC 27 28 29 30 31 32 33 34 For Service Apartment Cut-off, treatment and removal pile heads of bored piles out off site Đập, xử lý đầu cọc khoan nhồi vận chuyển khỏi công trường Cut-off, treatment and removal pile heads of spun piles out off site Cắt, xử lý đầu cọc ly tâm vận chuyển khỏi công trường Non-shrink motar concrete grade B30(M400) for spun piles Vữa bê tơng khơng co ngót B30 Round steel plate Ø250 3mm thk for spun piles Thép tròn Ø250 dày 3mm For Residential Cut-off, treatment and removal pile heads of bored piles out off site Đập, xử lý đầu cọc khoan nhồi vận chuyển khỏi công trường Cut-off, treatment and removal pile heads of spun piles out off site Cắt, xử lý đầu cọc ly tâm vận chuyển khỏi công trường Non-shrink motar concrete grade B30(M400) for spun piles Vữa bê tơng khơng co ngót B30 Round steel plate Ø250 3mm thk for spun piles Thép tròn Ø250 dày 3mm CONCRETE CƠNG TÁC BÊ TƠNG CONCRETE FORMING CÔNG TÁC VÁN KHUÔN 35 36 37 38 39 40 41 42 43 For Service Apartment Formwork to: Ván khn cho: Lean Concrete Bê tơng lót Pile caps Đài cọc Basement slab Sàn tầng hầm Drop panel for pile cap Mũ đài cọc Columns Cột Core-shaft wall Vách lõi cứng Retaining Wall Tường chắn đất Water tank Bể nước Water tank wall Tường bể nước Water tank bottom slab Đáy bể nước m2 Supply Material (VND) Labor (VND) Total Rate (VND) Amount (VND) Remark GHOMES APARTMENT PROJECT, HCMC, VIETNAM 2.1 BASEMENT- BUILDING WORKS No 44 45 46 47 48 49 50 51 52 53 54 53 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 Description Water tank top slab Nắp bể nước Domestic water tank beam Dầm bể nước sinh hoạt Fire Water tank Bể nước phòng cháy chữa cháy Fire water tank wall Tường bể nước phòng cháy chữa cháy Fire water tank bottom slab Đáy bể nước phòng cháy chữa cháy Fire water tank top slab Nắp bể nước phòng cháy chữa cháy Fire tank beam Dầm bể nước chữa cháy Septic tank Bể tự hoại Septic tank wall Tường bể phốt Septic tank bottom slab Đáy bể phốt Septic tank top slab Nắp bể phốt Drainage, pit Mương thu nước, hố thu Tie-Beam Dầm móng Beam- external area of 1st floor slab Dầm- phần nhà sàn tầng Slabs- external area of 1st floor slab Sàn - phần nhà sàn tầng Beam- internal area of 1st floor slab Dầm- phần nhà sàn tầng Slabs- internal area of 1st floor slab Sàn - phần nhà sàn tầng Stair Thang For Residential Formwork to: Ván khn cho: Lean Concrete Bê tơng lót Pile caps Đài cọc Basement slab Sàn tầng hầm Drop panel for pile cap Mũ đài cọc Columns Cột Core-shaft wall Vách lõi cứng Retaining Wall Tường chắn đất Water tank Bể nước Water tank wall Tường bể nước Water tank top slab Nắp bể nước Domestic water tank beam Dầm bể nước sinh hoạt Fire Water tank Bể nước phòng cháy chữa cháy Fire water tank wall Tường bể nước phòng cháy chữa cháy Fire water tank bottom slab Đáy bể nước phòng cháy chữa cháy Quantity Unit 37 m2 43 m2 381 m2 79 m2 135 m2 87 m2 736 m2 m2 140 m2 82 m2 34 m2 149 m2 318 m2 99 m2 251 m2 47 m2 642 m2 1,470 m2 202 m2 30 m2 740 m2 510 m2 1,140 m2 714 m2 132 m2 61 m2 712 m2 m2 Supply Material (VND) Labor (VND) Total Rate (VND) Amount (VND) Remark GHOMES APARTMENT PROJECT, HCMC, VIETNAM 2.1 BASEMENT- BUILDING WORKS No 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 Description Fire water tank top slab Nắp bể nước phòng cháy chữa cháy Septic tank Bể tự hoại Septic tank wall Tường bể phốt Septic tank bottom slab Đáy bể phốt Septic tank top slab Nắp bể phốt Oil tank Bể dầu Oil tank wall Tường bể dầu Oil tank bottom slab Đáy bể dầu Oil tank top slab Nắp bể dầu Drainage, pit Mương thu nước, hố thu Ramp Ram dốc Tie-Beam Dầm móng Beam- external area of 1st floor slab Dầm- phần nhà sàn tầng Slabs- external area of 1st floor slab Sàn - phần nhà sàn tầng Beam- internal area of 1st floor slab Dầm- phần nhà sàn tầng Slabs- internal area of 1st floor slab Sàn - phần nhà sàn tầng Stair Cầu thang Quantity Unit 141 m2 1,644 m2 259 m2 724 m2 104 m2 m2 19 m2 487 m2 369 m2 19 m2 275 m2 2,076 m2 656 m2 1,307 m2 68 m2 56,583 kg 27,237 kg 840 kg 22,748 kg 14,199 kg 33,399 kg 17,108 kg Supply Material (VND) Labor (VND) Total Rate (VND) Amount (VND) Remark CONCRETE REINFORCING CÔNG TÁC CỐT THÉP 86 87 88 89 90 91 92 93 94 95 96 For Service Apartment Supply, fixing & installation of rebar to Cung cấp, lắp đặt cố định lồng thép cho; Pile caps Đài cọc Basement slab Sàn tầng hầm Drop panel for pile cap Mũ đài cọc Columns Cột Core-shaft wall Vách lõi cứng Retaining Wall Tường chắn đất Water tank Bể nước Water tank wall Tường bể nước Water tank bottom slab Đáy bể nước Water tank top slab Đáy bể nước Septic tank Bể tự hoại Septic tank wall Tường bể phốt Septic tank bottom slab Đáy bể phốt kg kg kg 32,214 kg kg incl kg incl GHOMES APARTMENT PROJECT, HCMC, VIETNAM 2.1 BASEMENT- BUILDING WORKS No 97 98 99 100 101 102 103 104 105 106 107 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 Description Septic tank top slab Đáy bể phốt Beam- external area of 1st floor slab Dầm- phần nhà sàn tầng Slabs- external area of 1st floor slab Sàn - phần nhà sàn tầng Beam- internal area of 1st floor slab Dầm- phần nhà sàn tầng Slabs- internal area of 1st floor slab Sàn - phần nhà sàn tầng Stair Cầu thang Drainage, pit Mương thu nước, hố thu For Residential Supply, fixing & installation of rebar to Cung cấp, lắp đặt cố định lồng thép cho; Pile caps Đài cọc Basement slab Sàn tầng hầm Drop panel for pile cap Mũ đài cọc Basement beam Dầm móng Columns Cột Core-shaft wall Vách lõi cứng Shear wall Vách tầng hầm Retaining Wall Tường chắn đất Water tank Bể nước Water tank wall Tường bể nước Water tank bottom slab Đáy bể nước Water tank top slab Đáy bể nước Septic tank Bể tự hoại Septic tank wall Tường bể phốt Septic tank bottom slab Đáy bể phốt Septic tank top slab Đáy bể phốt Oil tank Bể dầu Oil tank wall Tường bể dầu Oil tank bottom slab Đáy bể dầu Oil tank top slab Đáy bể dầu Ramp Ram dốc Beam- external area of 1st floor slab Dầm- phần nhà sàn tầng Slabs- external area of 1st floor slab Sàn - phần nhà sàn tầng Quantity Unit kg 6,509 kg 7,298 kg 3,425 kg 4,249 kg 810 kg 2,720 kg 358,517.00 kg 123,100 kg 9,240 kg 8,198 kg 88,201 kg 24,849 kg Supply Material (VND) Labor (VND) Total Rate (VND) Amount (VND) Remark incl kg 42,969 kg 37,674 kg 83,356 4,550 kg incl kg incl kg incl kg kg incl kg incl kg incl kg kg incl kg incl kg incl 7,560 kg 20,909 kg 58,106 kg GHOMES APARTMENT PROJECT, HCMC, VIETNAM 5.3 APARTMENT MEP WORK Item Description ELECTRICAL SYSTEM HỆ THỐNG ĐIỆN Lighting, Socket Outlet and Switch System Hệ thống thiết bị chiếu sáng, ổ cắm công tắc đèn Ceiling mounted opalbulkhead luminaire Đèn ốp trần bóng compact 1x9W Reflector recessed downlight Đèn downlight âm trần 1x9W Mirror light Đèn gương 1x22W Single Switch included sub material/ Công tác đơn cho đèn bao gồm vật tư phụ/ chiều, 10A(16A),220V Double Switch included sub material/ Công tác đôi cho đèn bao gồm vật tư phụ chiều, 10A(16A),220V Double Socket Outlet included sub material Ổ cắm đôi bao gồm vật tư phụ/ chấu, 16A, 220V/ pin, 16A, 220V Double Socket Outlet, Water proof, included sub material Ổ cắm đôi chấu, che mưa bao gồm vật tư phụ chấu, 16A, 220V/ BREAKDOWN MÃ HIỆU/ XUẤT XỨ Unit QUANTIT MATERIA LABOR BRAND/ORIGI Y L RATE RATE N UNIT PRICE ĐƠN GIÁ AMOUNT THÀNH TIỀN (VNĐ) REMARK GHI CHÚ - set Sjlite/philip/Eq 1,140 - Sjlite/philip/Eq 11,584 - Sjlite/philip/Eq 672 - set Sjlite/philip/Eq 1,114 - set Sjlite/philip/Eq 1,562 - set Sjlite/philip/Eq 4,230 - set Sjlite/philip/Eq 812 - Cu/PVC+Cu/PVC-E 2x1Cx1.5mm2+1Cx1.5mm2 m Taya/Taisin/Eq 92,599 - Cu/PVC+Cu/PVC-E 2x1Cx2.5mm2+1Cx2.5mm2 m Taya/Taisin/Eq 85,476 - 10 Cu/PVC+Cu/PVC-E 2x1Cx6mm2+1Cx6mm2 m 4,448 - 11 Cu/PVC+Cu/PVC-E 2x1Cx4mm2+1Cx4mm2 m 17,924 - set set Cable electric system/ Hệ thống dây cáp điện 12 13 14 15 16 17 Conduit for socket and lighting/ Hệ thống ống luồn dây điện PVC Conduit/ ống PVC D20 PVC Conduit/ ống PVC D25 Flexible PVC Conduit/ ống mềm PVC D20 Fittings for conduits/ Phụ kiện cho ống/ Other Lighting, Socket Outlet and Switch System Hệ thống thiết bị chiếu sáng, ổ cắm công tắc đèn Cable electric system/ Hệ thống dây cáp điện Taya/Taisin/Eq Taya/Taisin/Eq m SP/Sino/Eq 128,214 - m SP/Sino/Eq 17,898 - m SP/Sino/Eq 14,246 - lot lô SP/Sino/Eq 16 - lot lô lot lô Sjlite/philip/Eq Taya/Taisin/Eq 13 - 13 - GHOMES APARTMENT PROJECT, HCMC, VIETNAM 5.3 APARTMENT MEP WORK Item Description 18 Conduit for socket and lighting/ Hệ thống ống luồn dây điện ELV SYSTEM HỆ THỐNG ĐIỆN NHẸ Equipments Thiết bị Telephone and Data Complex Outlet 19 Ổ cắm điện thoại mạng kết hợp RJ11, RJ45 BREAKDOWN MÃ HIỆU/ XUẤT XỨ Unit QUANTIT MATERIA LABOR BRAND/ORIGI Y L RATE RATE N lot SP/Sino/Eq 13 lô set Data Outlet Ổ cắm mạng RJ45 set 21 CableTelevision Outlet Ổ cắm tivi truyền hình cáp F5 set 22 Telephone, Data Cable and Conduits Cáp mạng thoại ống lot lô 23 Other 24 Telephone and data system Hệ thống mạng thoại 25 26 27 28 29 30 31 32 AMOUNT THÀNH TIỀN (VNĐ) REMARK GHI CHÚ - - 20 HVAC SYSTEM HỆ THỐNG ĐIỀU HỊA THƠNG GIÓ Equipments Thiết bị Multi outdoor unit airconditioner, 2way inverter Dàn nóng điều hòa multi , chiều, inverter Capacity: 10kW Multi outdoor unit airconditioner, 2way inverter Dàn nóng điều hòa multi , chiều, inverter Capacity: 7.5kW Multi outdoor unit airconditioner, 2way inverter Dàn nóng điều hòa multi , chiều, inverter Capacity: 5kW Multi indoor unit air conditioner, way inverter, wall mounted Dàn lạnh điều hòa multi , chiều, inverter, gắn tường Cooling capacity: 2.5kW Split air conditioning, wall mounted Điều hòa cục gắn tường Cooling capacity: 5kW Split air conditioning, wall mounted Điều hòa cục gắn tường Cooling capacity: 2.5kW Refrigerant pipe cw insulation Ống gas lạnh bao gồm bảo ôn Exhaust air fan for toilet Quạt thải gió vê sinh - Exhaust air fans for toilet, ceiling type - Q=25l/s@50Pa - Quạt thải gió vệ sinh, gắn trần - Q=25l/s@50Pa UNIT PRICE ĐƠN GIÁ Sino/Vanlock/ Eq 460 - Sino/Vanlock/ Eq 1,452 - Sino/Vanlock/ Eq 748 - Sino/Vanlock/ Eq 16 - lot lô Sino/Vanlock/ Eq - - - Set Daikin/Mitsubis hi/Eq - - Set Daikin/Mitsubis hi/Eq 188 - Set Daikin/Mitsubis hi/Eq 94 - Set Daikin/Mitsubis hi/Eq 704 - Set Daikin/Mitsubis hi/Eq 460 - Set Daikin/Mitsubis hi/Eq 124 - - 778 - Lot VN Set Kruger/Eq GHOMES APARTMENT PROJECT, HCMC, VIETNAM 5.3 APARTMENT MEP WORK Item 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 Description Exhaust air fan for kitchen Quạt thải gió bếp - Exhaust air fans for kitchen, ceiling type - Q=50l/s@50Pa - Quạt thải gió bếp, gắn trần - Q=50l/s@50Pa Air duct without insulation, air grile, air damper Ống gió lạnh khơng kèm bảo ơn, miệng gió, van gió Sub-material and hanger support Vật tư phu, giá đỡ Other VRV Outdoor Unit Dàn nóng điều hòa VRV Capacity: 30HP VRV cooling unit (ACU) Dàn lạnh hệ VRV Cooling capacity: 14kW Conduit for socket and lighting/ Hệ thống ống luồn dây điện Refrigerant pipe cw insulation Ống gas lạnh bao gồm bảo ôn Drain water pipe Ống nước ngưng điều hòa Supply and exhaust air grill Miệng gió cấp gió hồi gió điều hòa Air duct cw insulation Ống gió lạnh kèm bảo ơn Sub-material and hanger support Vật tư phu, giá đỡ Split air conditioning, wall mounted Điều hòa cục gắn tường PLUMPING AND SANITARY SYSTEM HỆ THỐNG CẤP THOÁT NƯỚC/ Equipments Thiết bị SANITARY WARE THIẾT BỊ VỆ SINH Water closet Xí Lavabo Lavabo Sink Chậu bếp Shower Sen tắm Water heater Bình nóng lạnh 30lit Floor drain Phễu thu sàn D60 Bathtub Bồn tắm Floor drain Phễu thu sàn D90 Clothes hanger Móc treo quần áo BREAKDOWN MÃ HIỆU/ XUẤT XỨ Unit QUANTIT MATERIA LABOR BRAND/ORIGI Y L RATE RATE N UNIT PRICE ĐƠN GIÁ AMOUNT THÀNH TIỀN (VNĐ) REMARK GHI CHÚ Set Kruger/Eq 554 - Lot Hoasen/Eq Vietnam - Lot Viet nam - Set Daikin/Mitsubis hi/Eq - - Set Daikin/Mitsubis hi/Eq lot Viet nam lô - - - - Lot Viet nam - - Tien Lot Phong/Kelen/E q - - Lot Asli/Eq - - Lot Asli/Eq - - Lot Asli/Eq - - - - Lot Daikin/Mitsubis hi/Eq - Set Bộ Set Bộ Set Bộ Set Bộ Set Bộ Set Bộ Set Bộ Set Bộ Set Bộ Noken/Toto/Eq Noken/Toto/Eq Noken/Toto/Eq Noken/Toto/Eq Noken/Toto/Eq Noken/Toto/Eq Noken/Toto/Eq Noken/Toto/Eq Noken/Toto/Eq 766 - 790 - 508 - 742 - 742 - 1,226 - 24 - 766 - 766 - GHOMES APARTMENT PROJECT, HCMC, VIETNAM 5.3 APARTMENT MEP WORK Item 54 55 56 57 Description Tower bracket Thanh treo khăn Paper Holder Lô giấy vệ sinh Soap Holder Hộp xà phòng Hanger, supports, And sub material for complete Ty treo, giá đỡ, Và vật liệu cho hoàn thiện BREAKDOWN MÃ HIỆU/ XUẤT XỨ Unit QUANTIT MATERIA LABOR BRAND/ORIGI Y L RATE RATE N Set 766 Bộ Noken/Toto/Eq Set 766 Bộ Noken/Toto/Eq Set 156 Bộ Noken/Toto/Eq lot lô Noken/Toto/Eq UNIT PRICE ĐƠN GIÁ AMOUNT THÀNH TIỀN (VNĐ) REMARK GHI CHÚ - - 58 59 60 WATER SUPPLY SYSTEM HỆ THỐNG CẤP NƯƠC Plan equipments Thiết bị mặt hệ cấp nước Gate Valve Van cổng DN32 Gate Valve Van cổng DN25 Gate Valve Van cổng DN20 Set Bộ Set Bộ Set Bộ Kvs/Eq 473 - Kvs/Eq 791 - Kvs/Eq 791 - Pipe, fitting and accessories for plumbing plan Ống, phụ kiện vật tư phụ mặt - 61 PPR Pipe Ống PPR DN32 m m 62 PPR Pipe Ống PPR DN25 m m 63 PPR Pipe Ống PPR DN20 m m 64 PPR Pipe PN20 Ống PPR PN20 DN20 m m 65 Pipe fitting Phụ kiện ống lot lô 66 Hanger, supports, And sub material for complete Ty treo, giá đỡ, Và vật liệu cho hoàn thiện lot lô Tien Phong/Kelen/E q Tien Phong/Kelen/E q Tien Phong/Kelen/E q Tien Phong/Kelen/E q Tien Phong/Kelen/E q 810 - 1,676 - 3,364 - 2,514 - - - WATER DRAINAGE SYSTEM HỆ THỐNG THOÁT NƯỚC THẢI Pipe, fitting and accessories for plumbing plan Ống, phụ kiện vật tư phụ mặt - - 67 uPVC Pipe PN8 Ống uPVC PN8 DN100 m m 68 uPVC Pipe PN8 Ống uPVC PN8 DN80 m m 69 uPVC Pipe PN6 Ống uPVC PN6 DN50 m m Tien Phong/Kelen/E q Tien Phong/Kelen/E q Tien Phong/Kelen/E q 1,494 - 2,324 - 1,494 - GHOMES APARTMENT PROJECT, HCMC, VIETNAM 5.3 APARTMENT MEP WORK Item Description 70 Pipe fitting Phụ kiện ống 71 Hanger, supports, And sub material for complete Ty treo, giá đỡ, Và vật liệu cho hoàn thiện BREAKDOWN MÃ HIỆU/ XUẤT XỨ Unit QUANTIT MATERIA LABOR BRAND/ORIGI Y L RATE RATE N Tien lot Phong/Kelen/E lô q lot lô VN UNIT PRICE ĐƠN GIÁ AMOUNT THÀNH TIỀN (VNĐ) REMARK GHI CHÚ - - 497 - STORM WATER SYSTEM HỆ THỐNG THOÁT NƯỚC MƯA Storm water riser Hệ trục đứng thoát nước mưa Plan equipments Thiết bị mặt hệ cấp nước 72 Floor Drain Phễu thu sàn DN50 73 Pipe, fitting and accessories for riser Ống, phụ kiện vật tư phụ trục Tien set Phong/Kelen/E q Pipe, fitting and accessories for plumbing plan Ống, phụ kiện vật tư phụ mặt - 74 uPVC Pipe PN8 Ống uPVC PN8 DN100 m m 75 Pipe fitting Phụ kiện ống lot lô 76 Hanger, supports, And sub material for complete Ty treo, giá đỡ, Và vật liệu cho hồn thiện lot lơ FIRE PROTECTION SYSTEM HỆ THỐNG PHÒNG CHÁY CHỮA CHÁY Fire alarm Equipments Thiết bị báo cháy Address smock detector 77 Đầu báo khói địa Heat detector 78 Đầu báo nhiệt Tien Phong/Kelen/E q Tien Phong/Kelen/E q VN 460 - - - - Set Hochiki/Detectomat/Eq 920 - Set Hochiki/Detectomat/Eq 460 - 79 80 81 82 Fire alarm material Vật tư báo cháy Fire signal wire and other material, include conduct, fitting Dây báo cháy vật tư khác, ông gen, hộp đấu nối… Other material, include: steel support, painting red colour, glue, tap Vật tư khác, bao gồm: giá đỡ, sơn ống, keo, băng tan Other Address smock detector Đầu báo khói địa Heat detector Đầu báo nhiệt - Lot Viet Nam - Lot Viet Nam - Lot Hochiki/Detectomat/Eq - Lot Hochiki/Detectomat/Eq - GHOMES APARTMENT PROJECT, HCMC, VIETNAM 5.3 APARTMENT MEP WORK Item Description BREAKDOWN MÃ HIỆU/ XUẤT XỨ Unit QUANTIT MATERIA LABOR BRAND/ORIGI Y L RATE RATE N UNIT PRICE ĐƠN GIÁ AMOUNT THÀNH TIỀN (VNĐ) REMARK GHI CHÚ NHÀ THẦU ĐỀ XUẤT BỔ SUNG THÊM CÁC CÔNG TÁC KHÁC BÊN DƯỚI ĐÂY ADDITONAL WORKS PROPOSED BY CONTRACTOR AS BELOWS: Nhà thầu phép bổ sung thêm công tác xem cần thiết để hồn thành cơng tác theo hồ sơ mời thầu The Contractor is to allow for any additional Works he deems necessary to complete the Works in accordance with the Tender TOTAL - GHOMES APARTMENT PROJECT, HCMC, VIETNAM 5.4 INFRASTRUCTURE - MEP WORKS BREAKDOWN ITE M NO DESCRIPTION NỘI DUNG CÔNG VIỆC SPECIFICATION QUY CÁCH THIẾT BỊ UNIT MÃ HIỆU/ XUẤT XỨ ĐƠN BRAND/ORIGIN VỊ A ELECTRICAL SYSTEM HỆ THỐNG ĐIỆN DB-Villla.1 ~ 40KVA Schneider/ABB/Eq DB-SHOP.1 ~6 137.11KVA Schneider/ABB/Eq Cu/XLPE/SWA/PVC - 24kV Cu/XLPE/PVC+ Cu/PVC-E Cu/XLPE/PVC+ Cu/PVC-E HDPE Conduit ống HDPE Manhole Hố ga Cable Ladder thks 2.0mm Thang cáp mạ kẽm độ dày 2.0mm 3x1Cx120mm2 Taya/Taisin/Eq 4x1Cx25mm2+1Cx16mm2 Taya/Taisin/Eq 4x1Cx95mm2+1Cx50mm2 Taya/Taisin/Eq 8 10 QUANTITY set set m m m 17 18 19 20 21 22 WATER DRAINAGE SYSTEM HỆ THỐNG THOÁT NƯỚC THẢI Manhole Hố ga Pipe Ống uPVC Pipe fitting Phụ kiện ống Hanger, supports, And sub material for complete Ty treo, giá đỡ, Và vật liệu cho hồn thiện Excavation and backfill Cơng tác đào lấp đất REMAR K GHI CHÚ - 12.00 - 220.00 1,020.00 1,620.00 - SP/Sino/Eq m 2,288.00 - VN set 1.00 - 300x100 VN m 110.00 - lot lô 1.00 - VN lot lô 1.00 - VN lot lô 1.00 VN set 1.00 - VN m 110.00 - VN Lot 1.00 - - - PLUMPING AND SANITARY C SYSTEM HỆ THỐNG CẤP THOÁT NƯỚC/ 16 AMOUNT THÀNH TIỀN (VND) 1600x1600x1200 D160/125 ELV SYSTEM HỆ THỐNG ĐIỆN NHẸ Manhole 11 1400x1400x1200 Hố ga Cable tray thks 1.5mm 12 500x100 Máng cáp mạ kẽm độ dày 1.5mm ELV infras works: Cable, pipe, excavation and back fill, submaterial 13 Hệ thống cáp điện, đường ống ngồi nhà, cơng tác đào lấp đất phụ kiện cung cấp cho hệ thống điện nhẹ 15 UNIT PRICE ĐƠN GIÁ (VND) 6.00 B 14 LABOR RATE - Outdoor lighting system Hệ thống chiếu sáng ngồi Excavation and backfill Cơng tác đào lấp đất Ti treo, giá đỡ, vật tư phụ Hangers, supports, fittings, sub material and others accessories for complete WATER SUPPLY SYSTEM HỆ THỐNG CẤP NƯƠC Group Water metter Cụm đồng hờ HDPE Pipe Ớng HDPE Manhole Hố ga Excavation and backfill Công tác đào lấp đất MATERIA L RATE - DN100 Asahi DN100 Tien Phong/De Nhat/Eq 300x300x1000 VN VN VN DN200 STORM WATER SYSTEM HỆ THỐNG THOÁT NƯỚC MƯA Manhole 23 Hố ga Pipe 24 DN200 Ống uPVC Pipe fitting 25 Phụ kiện ống Tien Phong/De Nhat/Eq Tien Phong/De Nhat/Eq set 2.00 - m 100.00 - 2.00 - 1.00 - 2.00 - 50.00 - set lot lô set m m lot lô 1.00 lot lô VN VN VN Tien Phong/De Nhat/Eq Tien Phong/De Nhat/Eq - 1.00 lot lô set m m lot lô 1.00 - 27.00 - 300.00 - 1.00 - GHOMES APARTMENT PROJECT, HCMC, VIETNAM 5.4 INFRASTRUCTURE - MEP WORKS BREAKDOWN ITE M NO 26 27 28 DESCRIPTION NỘI DUNG CÔNG VIỆC Hanger, supports, And sub material for complete Ty treo, giá đỡ, Và vật liệu cho hồn thiện Excavation and backfill Cơng tác đào lấp đất Automatic watering system Hệ thống tưới nước tự động FIRE PROTECTION SYSTEM D HỆ THỐNG PHÒNG CHÁY CHỮA CHÁY FIRE FIGHTING SYSTEM HỆ THỐNG CHỮA CHÁY Fire fighting equipments Thiết bị báo cháy Fire fighting Valve 29 Hệ thống van chữa cháy Fire hydrant post outside 30 Trụ chữa cháy nhà Fire hydrant cabinet outside, include: nozzleD19, hose reel DN63 31 Hộp chữa cháy nhà, bên bao gờm: lăng phun D19, cuộn vòi DN63, Breeching inlet Pilar 32 Họng tiếp nước nhà Breeching inlet Pilar 33 Họng tiếp nước nhà Breeching inlet Pilar 34 Họng tiếp nước nhà Other equipments 33 Các thiết bị khác 35 36 37 38 Fire fighting material Vật tư báo cháy Steel pipe Ống thép Steel pipe fitting Phụ kiện ống thép Excavation and backfill Công tác đào lấp đất Other material, include: steel support, painting red colour, glue, tap Vật tư khác, bao gồm: giá đỡ, sơn ống, keo, băng tan ALLOW FOR SWIMMING POOL INFTRATION SYSTEM AND LIGHTING E DỰ TRÙ CHO HỆ THỐNG LỌC VÀ HỆ THỐNG ÁNH SÁNG BỂ BƠI Infinity pool in SA building 39 Bể bơi tòa SA Swimming pool in Residential building 40 Bể bơi tòa hộ F SPECIFICATION QUY CÁCH THIẾT BỊ NHÀ THẦU ĐỀ XUẤT BỔ SUNG THÊM CÁC CÔNG TÁC KHÁC BÊN DƯỚI ĐÂY ADDITONAL WORKS PROPOSED BY CONTRACTOR AS BELOWS: UNIT MÃ HIỆU/ XUẤT XỨ ĐƠN BRAND/ORIGIN VỊ QUANTITY MATERIA L RATE LABOR RATE UNIT PRICE ĐƠN GIÁ (VND) AMOUNT THÀNH TIỀN (VND) lot lô VN VN VN REMAR K GHI CHÚ 1.00 lot lô lot lô 1.00 - 1.00 - - Lot 1.00 - Korea/Eq Lot 1.00 - Korea/Eq Lot 1.00 - 3.00 - 2.00 - 4.00 - Kvs/Eq Korea/Eq outlet ngõ outlet ngõ Korea/Eq Korea/Eq set set set VN Lot 1.00 - Hoaphat/Vietduc/Eq Lot 1.00 - Hoaphat/Vietduc/Eq Lot 1.00 - VN Lot 1.00 - VN Lot 1.00 - lot lô 1.00 - 1.00 - lot lô GHOMES APARTMENT PROJECT, HCMC, VIETNAM 5.4 INFRASTRUCTURE - MEP WORKS BREAKDOWN ITE M NO DESCRIPTION NỘI DUNG CÔNG VIỆC SPECIFICATION QUY CÁCH THIẾT BỊ UNIT MÃ HIỆU/ XUẤT XỨ ĐƠN BRAND/ORIGIN VỊ QUANTITY MATERIA L RATE LABOR RATE UNIT PRICE ĐƠN GIÁ (VND) AMOUNT THÀNH TIỀN (VND) Nhà thầu phép bổ sung thêm công tác xem cần thiết để hoàn thành công tác theo hồ sơ mời thầu The Contractor is to allow for any additional Works he deems necessary to complete the Works in accordance with the Tender Documents TOTAL CARRIED TO SUMMARY - REMAR K GHI CHÚ GHOMES APARTMENT PROJECT, HCMC, VIETNAM EXTERNAL WORK No Description Quantity Unit SITE WORK & LANDSCAPE, SERVICE WORKS 10 11 12 13 14 15 16 17 18 19 20 21 22 23 CHUẨN BỊ CƠNG TRƯỜNG SITE PREPARATION Tạm tính cho cơng tác chuẩn bị Allow for site preparation ĐƯỜNG ĐI VÀ KHUÔN VIÊN ROADS AND SURFACE PARKING Đường xe ô tô tới bãi đỗ xe Driveway to car park Đường xe chỗ để xe khu dịch vụ Driveway and car park for Service Appartment area Lát đá khu vực trả khách Stone paving for Drop off Area Lát đá vỉa hè trước sảnh vào Stone paving for walkway in front of Entrance Lát đá vỉa hè trước cửa hàng Stone paving for walkway in front of Shophouse Lát gạch bê tông trồng cỏ cho chỗ để xe Grass concrete block paving for car park Lát gạch sâu cho vỉa hè Concrete block paving for sidewalk Lát đá hoàn thiện quanh khu vực bể nước Stone paving at water feature area Lát đá bậc thang, h=500 Stone paving for steps, h=500 Lát gạch terracotta cho khu vực tòa nhà Terracotta paving for area in between the buildings Bó vỉa hồn thiện móng bê tơng Kerbs complete with concrete foundation Gờ giảm tốc Speed hump Chặn bánh xe Wheel stopper Signage, traffic sign work Công tác biển hiệu, biển báo giao thơng HÀNG RÀO VÀ CỞNG RA VÀO FENCING AND GATES Hàng rào bao quanh 1800mm 1800mm high boundary fence Apartment signage wall Tường biển hiệu khu hộ dịch vụ Project signage wall Tường biển hiệu khu hộ Cổng vào khu vực nhà Entrance gate of Residential Buildings Barriers at gate Barrier cổng vào Green sliding fence Cổng trượt Access card control gate Cổng vào kèm kiểm tra thẻ CÁC HẠNG MỤC KHÁC NGOÀI NHÀ OTHER EXTERNAL BUILDINGS Tạm tính nhà bảo vệ 3500x2200 Allow for guard's house 3500x2200 lot 461 m2 339 m2 434 m2 149 m2 923 m2 348 m2 484 m2 24 m2 298 m 32 m2 593 m 46 m 16 nos lot 153 m m 13 m lot lot lot lot lot Supply Material (VND) Labor (VND) Total Rate (VND) Amount (VND) Remark GHOMES APARTMENT PROJECT, HCMC, VIETNAM EXTERNAL WORK No 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Description Tạm tính kết cấu khu sàn treo, tầng khu dân cư Allow for steel structure of hanging deck on level Residential Building Tạm tính vách kính bao che khu sàn treo, tầng khu dân cư Allow for glazing of hanging deck on level Residential Building Cầu thang xoắn lên sàn treo, bao gồm kết cấu thép, lan can Feature spiral staircase to hanging deck, including steel structure, railing Tạm tính kết cấu sàn lửng tầng 13, 14 Allow for structure of mezzanine floor on level 13, 14 HỆ THOÁT NƯỚC MƯA DRAINAGE SYSTEM Mương thoát nước nhà, bao gồm nắp đậy Drainage ditch, including ditch cover Hố ga bao gồm nắp đậy Manhole with cover Kết nối với hệ thống thoát nước khu vực trạng Connection with existing drainage system THOÁT NƯỚC TẠM TEMPORARY DRAINAGE Hệ thống thoát nước tạm thời Temporary drainage system CÔNG TÁC BỂ BƠI SWIMMING POOL Bể bơi khu hộ cho thuê Infinity pool in Service Appartment Building Chống thấm cho bể bơi Water proofing to swimming pool Vữa ximăng M75 dày 20mm bảo vệ lớp chống thấm bể bơi Cement mortar M75, 20mm thk.for Ốp lát gạch mosaic cho bể bơi Mosaic tile for swimming pool Bể bơi khu dân cư Swimming pool in Residential Building Chống thấm cho bể bơi Water proofing to swimming pool Vữa ximăng M75 dày 20mm bảo vệ lớp chống thấm bể bơi Cement mortar M75, 20mm thk.for Ốp lát gạch mosaic cho bể bơi Mosaic tile for swimming pool CÔNG TÁC CHỐNG THẤM WATER PROOFING Chống thấm cho đáy tường bồn hoa tầng Water proofing to inside wall and slab of planter box on ground floor Chống thấm cho đáy tường bồn hoa tầng khu hộ cho thuê Water proofing to inside wall and slab of planter box on level 6, Service Appartment building Chống thấm cho đáy tường bồn hoa tầng khu dân cư Water proofing to inside wall and slab of Quantity Unit 230 m2 295 m2 lot 79 m2 lot lot lot lot lot 126 m2 126 m2 126 m2 1,006 m2 1,006 m2 1,006 m2 615 m2 56 m2 457 m2 Supply Material (VND) Labor (VND) Total Rate (VND) Amount (VND) Remark GHOMES APARTMENT PROJECT, HCMC, VIETNAM EXTERNAL WORK No 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 Description Chống thấm cho sàn tầng khu hộ cho thuê Water proofing to floor slab on level 6, SA Building Chống thấm cho sàn tầng khu dân cư Water proofing to floor slab on level 6, Residential Building Vữa ximăng M75 dày 20mm bảo vệ lớp chống thấm tầng Cement mortar M75, 20mm thk.for protecting waterproof layer for planter box on ground floor Vữa ximăng M75 dày 20mm bảo vệ lớp chống thấm tầng khu hộ cho thuê Cement mortar M75, 20mm thk.for protecting waterproof layer for planter box on level 6, Service Appartment building Vữa ximăng M75 dày 20mm bảo vệ lớp chống thấm tầng khu dân cư Cement mortar M75, 20mm thk.for protecting waterproof layer for planter box on level 6, Residential building Vữa ximăng M75 dày 20mm bảo vệ lớp chống thấm tầng khu hộ cho thuê Cement mortar M75, 20mm thk.for protecting waterproof layer for floor on level 6, Service Appartment building Vữa ximăng M75 dày 20mm bảo vệ lớp chống thấm tầng khu dân cư Cement mortar M75, 20mm thk.for protecting waterproof layer for floor on level 6, Residential building HOÀN THIỆN SÀN FLOOR FINISHING Sàn gỗ nhựa cho sảnh thang tầng 6, khu hộ cho thuê Wood plastic composite flooring for lobby level 6, Service Appartment Building Sàn gỗ nhựa cho tầng 6, khu dân cư Wood plastic composite flooring for level 6, Residential Building Sàn gỗ nhựa cho sàn treo tầng 6, khu dân cư Wood plastic composite flooring for hanging deck at level 6, Residential Building Lát đá cho khu BBQ sân khấu mini Stone paving for BBQ and mini-amphitheather Lát đá cho lối spa Stone paving spa path Cỏ nhân tạo cho khu sân chơi gym Artificial grass for play ground and gym Lát đá cho khu xanh sàn lửng tầng 13, 14 Stone paving for mezzanine area level 13, 14 HOÀN THIỆN TRẦN CEILING FINISHING Bả sơn cho đáy cạnh sàn dầm tầng Skimcoat plaster and paint for bottom and side of slab and beam at level Bả sơn cho đáy cạnh sàn dầm tầng 15 Skimcoat plaster and paint for bottom and side of slab and beam at level 15 Trần gỗ cho khu xanh tầng 13 Wooden slats for ceiling of green area on level 13 Quantity Unit 41 m2 442 m2 615 m2 56 m2 457 m2 41 m2 442 m2 57 m2 189 m2 - m2 87 m2 m2 71 m2 234 m2 1,587 m2 65 m2 290 m2 Supply Material (VND) Labor (VND) Total Rate (VND) Amount (VND) Remark GHOMES APARTMENT PROJECT, HCMC, VIETNAM EXTERNAL WORK No 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 Description HOÀN THIỆN TƯỜNG WALL FINISHING Bả sơn cho tường bê tông tầng khu hộ cho thuê Skimcoat plaster and paint for concrete wall on level service apartment Bả sơn cho tường gạch tầng khu hộ cho thuê Skimcoat plaster and paint for brick wall on level service apartment Bả sơn cho tường bê tông tầng khu dân cư Skimcoat plaster and paint for concrete wall on level Residential Building Bả sơn cho tường gạch tầng khu dân cư Skimcoat plaster and paint for brick wall on level Residential Building Bả sơn cho tường bê tông tầng 13, 14 Skimcoat plaster and paint for concrete wall on level 13, 14 Bả sơn cho tường gạch tầng 13, 14 Skimcoat plaster and paint for brick wall on level 13, 14 Bả ốp alu cho cột vách tầng 13-14 Skimcoat plaster and alu panel for columns and walls on level 13-14 Ốp alu cho cột vách tầng khu dân cư Alu panel for columns and walls on level Residential Building Ốp trang trí quanh nhà vệ sinh chung Decorative louver around public toilet Ốp trang trí quanh khu vui chơi Decorative louver around playground Ốp đá thang máy Stone for lift lobby Vách kính phòng đa chức Glazing with aluminum frame for multi-function room Rèm cho vách kính phòng đa chức Black-out roller blind for multi-function room BÀN GHẾ SÂN CHƠI FURNITURE and PLAY GROUND Cho tầng 6: On level 6: Ghế lounger bể bơi khu hộ cho thuê Lounger at infinity pool, SA Building Giường bể bơi khu hộ cho thuê Pool bed, SA Building Ghế lounger bể bơi khu dân cư Lounger at swimming pool, Residential Building Giường bể bơi khu dân cư Pool bed, Residential Building Ghế lounger sảnh thang máy Lounger at lift lobby Ghế lounger theo modul Modular lounger Ghế mềm Soft pad seating Bàn game Game table Bàn ghế khu BBQ Table and chair at khu BBQ BBQ counter with grill and sink, wter tap Bàn nướng với vỉ nướng chậu rửa, vòi nước Quantity Unit 137 m2 98 m2 396 m2 614 m2 324 m2 28 m2 263 m2 659 m2 153 m2 174 m2 199 m2 182 m2 182 m2 set set set 30 set set set 22 set set set 10 m Supply Material (VND) Labor (VND) Total Rate (VND) Amount (VND) Remark GHOMES APARTMENT PROJECT, HCMC, VIETNAM EXTERNAL WORK No 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 Description Bàn bar mini Mini bar table Lounger khu quán bar Cloud lounger/ Cascade deck lounger Máy bán hàng tự động Vending machine Thác nước Water spout Cầu trượt bể trẻ em Play fort with slide for children Khu vui chơi cho trẻ em Wallholla for children Merry-go-round Vòng quay Thác nước spa Rain spa Cho tầng 13, 14: On level 13, 14: Ghế lounger Lounger Bàn Table CÔNG TÁC CẢNH QUAN HARDSCAPE Cho tầng trệt: On ground floor: Cơng tác hồn thiện cho bồn nước Finishing works for water features Ốp đá cho tường bồn hoa Stone facing for wall of planter boxes Cho tầng 6: On level 6: Ốp đá cho tường bồn hoa, khu dân cư Stone facing for wall of planter boxes at Residential Building Cho tầng 13, 14: On level 13, 14: Ốp đá cho tường bồn hoa, khu dân cư Stone facing for wall of planter boxes at Residential Building TRỒNG CÂY SOFTSCAPE Cho tầng trệt: On ground floor: Cung cấp thi công thảm cỏ (bao gồm lớp versicell, lớp vải địa kỹ thuật, lớp đất trồng cỏ), khu vực nhà tầng Supply and install grass system for landscape area (including versicell, geotextile, soil and grass), ground floor Cung cấp thi công xanh khu vực nhà tầng Supply and install trees for landscape area at ground floor Cho tầng 6: On level 6: Cung cấp thi công thảm cỏ (bao gồm lớp versicell, lớp vải địa kỹ thuật, lớp đất trồng cỏ), khu vực bể bơi tầng Supply and install grass system for landscape area (including versicell, geotextile, soil and grass), around infinity pool level Quantity Unit set set set lot lot lot lot lot set set 116 m2 703 m2 245 m2 315 m2 356 m2 35 nos 32 m2 Supply Material (VND) Labor (VND) Total Rate (VND) Amount (VND) Remark GHOMES APARTMENT PROJECT, HCMC, VIETNAM EXTERNAL WORK No 97 98 99 Description Cung cấp thi công thảm cỏ (bao gồm lớp versicell, lớp vải địa kỹ thuật, lớp đất trồng cỏ), khu vực nhà tầng 6, khu dân cư Supply and install grass system for landscape area (including versicell, geotextile, soil and grass) on level 6, Residential Building Cung cấp thi cơng xanh khu vực ngồi nhà tầng khu dân cư Supply and install trees for landscape area on level 6, Residential Building Vườn treo Hanging garden Cho tầng 13, 14: On level 13, 14: 100 Cung cấp thi công thảm cỏ (bao gồm lớp versicell, lớp vải địa kỹ thuật, lớp đất trồng cỏ), khu vực nhà tầng 13, 14, khu dân cư Supply and install grass system for landscape area (including versicell, geotextile, soil and grass) on level 13, 14, Residential Building 101 Cung cấp thi cơng xanh khu vực ngồi nhà tầng 13, 14 khu dân cư Supply and install trees for landscape area on level 13, 14, Residential Building TOTAL CARRIED TO SUMMARY Quantity Unit 234 m2 22 nos lot 121 m2 nos Supply Material (VND) Labor (VND) Total Rate (VND) Amount (VND) Remark ... 1.2m với bóng T5 1x28W, chống nổ (lắp 1x12W LED downlight Đèn downlight âm trần bóng LED 1x12W 1x7W LED downlight c/w glass cover Đèn downlight âm trần bóng LED 1x7W, có mặt kiếng bảo vệ Motion... dự phòng 2x8W incandescent bulbs lighting c/w hrs NI-CD battery pack Đèn chiếu sáng khẩn cấp 2x8W với nguồn dự phòng Lighting point Điểm đèn 10A gang - way lighting switch Công tắc chiều 10A,... 1250kVA,0.4kV,50Hz,3P,4W Kohler/Cummins/Eq 1250kVA,0.4kV,50Hz,3P,4W Vietnam/Eq set set REMAR K GHI GHOMES APARTMENT PROJECT, HCMC, VIETNAM 2.2 BASEMENT MEP WORK ITE M NO DESCRIPTION NỘI DUNG CÔNG

Ngày đăng: 03/11/2019, 19:24

TỪ KHÓA LIÊN QUAN

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN

w