KK Cage Manual Material Preliminary Arrival Task Assembly Installation Progress Sequence Lifting Dismantle Material explanation < Anchor Accessory> 1 Cone Screw M20x50L Accessory for fixing Jig, Anchor unit, Supporting shoe Sealing sleeve M20 Plastic sleeve for reuse the Cone Supply for every floor AL-Bracket climbing cone M20 Embedded in Con’c Supply for typical floors and reuse after K-AL Stop anchor Embedded in Con’c Supply for every floor Material explanation < Bolt Accessory> 1 Bolt M12-35L Main Profile(Top/Middle/Bottom) bolt that connect to Supporting channel Bolt M12-120L Connecting bolt for Main Profile and Supporting channel Lug pin To fix the Handrail U-Bolt To fix the Expended metal and Profile Bolt M16-110L To fix the Supporting shoe and cage Material explanation < Anchor unit Part > 1 Anchor unit To connect Slab type Embedded anchor and Supporting shoe Supporting shoe To support Cage’s Supporting channel Jig To fix embedded anchor on Slab Lifting hook For install cage and lifting 5 Anchor Unit Anchor Assembled and Installed Material explanation < Unit Part> Saftey profile Handrail Extended metal Main profile Supporting channel Extension profile Toe board Advenced work < Embedded Anchor Type > There are two different Embedded Anchor Types which are Wall and Slab type Wall type The Anchor is embedded through panel’s hole No require for Anchor Unit Slab type The Anchor is installed on Slab, the Anchor Unit required Advenced work < Cage Types> Wall and Slab type The difference between two Type is the bottom of Safety Profile Extended metal is exist in Wall type for dismantle the bottom Shoe Wall type Slab type Advenced work < Drawing Composition > Compose with Manufacturing drawing, Embedded Anchor drawing, and Setting drawing Manufacturing Drawing The drawing that able to check every detail of materials such as size and quantity Anchor Embedded Drawing The drawing used for prior checking for embedded anchor, it able to check matching hole for Jig and Embedded Anchor on external aluminum beam panel Setting Drawing The drawing indicate Cage Type, and size This drawing is used for assemble and install Advenced work < Setting Drawing Explanation > S for Slab Type / W for Wall Type S-40 Profile 4ea The vertical size and material of cage are identical ( But, separate Wall / Slab type) S-41 Profile 3ea S-39 Profile 5ea Setting Drawing Check Width of material on drawing and assemble 1) S-41 Width : 2000 Main profile 3ea 2) S-40 Width : 2600 Main profile 4ea 3) S-39 Width : 4000 Main profile 5ea Consider interference of Profile while move the Anchor and the distance between each cage is 100mm Assembly Choose location of Supporting channel - Choose the location of Supporting channel according to interval size in drawing - Using timber for connecting bolt easily ※ Be aware of Channel and Angle coupler hole to face bottom Assembly Install Main profile Use M12-120L - Fix Main profile(Middle) to Channel ※ Be aware direction of Main profile’s Top/Bottom Use M12-35L Assembly Connect Safety profile Use M12-35L - Connect Main profile(Middle) and Safety profile(Bottom) ※ Check Vertical Profile Use M12-35L Assembly Connect Extension profile Use M12-35L - Connect Main profile(Middle) and Extension profile(Top) - Using same method to connecting Top, Middle, Bottom Profile ※ Check Vertical Profile Use M12-35L Assembly Install Expended metal Detail of connecting U-Bolt - Connect Main profile to Expended metal - Connect bolts on Both end, bolt on middle ※ Check Vertical Profile Assembly Install Toe board - Connecting Expended metal and install Toe board simultaneously - It is difficult to connect in such narrow space after install Toe board - Due to no holes to fix on Profile, worker must punch holes at site Assembly Install Handrail Detail connected Lug pin - Install Handrail on Main profile - Install 14 Handrail, but additional piece can be welding if necessary ※ Check Vertical Profile Assembly Installation video Installation Preliminary check up for install 2) Check scaffoldings and other interferences have been removed ※ Rather dismantle scaffolding one at the time than dismantle all at same time When the project applied Post tension method, interference occur between the Supporting channel and PT wire Due to interference it need to install and lifting after completion of Stressing, so it need to adjust schedule with site manager 1) Final check up for Supporting shoe’s location and make sure it’s fixed ※ Need to check that Shoe is fixed in same position as drawing Be aware that worker often dismantle shoes without consent due to interference during Al-form setting Installation Install 3) Choose typical cage and sequence of install Install according to marked number and position The interval and location must be check with drawing and try to install exact position 4) Lifting by Tower Crane It need to be moved vertically for stability during tower lift The Supporting channel that install top of floor, installing lifting hook and using expended metal to able vertical lift Installation Connecting Supporting shoe 5) Fix Supporting shoe 6) Fix Supporting shoe 7) Final check up After lift by tower then completion of adjusting left and right side, fastened the Shoe with bolt Tightly fastened to avoid swing ※ Be aware that every installation need to be check verticality and interval between Shoe and Channel Once completion of bolt fastened, following bolt in bottom need to be fastened to support Channel The interval between extended metal is about 100mm, and check Supporting channel not Profile ( The interval may differ per project, must check with drawing ) Verify the verticality and once install is complete, remove cage from Tower Crane Installation Installation video ... the Supporting shoe and cage Material explanation < Anchor unit Part > 1 Anchor unit To connect Slab type Embedded anchor and Supporting shoe Supporting shoe To support Cage s Supporting channel... To support Cage s Supporting channel Jig To fix embedded anchor on Slab Lifting hook For install cage and lifting 5 Anchor Unit Anchor Assembled and Installed Material explanation < Unit Part>... Anchor Unit Slab type The Anchor is installed on Slab, the Anchor Unit required Advenced work < Cage Types> Wall and Slab type The difference between two Type is the bottom of Safety Profile Extended

Ngày đăng: 03/11/2019, 18:12

TÀI LIỆU CÙNG NGƯỜI DÙNG

  • Đang cập nhật ...

TÀI LIỆU LIÊN QUAN

w