KSB-H Tower D (Level"0") Timber plank have to be instTBled after KSB is set up on the building *Balcony wall Type *Alternative slab end - change floors*(B1,B2,C1,C2,C3) Timber plank have to be installed after KSB is set up on the building Timber plank have to be installed after KSB is set up on the building 900mm A 2500mm 4layers platform - Wide Remark KSB-H Quantity = 108 Set KGB-C Quantity = 20 Set Perimeter = 343m Tower(1,2) -MCT 205(R60.0m-2.20t) No Description Size/Dwg No Q'ty Mat Remark Kumkang Kind Kumkang Kind Bldg 1445-2, (HOABINH)DA NANG SOLEIL_KSB-H_17.05.24.dwg 2017-05-24 Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-562-3030 Fax : 02-565-4466 Designed Checked Date ScTBe Project DA NANG SOLEIL Title Subject Co Project No MCT-205 R60.0m/2.2t MCT-205 KHOP Dwg No 1703 01 Q 0100 Rev *Bracket Info Anchor Location A-1 *Alternative slab end - change floors*(B1,B2,C1,C2,C3) D *Hole Position to be installed A-2 *Alternative slab end - change floors*(B1,B2,C1,C2,C3) E *Hole Position to be installed B-2 C (5) (7) (7) (7) (7) A-1 A-1 (5) (5) (3) (3) A-1 (5) *Alternative slab end - change floors*(B1,B2,C1,C2,C3) (5) B-2 *Alternative slab end - change floors*(B1,B2,C1,C2,C3) G *Hole Position to be installed (5) (5) (3) (5) (5) *Balcony wall Type (5) B-2 C F *Hole Position to be installed A-1 A-1 B-1 B-1 A-1 (5) (5) A-1 A-1 (5) (5) (5) A-1 C (5) *Alternative slab end - change floors*(B1,B2,C1,C2,C3) *Hole Position to be installed D A-1 By Site (5) D (5) A-1 D (5) D D D D D C-1 E E (3) E (5) (5) A-1 (5) (5) A-1 B-1 E D (6) (6) (3) A-1 A-1 E (3) E A-1 (3) F D E (5) A-1 (5) (5) A-1 D D D G (5) A-1 (5) E (5) E A-1 (5) E C (5) A-1 (5) (5) (5) A-1 E (5) F D D F A-1 (5) A-1 B-1 (5) (5) C (5) No Description Size/Dwg No Q'ty Mat Remark F B-1 Kumkang Kind Kumkang Kind Bldg 1445-2, (HOABINH)DA NANG SOLEIL_KSB-H_17.05.24.dwg 2017-05-24 Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-562-3030 Fax : 02-565-4466 Designed Checked Date ScTBe Project DA NANG SOLEIL Title Subject Co Project No KHOP Dwg No 1703 01 Q 0110 Rev KSB-H Tower D (Level"0") *Balcony wall Type *Alternative slab end - change floors*(B1,B2,C1,C2,C3) 900mm A 2500mm 4layers platform - Wide Remark KSB-H Quantity = 108 Set KGB-C Quantity = 20 Set Perimeter = 343m Tower(1,2) -MCT 205(R60.0m-2.20t) No Description Size/Dwg No Q'ty Mat Remark Kumkang Kind Kumkang Kind Bldg 1445-2, (HOABINH)DA NANG SOLEIL_KSB-H_17.05.24.dwg 2017-05-24 Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-562-3030 Fax : 02-565-4466 Designed Checked Date ScTBe Project DA NANG SOLEIL Title Subject Co Project No KHOP Dwg No 1703 01 Q 0120 Rev KSB-H Tower D (Level"-1") *Balcony wall Type *Alternative slab end - change floors*(B1,B2,C1,C2,C3) 900mm A 2500mm 4layers platform - Wide Remark KSB-H Quantity = 108 Set KGB-C Quantity = 20 Set Perimeter = 343m Tower(1,2) -MCT 205(R60.0m-2.20t) No Description Size/Dwg No Q'ty Mat Remark Kumkang Kind Kumkang Kind Bldg 1445-2, (HOABINH)DA NANG SOLEIL_KSB-H_17.05.24.dwg 2017-05-24 Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-562-3030 Fax : 02-565-4466 Designed Checked Date ScTBe Project DA NANG SOLEIL Title Subject Co Project No KHOP Dwg No 1703 01 Q 0130 Rev KSB-H Tower D (Level"-2") *Balcony wall Type *Alternative slab end - change floors*(B1,B2,C1,C2,C3) 900mm A 2500mm 4layers platform - Wide Remark KSB-H Quantity = 108 Set KGB-C Quantity = 20 Set Perimeter = 343m Tower(1,2) -MCT 205(R60.0m-2.20t) No Description Size/Dwg No Q'ty Mat Remark Kumkang Kind Kumkang Kind Bldg 1445-2, (HOABINH)DA NANG SOLEIL_KSB-H_17.05.24.dwg 2017-05-24 Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-562-3030 Fax : 02-565-4466 Designed Checked Date ScTBe Project DA NANG SOLEIL Title Subject Co Project No KHOP Dwg No 1703 01 Q 0140 Rev KSB-H Tower D (Level"-3") *Balcony wall Type *Alternative slab end - change floors*(B1,B2,C1,C2,C3) 900mm A 2500mm 4layers platform - Wide Remark KSB-H Quantity = 108 Set KGB-C Quantity = 20 Set Perimeter = 343m Tower(1,2) -MCT 205(R60.0m-2.20t) No Description Size/Dwg No Q'ty Mat Remark Kumkang Kind Kumkang Kind Bldg 1445-2, (HOABINH)DA NANG SOLEIL_KSB-H_17.05.24.dwg 2017-05-24 Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-562-3030 Fax : 02-565-4466 Designed Checked Date ScTBe Project DA NANG SOLEIL Title Subject Co Project No KHOP Dwg No 1703 01 Q 0150 Rev KSB-H Section By Structure Kumkang Climbing System *Balcony wall Type *Alternative slab end - change floors* (B1,B2,C1,C2,C3) No Description Size/Dwg No Q'ty Mat Remark Kumkang Kind Kumkang Kind Bldg 1445-2, (HOABINH)DA NANG SOLEIL_KSB-H_17.05.24.dwg 2017-05-24 Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-562-3030 Fax : 02-565-4466 Designed Checked Date ScTBe Project DA NANG SOLEIL Title Subject Co Project No KHOP Dwg No 1703 01 Q 0010 Rev KSB-H Section By Platform Type Kumkang Climbing System Vertical waling 5.99m (K0340020) KSB-H working deck (K0340010) Diagonal brace 2012L (K0340030) No Description Size/Dwg No Q'ty Mat Remark Kumkang Kind Kumkang Kind Bldg 1445-2, (HOABINH)DA NANG SOLEIL_KSB-H_17.05.24.dwg 2017-05-24 Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-562-3030 Fax : 02-565-4466 Designed Checked Date ScTBe Project DA NANG SOLEIL Title Subject Co Project No KHOP Dwg No 1703 01 Q 0011 Rev (HOABINH)DA NANG SOLEIL_KSB-H_17.05.24.dwg 2017-05-24 Temporary Bracket Type Kumkang Climbing System No.1 Sp.Sliding Platform No.2 End Form By Site(ConventionTB formwork) Slab Formwork By Site(ConventionTB formwork) No.3 Support By Spindle Support By site Slab Formwork By Site(ConventionTB formwork) No.4 Support By site Slab Formwork By Site(ConventionTB formwork) InstTBl Temporary Bracket:130KG No.5 Temporary structure of SLAB - By site No Description Size/Dwg No Q'ty Mat Remark Kumkang Kind Kumkang Kind Bldg 1445-2, Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-562-3030 Fax : 02-565-4466 Designed Checked Date ScTBe Project DA NANG SOLEIL Title Subject Co Project No KHOP Dwg No 1703 01 Q 0012 Rev (HOABINH)DA NANG SOLEIL_KSB-H_17.05.24.dwg 2017-05-24 Temporary Bracket Sp.Type Kumkang Climbing System *Alternative slab end - change floors* (B1,B2,C1,C2,C3) *Alternative slab end - change floors* (B1,B2,C1,C2,C3) By Site No Description Size/Dwg No Q'ty Mat Remark Kumkang Kind Kumkang Kind Bldg 1445-2, Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-562-3030 Fax : 02-565-4466 Designed Checked Date ScTBe Project DA NANG SOLEIL Title Subject Co Project No KHOP Dwg No 1703 01 Q 0013 Rev First Setting Sequence TBternative slab end Type 9F Lift Sliding Platform By Tower Crane Wire By Site 8F Install Temporary Bracket:130KG Install Plywood & SQ.PIPE 7F Connect Spindle with Temporary bracket 6F Connect Spindle with Temporary bracket 5F No Description Size/Dwg No Q'ty Mat Remark Kumkang Kind Kumkang Kind Bldg 1445-2, (HOABINH)DA NANG SOLEIL_KSB-H_17.05.24.dwg 2017-05-24 Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-562-3030 Fax : 02-565-4466 Designed Checked Date ScTBe Project DA NANG SOLEIL Title Subject Co Project No KHOP Dwg No 1703 01 Q 0020 Rev Detail "A" KSB-H Sequence TBternative slab end Type KSB-H Plan Lv.-1(Structure.C2)-Type C Type.A Type.B Type.C A No Description Size/Dwg No Q'ty Mat Remark Kumkang Kind Kumkang Kind Bldg 1445-2, (HOABINH)DA NANG SOLEIL_KSB-H_17.05.24.dwg 2017-05-24 Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-562-3030 Fax : 02-565-4466 Designed Checked Date ScTBe Project DA NANG SOLEIL Title Subject Co Project No KHOP Dwg No 1703 01 Q 0021 Rev Maximum reaction force TBternative slab end Type KSB-H Plan Lv.-1(Structure.C2)-Type C No Description Size/Dwg No Q'ty Mat Remark Kumkang Kind Kumkang Kind Bldg 1445-2, (HOABINH)DA NANG SOLEIL_KSB-H_17.05.24.dwg 2017-05-24 Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-562-3030 Fax : 02-565-4466 Designed Checked Date ScTBe Project DA NANG SOLEIL Title Subject Co Project No KHOP Dwg No Rev 1703 01 Q 0021-2 KSB-H Sequence(Type.A) TBternative slab end Type No Description Size/Dwg No Q'ty Mat Remark Kumkang Kind Kumkang Kind Bldg 1445-2, (HOABINH)DA NANG SOLEIL_KSB-H_17.05.24.dwg 2017-05-24 Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-562-3030 Fax : 02-565-4466 Designed Checked Date ScTBe Project DA NANG SOLEIL Title Subject Co Project No KHOP Dwg No 1703 01 Q 0022 Rev KSB-H Sequence(Type.B) TBternative slab end Type No Description Size/Dwg No Q'ty Mat Remark Kumkang Kind Kumkang Kind Bldg 1445-2, (HOABINH)DA NANG SOLEIL_KSB-H_17.05.24.dwg 2017-05-24 Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-562-3030 Fax : 02-565-4466 Designed Checked Date ScTBe Project DA NANG SOLEIL Title Subject Co Project No KHOP Dwg No 1703 01 Q 0023 Rev KSB-H Sequence(Type.C) TBternative slab end Type No Description Size/Dwg No Q'ty Mat Remark Kumkang Kind Kumkang Kind Bldg 1445-2, (HOABINH)DA NANG SOLEIL_KSB-H_17.05.24.dwg 2017-05-24 Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-562-3030 Fax : 02-565-4466 Designed Checked Date ScTBe Project DA NANG SOLEIL Title Subject Co Project No KHOP Dwg No 1703 01 Q 0024 Rev (HOABINH)DA NANG SOLEIL_KSB-H_17.05.24.dwg 2017-05-24 KSB-H Setting Section Type.B Type.A Type.A Type.B Type.C TBternative slab end Type Type.A Type.B Type.A Type.B Type.B First Setting Type.C Type.C Type.C Type.C (HOABINH)DA NANG SOLEIL_KSB-H_17.05.24.dwg 2017-05-24 Core KGB-C Section Kumkang Climbing System No Description Size/Dwg No Q'ty Mat Remark Kumkang Kind Kumkang Kind Bldg 1445-2, Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-562-3030 Fax : 02-565-4466 Designed Checked Date ScTBe Project DA NANG SOLEIL Title Subject Co Project No KHOP Dwg No 1703 01 Q 0030 Rev ... Bldg 1445-2, (HOABINH)DA NANG SOLEIL_ KSB- H_ 17. 05. 24. dwg 2 017- 05- 24 Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-562-3030 Fax : 02-565-4466 Designed Checked Date ScTBe Project DA NANG SOLEIL Title... Bldg 1445-2, (HOABINH)DA NANG SOLEIL_ KSB- H_ 17. 05. 24. dwg 2 017- 05- 24 Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-562-3030 Fax : 02-565-4466 Designed Checked Date ScTBe Project DA NANG SOLEIL Title... Bldg 1445-2, (HOABINH)DA NANG SOLEIL_ KSB- H_ 17. 05. 24. dwg 2 017- 05- 24 Seocho-Dong, Seocho-gu,Seoul,Korea Tel : 02-562-3030 Fax : 02-565-4466 Designed Checked Date ScTBe Project DA NANG SOLEIL Title

Ngày đăng: 03/11/2019, 08:46

TỪ KHÓA LIÊN QUAN

w