Shop manual ô tô NISSAN 2000 Xterra CONTENTS FRONT AXLE 2 Precautions 2 PRECAUTIONS .2 Preparation 2 SPECIAL SERVICE TOOLS 2 COMMERCIAL SERVICE TOOLS 2
AEL343CAEL645BInstallationNGEL0146To install SMJ, tighten bolts until orange “fulltight” mark appearsand then retighten to specified torque as required.:3-5N·m (0.3 - 0.5 kg-m, 26 - 43 in-lb)CAUTION:Do not overtighten bolts, otherwise, they may be damaged.SUPER MULTIPLE JUNCTION (SMJ)Installation Terminal ArrangementNGEL0147AEL646BSUPER MULTIPLE JUNCTION (SMJ)Terminal Arrangement Terminal ArrangementNGEL0148AEL520CFUSE BLOCK — JUNCTION BOX (J/B)Terminal Arrangement Terminal ArrangementNGEL0149AEL521CFUSE AND FUSIBLE LINK BOXTerminal Arrangement Terminal ArrangementNGEL0198AEL523CJOINT CONNECTORTerminal Arrangement Terminal ArrangementNGEL0150AEL522CaoELECTRICAL UNITSTerminal Arrangement NOTES . appearsand then retighten to specified torque as required.: 3-5 N·m (0.3 - 0.5 kg-m, 26 - 43 in-lb)CAUTION:Do not overtighten bolts, otherwise, they may be