Northrop grumman sperry marine installing IHO

5 91 0
Northrop grumman sperry marine installing IHO

Đang tải... (xem toàn văn)

Thông tin tài liệu

Migrating to IHO Certificate for S-63 1.1 in Northrop Grumman Sperry Marine ECDIS This guide is based on the Sperry VisionMaster FT ECDIS Migrating to IHO certificate for S-63 1.1 Migrating from PRIMAR.CRT to IHO.CRT To install S63 1.1 Data the latest IHO certificate will need to be installed in your ECDIS The IHO.CRT is located on any AVCS S-63 1.1 Media To install it please insert the S-63 1.1 Media into your ECDIS and follow the steps below: Launch the Chart Installer Click the “Show Menu” button situated to the right of the menu bar at the bottom of the display Click on the “Charts” button in the “Main Menu” A “Charts” menu is then displayed as shown below Click on the “Chart Tools” button in the “Charts” menu Click on the “Chart Installer” button in the “Chart Tools” menu Migrating to IHO certificate for S-63 1.1 When the “Chart Installer” button is clicked the user is presented with an “Action Required” dialog as shown below Click “Yes” to continue to the Chart Installer application Installing the new certificate Ensure ‘Install/Update/License Charts’ and ‘S-63’ are selected Select ‘Next’ 1 Migrating to IHO certificate for S-63 1.1 To review which certificates have been installed select the drop down To load S-63 1.1 data the IHO.CRT should be selected from the drop down If a new certificate needs to be installed select ‘Install Certificate’ Browse to the location of the certificate and select ‘Open’ to load the certificate The IHO.CRT has now been installed and S-63 1.1 data can be loaded into the ECDIS Note: When installing S-63 1.1 data the IHO.CRT must be selected from the dropdown before selecting “Next” Reverting to PRIMAR.CRT The Sperry ECDIS remembers which Public Keys have previously been installed and therefore should the migration to S-63 1.1 fail you should not need to re-install the PRIMAR.CRT to be able to load data from S-63 1.0 media However, when installing data from S-63 1.0 you will need to select PRIMAR.CRT from the dropdown before selecting “Next” Migrating to IHO certificate for S-63 1.1 If required the PRIMAR certificate can be re-installed by inserting any AVCS S-63 1.0 Media into your ECDIS and following the same process as described above except this time selecting the PRIMAR certificate Your system will now be in the same state as before attempting the upgrade and you can continue to use AVCS 1.0 data However you should inform your Admiralty Chart Agent of the problems that you have encountered UKHO 2013 All Rights Reserved The copyright in this document, which contains information of a proprietary nature, is vested in UKHO The content of this document may not be used for purposes other than that for which it has been supplied and may not be reproduced, either wholly or in part, in any way whatsoever ...Migrating to IHO certificate for S-63 1.1 Migrating from PRIMAR.CRT to IHO. CRT To install S63 1.1 Data the latest IHO certificate will need to be installed in your ECDIS The IHO. CRT is located... select ‘Open’ to load the certificate The IHO. CRT has now been installed and S-63 1.1 data can be loaded into the ECDIS Note: When installing S-63 1.1 data the IHO. CRT must be selected from the dropdown... to the Chart Installer application Installing the new certificate Ensure ‘Install/Update/License Charts’ and ‘S-63’ are selected Select ‘Next’ 1 Migrating to IHO certificate for S-63 1.1 To review

Ngày đăng: 13/03/2019, 10:22

Từ khóa liên quan

Tài liệu cùng người dùng

  • Đang cập nhật ...

Tài liệu liên quan