Đang tải... (xem toàn văn)
THÔNG TIN TÀI LIỆU
Ngày đăng: 28/04/2018, 09:12
Xem thêm:
TỪ KHÓA LIÊN QUAN
Mục lục
A practical approach to project scheduling: considering the potential quality loss cost in the time–cost tradeoff problem
4. Application of the model
4.2.1. Step 1: Nonconformance risk identification and coding for project activities
4.2.2. Step 2: Nonconformance risk analysis for project activities
4.2.3. Step 3: PQLC estimation with nonconformance risk activity rate
TÀI LIỆU CÙNG NGƯỜI DÙNG
TÀI LIỆU LIÊN QUAN