1. Trang chủ
  2. » Giáo án - Bài giảng

Project management achieving competitive advantage 2nd jeffrey pinto chapter 08

11 123 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Cấu trúc

  • Cost Estimation and Budgeting

  • Common Sources of Project Cost

  • Types of Costs

  • Cost Classifications

  • Cost Estimation

  • Learning Curves

  • Problems with Cost Estimation

  • Creating a Project Budget

  • Activity-Based Costing

  • Budget Contingencies

  • Slide 11

Nội dung

Cost Estimation and Budgeting Chapter Copyright © 2010 Pearson Education, Inc Publishing as Prentice Hall 8-1 Common Sources of Project Cost  Labor  Materials  Subcontractors  Equipment & facilities  Travel Copyright © 2010 Pearson Education, Inc Publishing as Prentice Hall 8-2 Types of Costs  Direct Vs Indirect  Recurring Vs Nonrecurring  Fixed Vs Variable  Normal Vs Expedited Copyright © 2010 Pearson Education, Inc Publishing as Prentice Hall 8-3 X Building Lease Expedite X Material X X X X X X X X X X X X Expedited Normal Variable Fixed Non-recurring Recurring Indirect Costs Direct Labor Direct Cost Classifications X X Copyright © 2010 Pearson Education, Inc Publishing as Prentice Hall 8-4 Cost Estimation  Ballpark (order of magnitude) ±30%  Comparative ±15%  Feasibility ±10%  Definitive ±5% Copyright © 2010 Pearson Education, Inc Publishing as Prentice Hall 8-5 Learning Curves Each doubling of output results in a reduction in time to perform the last iteration Yx = aX b Where : Yx = time required for the x unit of output a = time required for the initial unit of output X = the number of units to be produced b = learning curve slope = log(learning %)/log(2) Copyright © 2010 Pearson Education, Inc Publishing as Prentice Hall 8-6 Problems with Cost Estimation  Low initial estimates  Unexpected technical difficulties  Lack of definition  Specification changes  External factors Copyright © 2010 Pearson Education, Inc Publishing as Prentice Hall 8-7 Creating a Project Budget WBS Project Plan Scheduling • • • Budgeting The budget is a plan that identifies the resources, goals and schedule that allows a firm to achieve those goals Top-down Bottom-up Activity-based costing (ABC) Copyright © 2010 Pearson Education, Inc Publishing as Prentice Hall 8-8 Activity-Based Costing Projects use activities & activities use resources Assign costs to activities that use resources Identify cost drivers associated with this activity Compute a cost rate per cost driver unit or transaction Multiply the cost driver rate times the volume of cost driver units used by the project Copyright © 2010 Pearson Education, Inc Publishing as Prentice Hall 8-9 Budget Contingencies The allocation of extra funds to cover uncertainties and improve the chance of finishing on time • • • • Contingencies are needed because Project scope may change Murphy’s Law is present Cost estimation must anticipate interaction costs Normal conditions are rarely encountered Copyright © 2010 Pearson Education, Inc Publishing as Prentice Hall 8-10 Copyright © 2010 Pearson Education, Inc Publishing as Prentice Hall 8-11 ... factors Copyright © 2010 Pearson Education, Inc Publishing as Prentice Hall 8-7 Creating a Project Budget WBS Project Plan Scheduling • • • Budgeting The budget is a plan that identifies the resources,...Common Sources of Project Cost  Labor  Materials  Subcontractors  Equipment & facilities  Travel Copyright ©... Copyright © 2010 Pearson Education, Inc Publishing as Prentice Hall 8-8 Activity-Based Costing Projects use activities & activities use resources Assign costs to activities that use resources

Ngày đăng: 10/01/2018, 15:35

TỪ KHÓA LIÊN QUAN

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN

w