Polyester plant normal operation document

17 184 0
Polyester plant normal operation document

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

Thông tin tài liệu

Polyester: Normal Operation of the plant Content: Additives 1.1 CPC Preparation 1.2 TiO Preparation Raw Material Mixing Esterification & process column Postesterification Prepolycondensation Discage reactor EG spray system Vacuum system & stripper column Capacity changes and throughput control Content: 10 Plate Heat Exchanger Cleaning 11 Cleaning of Spray EG System (hotwells) 12 Vacuum measurements Additives CPC Preparation • Start CPC sequence in the night, so that the preparation vessel is already prefilled if the morning shift starts • Use the batch check-list to prevent mistakes • Keep the sequence running, only interfere in emergency cases • Keep the batch size constant • After CPC is filled into the preparation tank, bring next pallet of CPC to the preparation area (ready on stock) Additives TiO Preparation • Start TiO sequence in the morning (relatively small amount of EG) for batch preparation • Use the batch check-list to prevent mistakes • Keep the sequence running, only interfere in emergency cases • Keep sediment vessel or sediment vessel empty, if possible • Keep the batch size constant • Reject TiO from centrifuge once a month (accumulation of agglomerates) • After TiO is filled into the preparation tank, bring next pallet of TiO to the preparation area (ready on stock) Raw Material Mixing • Supervise the level in paste mixing tank and the mole ratio • Keep the level in paste mixing tank as high as possible (mixing effect, hold-up time) • Keep agitator speed always constant (30 rpm) • Check mole ratio once a day in the lab (sample taking) • Drifting of PTA balance has a great impact to esterification reaction • Check the paste pumps in the field requently (abnormal noise) • Open manhole of paste mixing vessel to get a feeling about the paste condition • Minimize the PTA dust entrainment into the process off-gas system by keeping the spray EG at the dome of paste mixing vessel in operation • Keep nitrogen feed to paste mixing vessel (blanketing) in operation Esterification and Process column • Keep temperature, esterification level, pressure and return EG (total mole ratio) as stable as possible • Check the level in HTM evaporator once per shift If necessary, fill as slowly as possible in order to prevent any temperature disturbance • Keep level and temperature in process column stable Level and temperature has an influence on the formation of DEG • Adjust column reflux so that no EG is leaving the system on top The column top temperature must correspond with the staturation temperature of water at a given pressure 4 Post-Esterification • Keep monomer feed to postester stable • Keep temperature, level and vacuum stable (influence of degree of esterification) • Remember: A higher temperature (quicker reaction), a lower level (less residence time) or a lower (deeper) vacuum will change the degree of esterification significantly higher temperature = faster boiling = removal of EG low level = less residence time = less time to build monomer low vacuum = more EG is entrained • The higher the DE-%, the less the prepoly efficiency (due to less reactive end groups) and this means a lower vacuum (more load) or higher prepoly reactor temperature must be applied to reach the required viscosity for Discage inlet Prepolycondensation • Keep monomer feed to prepoly stable • Keep temperature, level and vacuum stable (influence of degree of polycondens.) • The higher the DE-% of the monomer (in postesterification), the more the prepoly reactor has to work, means to achieve the desired viscosity (IV) of about 0.3 dl/g, a lower (deeper) vacuum in the prepoly has to be applied This in turn will entrain more oligomers leaving the reaction and collected in the hotwell • The higher the applied temperature, the more by-products are formed Discage reactor • Keep polymer feed to Discage reactor stable • Keep temperature, level and vacuum stable (influence of degree of polycondens.) Vacuum will influence the viscosity extreamly Temperature will influence the formation of by-products such as aldehydes and melt discolouration (yellowness) Level will influence the residence time and thus the viscosity • Keep the agitator speed stable (changing the surface renewal and thus the melt behaviour, reologie) • Remember: The higher the degree of polycondensation, the less end groups are available, the lower (deeper) vacuum has to be applied This in turn will entrain more oligomers from the reaction 7 EG spray system • Keep EG flow th process column stable The higher the feed, the higher the column load Unstable EG flow to column changes column temperature profile • Clean the hotwell baskets as soon as the low level alarm of the respective hotwell appears in the DCS • Clean the EG filter upstream the plate heat exchanger if the respective pressure deviation alarm appears in the DCS • Check the efficiency of the EG spray nozzles from the spray EG condensers once a day (closing one spray nozzle, if pressure / flow remains same, nozzle could be clogged) 8 Vacuum system & stripper column • Observe condensation temperature of the motive steam in the barometric leg of the main vacuum condenser 24E51 • Temperature increasing in 24E51 shows less cooling efficiency resulting in less condensation of motive steam due to fouling (oligomer settling down on the cold surface condenser) resulting in worse vacuum • Keep level in vacuum seal vessel and flow to stripper column constant • Keep the air blower to stripper column always in operation to strip-out the low boiling products from the process water 9 Capacity Changes and Throughput Control • Capacity changes have always some minor effects on the product quality • Changing the plant throughput stepwise over a longer time Plant parameter are altered incrementally in small steps The product quality can be maintained Disadvantageous is the required duration of a change over to a new production capacity • Changing the plant throughput in one go Plant parameter are altered in one go This strategy results in lower product quality for some hours The material has to be downgraded until the process is stable again This method is attractive if the necessary capacity change is so large that it would take several days or if the capacity change can be combined with the correction of some distrubance of with repair work 10 Cleaning of Plate Heat Exchanger • Spent EG contains oligomers, which settle down at the surface of PHE • Such oligomers reduces the heat transfer efficiency resulting in a higher partial pressure of the low boilers dissolved in the spray EG (high partial pressure = low boiling point) This results in an evaporation of such low boilers at higher temperature and load the vacuum system, the vacuum in the reactors get worse • Temperature control system compensates such temperature increase by opening the control valve • Clean and brush the plates thoroughly 11 Cleaning of Spray EG System (hotwells) • Each hotwell contains several filter baskets, which removes bigger particles from the spray EG • Under normal process conditions, the installed filters and the hotwell filter baskets perform their function and the spray nozzles remains free • A poor operation procedure (removal of hotwell filter baskets without closing the insert by a removable pipe) or a build-up of oligomers lumps in the spray circulation system can still lead to a spray nozzle blockage • As soon as the respective alarm appears in the DCS, remove one hotwell filter basket and CLOSE THE INSERT WITH THE REMOVABLE PIPE This removable pipe avoid that unfiltered particles reach the spray nozzles and clog them • The baskets must be cleaned using high pressure water jet pump Clean the baskets thoroughly • To assure the continuous operation (condensation of EG vapours from the process), these spray nozzles must be cleaned regularly Special care must be taken to avoid a vacuum distrubance during this procedure • In a blocked spray nozzle the spray EG can no longer properly atomized A blocked nozzle can be detected by closing the EG supply to this nozzle Observe the indication the flow meter / manometer If no major change is detectable, it is assumed that the nozzle is blocked • For a clean nozzle the flow rate is reduced, when the supply to one of the spray nozzles is interrupted • Another possibility to detect a blocked nozzle: If surface temperature of the pipe connection to the individual spray nozzles are checked (touch by hand), there is a high potential of blocked spray nozzle, if surface temperature is not as low as in the spray EG system (no condensation drops, temperature close to ambient temperature) 12 Vacuum Measurements • At the measuring manifold from the prepoly and DISCAGE ® reactor a large temperature difference develops between the instruments and the reactor content Vapour from the reactor would condense in the vacuum instruments, causing measurement problems or even damaging the instrument if no nitrogen blanketing is applied Therefore make sure that always nitrogen blanketing to these instruments located at the reactors manifold are ensured • Even with the nitrogen blanketing, vacuum measurement can easily be disturbed If oligomer deposits line or clog the measuring manifold, a discrepancy between the pressure measurement in the reactor and the indication on the instrument can develop Such discrepancies can create production problems • To safeguard against such problems, the vacuum measurements of the ESPREE® and DISCAGE® reactor must be checked at least once a day A special nozzle is foreseen at the measuring manifold to connect calibration instruments Make sure that, for mercury type calibration instruments, the mercury is completely dry Water or EG within the vacuum instruments leads to inaccurate results! ... by keeping the spray EG at the dome of paste mixing vessel in operation • Keep nitrogen feed to paste mixing vessel (blanketing) in operation Esterification and Process column • Keep temperature,... changes have always some minor effects on the product quality • Changing the plant throughput stepwise over a longer time Plant parameter are altered incrementally in small steps The product quality... the required duration of a change over to a new production capacity • Changing the plant throughput in one go Plant parameter are altered in one go This strategy results in lower product quality

Ngày đăng: 05/03/2017, 16:23

Từ khóa liên quan

Tài liệu cùng người dùng

  • Đang cập nhật ...

Tài liệu liên quan