1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

Cẩu chế san lấp nhanh

17 940 2
Tài liệu đã được kiểm tra trùng lặp

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 17
Dung lượng 2,5 MB

Nội dung

Cẩu chế san lấp nhanh

Prefabricated Bridge SystemsFHWA STATUS REPORTPrefabricated Bridge Elements andSystemsBenjamin Tang, FHWA, Co-ChairMary Lou Ralls, TX DOT, Co-Chairand the Scan TeamJun 28, 2005 Prefabricated Bridge SystemsFOCUS AREASMinimized traffic disruption (Congestion)Improved work zone safetyMinimized environmental impactsImproved constructibilityImproved product qualityLower life-cycle costs Prefabricated Bridge SystemsLife After Scan - Next Steps Disseminate Report (Hot off the press!) Ongoing Technology Transfer Activities Compiling connection details Developing Decision-Making Framework Implementation Plan (STIP) Advancing Team’s Recommendations Prefabricated Bridge SystemsTEAM’S RECOMMENDATIONS Scan Technology Implementation Plan(STIP) Bridge Movement Systems (SPMTs) Other Bridge Movement Systems Superstructure Systems Partial Depth Concrete Decks Prefabricated onSteel or Concrete Beams U-shaped Segmental Beams with Ribs Prefabricated Bridge SystemsTEAM’S RECOMMENDATIONS STIP - cont’d Full Depth Deck Systems Deck Closure Joint Detail Hybrid Steel-Concrete Deck System Multiple Corrosion Protection System Substructure Systems Prefabricated Bridge SystemsSTIP -1 Bridge Movement Systems(SPMTs) Develop Project Planning Guide Prepare Draft Specifications Solicit Pilot Project Web info sharing Lead: M.L. Ralls; H. Capers, B. Tang Prefabricated Bridge SystemsSTIP -2 Other Bridge MovementSystems (I.e. Launching,Floating, Skidding, Lifting orRotating) Web Info Sharing Showcase/Demo Projects Lead: B. Tang & B. Brecto Prefabricated Bridge SystemsSTIP -3 Superstructure Systems Poutre Dalle – or Inverted T-Beam Obtain sample drawings,specifications and post on Web Compile and enhance details Solicit demo projects Lead: D. Dorgan & G. Calvert Prefabricated Bridge SystemsSTIP -4 Partial Depth Concrete DecksPrefabricated on Steel orConcrete Beams Obtain sample drawings andspecifications and post on web Solicit 2 demo projects Lead: D. Dorgan, G. Calvert &W. McEleney Prefabricated Bridge SystemsSTIP -5 U-shaped SegmentalBeams with Ribs Obtain sample drawingsand specifications Provide info to ASBI Lead: W. Nickas & S.Bhide . Bridge SystemsSTIP -5 U-shaped SegmentalBeams with Ribs Obtain sample drawingsand specifications Provide info to ASBI Lead: W. Nickas & S.Bhide Prefabricated. B/Yr.) Prefabricated Bridge SystemsTHE FUTURE IS HERE! 2005 FHWA Prefab Workshop, San Diego,CA; December 14-16, 2005www.acceleratedbridge.com http://www.fhwa.dot.gov/bridge/index.htm

Ngày đăng: 06/09/2012, 14:25

TỪ KHÓA LIÊN QUAN

w