Tài liệu Case Study - Tidel park - Built on strong fiber pdf

Tài liệu Case Study - Tidel park - Built on strong fiber pdf

Tài liệu Case Study - Tidel park - Built on strong fiber pdf

... guarantee future-proof technology in Tidel Park - Built on Strong Fiber TIDEL PARK “The Tidel Park project is special for various reasons. The network design had many features that distin- guished ... been using only single-mode fiber for such applications. Consider VSNL. The telecom giant has built its backbone on the Tidel Park premises and used single-mode...
Ngày tải lên : 10/12/2013, 03:15
  • 8
  • 402
  • 1
Tài liệu Case Study - Tidel park - Built on strong fiber ppt

Tài liệu Case Study - Tidel park - Built on strong fiber ppt

... been using only single-mode fiber for such applications. Consider VSNL. The telecom giant has built its backbone on the Tidel Park premises and used single-mode fiber, without con-forming to ... that guarantee future-proof technology in Tidel Park - Built on Strong Fiber TIDEL PARK product of bandwidth and length (BXL) and lower attenuation. The smaller diamete...
Ngày tải lên : 10/12/2013, 03:15
  • 8
  • 467
  • 1
Tài liệu Case study - PBE - Utah University pptx

Tài liệu Case study - PBE - Utah University pptx

... Toll Free: 1-8 0 0-3 6 6-3 891 • Outside of North America: + 1-9 5 2-9 3 8-8 080 Fax: + 1-9 5 2-9 1 7-3 237 • For a listing of ADC’s global sales office locations, please refer to our web site. CASE STUDY MEETING ... the evaluation it was the best end-to-end cabling solution for all of our criteria. The new Engineering Building was our very first all-TrueNet application...
Ngày tải lên : 09/12/2013, 16:15
  • 4
  • 391
  • 0
Tài liệu Case Study - PBE - Utah State University pdf

Tài liệu Case Study - PBE - Utah State University pdf

... settle on the best Category 6 (Cat 6) connectivity products for their needs and applications. After careful consider- ation of numerous options, the team selected the Cat 6 HighBand ® 25 termination ... Building The new engineering building was first all KRONE installation on cumpus Stephanie Roos, USU Telecommunications Technician Once the TrueNet end-to-end system was determined to be...
Ngày tải lên : 09/12/2013, 16:15
  • 4
  • 327
  • 0
Tài liệu Case Study - South Corp ppt

Tài liệu Case Study - South Corp ppt

... installing KRONE Premis NET Cat 5e and KRONE fibre solutions," said Byron Moult-Smith, Communications and Technology Support for Southcorp's South Australian and Victorian operations. "We ... KRONE Premis NET structured fibre optic system," said Mr Moult-Smith. From Left to Right: Gary Tennant - Installations Supervisor, Fibre and Data Networks; Neil Martin - Commu...
Ngày tải lên : 10/12/2013, 02:15
  • 2
  • 324
  • 0
Tài liệu Case Study - SRA Security Project pdf

Tài liệu Case Study - SRA Security Project pdf

... CASE study KRONE Australia 2 Hereford Street Berkeley Vale NSW 2261 PO Box 335 Wyong NSW 2259 Phone: 02 4388 4422 Fax: 02 4388 4499 Help Desk: 1800 801 298 Email: kronehlp@krone.com.au Web: ... were effectively used for security and crowd control. Cable Termination The TERMINATOR system is based on the KRONE Insulation Displacement Connection (IDC) technique which requires no stripping...
Ngày tải lên : 10/12/2013, 02:15
  • 2
  • 328
  • 0
Tài liệu Case Study - St Andrew Hospital pdf

Tài liệu Case Study - St Andrew Hospital pdf

... CASE study KRONE (Australia) Holdings Pty Limited 2 Hereford Street Berkeley Vale NSW 2261 PO Box 335 Wyong NSW 2259 Phone: 02 4389 5000 Fax: 02 4388 4499 Help Desk: 1800 801 298 Email: kronehlp@krone.com.au Web: ... kronehlp@krone.com.au Web: www.krone.com.au 6068 05/03 Throughput and Warranty a Healthy Solution for St Andrew’s St Andrew's War Memorial Hospital is using KRONE's...
Ngày tải lên : 10/12/2013, 02:15
  • 2
  • 386
  • 0
Tài liệu Case Study - Syncronesse doc

Tài liệu Case Study - Syncronesse doc

... Free: 1-8 0 0-3 6 6-3 891 • Outside of North America: + 1-9 5 2-9 3 8-8 080 Fax: + 1-9 5 2-9 1 7-3 237 • For a listing of ADC’s global sales office locations, please refer to our web site. CASE STUDY SYNCHRONICITY Like ... 10-gigabit standard on the horizon, we went to work developing a com- pletely new copper solution - CopperTen.” 10 GIGABITS AND BEYOND For year...
Ngày tải lên : 10/12/2013, 03:15
  • 4
  • 364
  • 0

Xem thêm