INDUSTRIAL VENTILATION Episode 5 pdf

The Hands-on Guide for Science Communicators - L. Christensen (Springer 2007) Episode 5 pdf

The Hands-on Guide for Science Communicators - L. Christensen (Springer 2007) Episode 5 pdf

... standard vector format. See the Glossary for more details. ã ã ã ã 78 THE HANDS-ON GUIDE FOR SCIENCE COMMUNICATORS approach is well suited to the European environment where the media are more ... yet. PRESS RELEASES 85 VISUAL COMMUNICATION Figure 23: A colour- enhanced picture of particle tracks in the Big European Bubble Chamber at CERN. CERN 88 THE HANDS-ON...
Ngày tải lên : 12/08/2014, 08:21
  • 20
  • 318
  • 0
INDUSTRIAL VENTILATION Episode 1 pps

INDUSTRIAL VENTILATION Episode 1 pps

... CHAPTER 1 INTRODUCTION 1- 1 SCOPE 1- 1 1- 2 PURPOSE OF CRITERIA 1- 1 1- 3 SPECIFIC PROCESSES 1- 1 CHAPTER 2 GENERAL REQUIREMENTS 2 -1 GENERAL CRITERIA 2 -1 2-2 COORDINATION 2 -1 2-3 DESIGN ... Handbook 10 03 /17 C, dated February 19 96. UFC 3- 410 -04N 25 October 2004 3 -1 FUNCTION 3 -1 3-2 OPERATIONAL CONSIDERATIONS 3 -1 3-2 .1 Airborne Contaminat...
Ngày tải lên : 12/08/2014, 16:20
  • 10
  • 312
  • 0
INDUSTRIAL VENTILATION Episode 3 pdf

INDUSTRIAL VENTILATION Episode 3 pdf

... (200) 38 (1.5) 38 (1.5) 38 (1.5) 51 (2.0) 51 (2.0) 38 (1.5) 38 (1.5) 38 (1.5) 38 (1.5) 38 (1.5) 38 (1.5) 51 (2.0) Adapted from: Hoffman Air and Filtration Systems, “Design of Industrial ... further details. 3- 5.8.1 Heating and Air Conditioning. If necessary, provide heating and cooling according to MIL-HDBK-10 03/ 3. 3- 7 UFC 3- 410-04N 25 October 2004 TABLE...
Ngày tải lên : 12/08/2014, 16:20
  • 10
  • 161
  • 0
INDUSTRIAL VENTILATION Episode 4 potx

INDUSTRIAL VENTILATION Episode 4 potx

... 4- 2 UFC 3 -41 0-04N 25 October 20 04 Figure 4- 4. MK -46 workbench hood. Figure 4- 5. MK -46 parts washer hood. 4- 4 UFC 3 -41 0-04N 25 October 20 04 c. Install an automatic ... floor. 4- 9 UFC 3 -41 0-04N 25 October 20 04 Figure 4- 1. Layout for the MK -46 fuel/defuel and afterbody breakdown room. Figure 4- 2. Series of hood in the...
Ngày tải lên : 12/08/2014, 16:20
  • 10
  • 203
  • 0
INDUSTRIAL VENTILATION Episode 5 pdf

INDUSTRIAL VENTILATION Episode 5 pdf

... standard mesh, or 5- 7 UFC 3-410-04N 25 October 2004 Figure 5- 4. Spray up booth. Figure 5- 5. Ventilated sink. 5- 5 UFC 3-410-04N 25 October 2004 Table 5- 1. Recommended ... (vapors) Workbench (Figure 5- 2) 0 .51 m/s (100) 1 Lay up (Vapors) Workbench/Floor Exhaust (Figure 5- 3) 0 .51 m/s (100) 1 Spray up (Vapors) Spray up Booth (Figure 5- 4) 0...
Ngày tải lên : 12/08/2014, 16:20
  • 10
  • 180
  • 0
INDUSTRIAL VENTILATION Episode 7 pot

INDUSTRIAL VENTILATION Episode 7 pot

... cell, at 77 degrees F (25 degrees C), will pass 0.24 amperes of charging current for every 100 ampere-hour cell capacity, measured at the 8-hour rate, when subject to an equalizing potential ... Chapter. 9-3.1 Walk-in Spray Paint Booths. The ventilation system for a walk-in booth is mainly to prevent fire and explosion. A well-designed ventilation system will also 9-1 UFC 3-410...
Ngày tải lên : 12/08/2014, 16:20
  • 10
  • 226
  • 0
INDUSTRIAL VENTILATION Episode 8 pdf

INDUSTRIAL VENTILATION Episode 8 pdf

... accordance with MIL-HDBK- 10 28/ 1, Aircraft Maintenance Facilities and the specific ventilation system design requirements in this Chapter. 10-3.1 Exhaust Air System. The ventilation system for ... Size each plenum take-off for no more than 2.44 m (8 ft) of plenum width (W). Size the exhaust plenum for a maximum plenum velocity of 5. 08 m/s (1,000 fpm). Size the replacement air...
Ngày tải lên : 12/08/2014, 16:20
  • 10
  • 279
  • 0
INDUSTRIAL VENTILATION Episode 9 ppsx

INDUSTRIAL VENTILATION Episode 9 ppsx

... Operation 29 CFR 191 0.107, Spray Finishing Using Flammable and Combustible Materials 29 CFR 191 0.134, Respiratory Protection 29 CFR 191 0.1000, Air Contaminants 29 CFR 191 0.1001, Asbestos, ... Hueneme, CA 93 043-4370 Commercial:(805) 98 2- 498 4, DSN: 551- 498 4, FAX:(805) 98 2-14 09 Internet: paulsonkm@nfesc.navy.mil Web Page: http://www.nfesc.navy.mil/enviro/...
Ngày tải lên : 12/08/2014, 16:20
  • 10
  • 344
  • 0
INDUSTRIAL VENTILATION Episode 10 ppsx

INDUSTRIAL VENTILATION Episode 10 ppsx

... Command (NAVFAC) assigned the NAVOSH Air Branch of NFESC to revise Military Handbook 100 3/17, Industrial Ventilation Systems. The handbook defines engineering design criteria for use by all ... of the aircraft farthest from the exhaust filter bank. Paint spray criteria in the ACGIH Industrial Ventilation Manual permits airflow in large spaces as low as 50 cubic feet per minute p...
Ngày tải lên : 12/08/2014, 16:20
  • 2
  • 150
  • 0
Intro to Differential Geometry and General Relativity - S. Warner Episode 5 pdf

Intro to Differential Geometry and General Relativity - S. Warner Episode 5 pdf

... similarly get (-cD 1 1 + D 1 4 ) 2 + (-cD 1 2 + D 2 4 ) 2 + (-cD 1 3 + D 3 4 ) 2 - c 2 (-cD 1 4 + D 4 4 ) 2 = 0 …(**) Noting that this only effects cross-terms, subtracting and dividing ... cannot expect vv vv to be a vector—that is, satisfy the correct transformation laws. But we do have a contravariant 4-vector T i = dx i dt (T stands for tangent vector. Also, remember...
Ngày tải lên : 12/08/2014, 16:20
  • 10
  • 234
  • 0
Liquid Process Piping Episode 5 pdf

Liquid Process Piping Episode 5 pdf

... (5. 5) 1 .52 (5. 0) 200 (8) 3. 35 (11.0) 3.20 (10 .5) 3. 05 (10.0) 2.74 (9.0) 1.83 (6.0) 1.68 (5. 5) 250 (10) 3 .51 (11 .5) 3. 35 (11.0) 3.20 (10 .5) 2.90 (9 .5) 1.98 (6 .5) 1.83 (6.0) 300 (12) 3.81 (12 .5) ... 1.07 (3 .5) 80 (3) 2.44 (8.0) 2.44 (8.0) 2.29 (7 .5) 2.13 (7.0) 1.37 (4 .5) 1.22 (4.0) 100 (4) 2 59 (8 .5) 2 59 (8 .5) 2 59 (8 .5) 2.29 (7 .5) 1 .52 (5. 0) 1.37 (4 .5) 150 (6...
Ngày tải lên : 12/08/2014, 16:20
  • 20
  • 375
  • 0
Maintenance of Petroleum Systems B Episode 5 pdf

Maintenance of Petroleum Systems B Episode 5 pdf

... reaches 55 psi. The air pressure setting on the HSV dictates the set point of < /b> the Brooks valve. The air pressure must be set 10 psi above the pressure relief setting required by the Brooks valve. ... Pump #1 failure. 6 .5. 7.2.1.2. Pump #2 failure. 6 .5. 7.2.1.3. Pump #3 failure. 6 .5. 7.2.1.4. Pump #4 failure. 6 .5. 7.2.1 .5. System 1 fault. 6 .5. 7.2.1.6. System 2 fault. 6 ....
Ngày tải lên : 12/08/2014, 16:20
  • 15
  • 278
  • 0
21st Century Manufacturing Episode 5 pdf

21st Century Manufacturing Episode 5 pdf

... Com- puter Integrated Manufacturing 12, no. 6: 52 5 -54 0. Woo, T. 1992. Rapid prototyping in CAD. Computer Aided Design 24: 403-404. Wright, P. K., and D. A. Bourne. 1988. Manufacturing intelligence. ... Computer Science Department, Stanford University, Baumgart, B. G. 19 75. A polyhedron representation for computer vision. NCC 75: 58 9 -59 6. Berners-Lee, T.1989. Information managemen...
Ngày tải lên : 13/08/2014, 04:23
  • 30
  • 207
  • 0
Dendrimers II Episode 5 pdf

Dendrimers II Episode 5 pdf

... IIb 322: 757 29. Buhleier E, Wehner W,Vögtle F (1978) Synthesis 155 30. Astruc D, Hamon JR,Althoff G, Roman E, Batail P,Michaud P, Mariot JP,Varret F, Cozak D (1979) J Am Chem Soc 101 :54 45 256 ... sensor since both Fe (II) and Fe(III) forms are stable enough for electro- chemical scanning without loss of reversibility. The principle is that the redox potential of the Fe (II/ III) redox s...
Ngày tải lên : 13/08/2014, 08:21
  • 31
  • 212
  • 1