7435 2 mov a 35h

Báo cáo y học: "Excess circulating angiopoietin-2 is a strong predictor of mortality in critically ill medical patients"

Báo cáo y học: "Excess circulating angiopoietin-2 is a strong predictor of mortality in critically ill medical patients"

Ngày tải lên : 25/10/2012, 10:31
... study These data reveal an important limitation for Ang -2 as a quantitative marker for vascular permeability: high Ang -2 might be a surrogate parameter for increased capillary permeability per ... multivariate Cox model In a large trauma cohort study [22 ], Ang2 correlated with mortality in a univariate analysis In a surgical population with ARDS, Ang -2 predicted death with a similar discriminatory ... Angiopoietin -2, marker and mediator of endothelial activation with prognostic significance early after trauma? Ann Surg 20 08, 24 7: 320 - 326 Gallagher DC, Parikh SM, Balonov K, Miller A, Gautam S, Talmor...
  • 9
  • 634
  • 0
Lập báo cáo nghiên cứu khả thi đầu tư xây dựng tuyến đường qua 2 điểm a-b

Lập báo cáo nghiên cứu khả thi đầu tư xây dựng tuyến đường qua 2 điểm a-b

Ngày tải lên : 06/12/2012, 17:03
... ma ớt, lng ma trung bỡnh hng nm l 300 mm Vo cỏc thỏng hố lng ma ln hn Hng giú ch yu nm l ụng Bc 10 11 12 Nhit 17 18 20 23 25 27 30 28 26 24 20 16 Lng ma 24 0 23 0 21 0 25 0 25 5 26 0 29 0 27 0 23 0 24 0 ... ax av av + ax K ' xC dc dc ax H H E tb =b.E tb Etb b daN/cm cm daN/cm daN/cm daN/cm E0 p D daN/cm2 2 1. 12 1.136 3 527 .77 7.77 0.034 0 .20 4 37 20 t=tav+tax=0 .20 4-0.03=0.174 daN/cm2
  • 103
  • 2.2K
  • 16
Lesson 1+2.Part A

Lesson 1+2.Part A

Ngày tải lên : 23/06/2013, 01:26
... không hợp lệ file bị x a (violet.vn/uploads/resources/479/1 823 7//bai1 %20 2.doc) Quay trở http://violet.vn ...
  • 2
  • 352
  • 0
ôn tập kỳ 2 10 A

ôn tập kỳ 2 10 A

Ngày tải lên : 05/08/2013, 01:26
  • 1
  • 283
  • 0
bài giải dự bị 2 khối A 2008

bài giải dự bị 2 khối A 2008

Ngày tải lên : 18/08/2013, 22:10
... AD ⊥ SI (đpcm) Trong (SBD) kẻ IH // BD (H ∈ AB) ⇒ IH ⊥ (SAB) IH AI AI AD SA2 a2 = = = = = BD AD AD SA + SD 3a ⇒ IH = a/ 3 a2 SSMB = 1 /2 SSAB = 1 a a a3 VMBSI = IH S SMB = = 3 36 M S C E B D ... (ASD) Trong (ASD) SJ ∩ AD = I ⇒ I = AD ∩ (SMN) Ba tam giác SAB,SAC,SBC tam giác vuông cân ⇒ SA,SB,SC đôi vuông góc ∆ ABC tam giác cạnh a BSCD hình vuông cạnh a  BD ⊥ SB ⇒ BD ⊥ ( SAB) ⇒ BD ⊥ SM ... ⇒ BD ⊥ SM   BD ⊥ SA A Lại có SM ⊥ AD nên SM ⊥ (ABD) ⇒ SM ⊥ AD (1)  BC ⊥ SD ⇒ BC ⊥ ( SAD) ⇒ BC ⊥ AD   BC ⊥ SA I H N J Mà MN// BC ⇒ MN ⊥ AD (2) Từ (1) (2) ⇒AD ⊥ (SMN) ⇒ AD ⊥ SI (đpcm) Trong...
  • 3
  • 626
  • 3
De du tru 2 Khoi A 2007 (co dap an)

De du tru 2 Khoi A 2007 (co dap an)

Ngày tải lên : 20/08/2013, 12:10
... N a A 3a2 3a2 = 16 C 60° M B 1 3a2 a3 Ta có VSABC = 2VSBAM = .BM.SSAM = a = 16 16 Gọi N trung điểm đoạn SA Ta có CN ⊥ SA ⇒ CN = a 13 (vì ∆SCN vuông N) 1 a a 13 a2 39 ⇒ SSCA = AS.CN = = 2 ... = 2 16 Ta có VSABC = a3 1 a2 39 = SSCA d ( B, SAC ) = d ( B, SAC ) 16 3 16 ⇒ d ( B,SAC ) = a 3 3a = a2 39 13 @ HÀ VĂN CHƯƠNG - PHẠM HỒNG DANH (Trung tâm Bồi dưỡng văn h a Luyện thi ... 1) ( 2x + 1)  ⇔ log4   = x > x +2   ⇔ 2x − x − = x > x +2 ⇔ 2x2 – 3x – = x > 1⇔ x = 2 Gọi M trung điểm BC SM ⊥ BC, S ∧ AM ⊥ BC ⇒ SMA = ( SBC, ABC ) = 60 o Suy ∆SMA có cạnh o Do SSMA = SM.AM...
  • 8
  • 915
  • 4
2 DE:A,B-DAP-MATRAN (KT 1TIET ANH 6 LAN 2)

2 DE:A,B-DAP-MATRAN (KT 1TIET ANH 6 LAN 2)

Ngày tải lên : 20/10/2013, 07:11
... is a factory, a temple and a restaurant [ There is a factory, a temple and a restaurant in the neighborhood.] 2/ We have geography, math and history on Wednesday 3/ Do you go to the bookstore after ... 1/ A plays B gets C has D goes 2/ A her B our C your D his 3/ A haves B eat C have D eats 4/ A watches B watchs C watch D watchse @@- True(T) or False (F) (0,5M) (Đúng hay sai ?) 1/ Her classes ... bed at half past ten @-Choose A, B, C or D to complete the passage.(1M) (Chọn A, B,C D để hồn thành văn) 1/ A gets B washes C has D goes 2/ A his B my C your D her 3/ A haves B have C eat D eats...
  • 6
  • 450
  • 3
Tài liệu Module 2: Designing a Workstation Installation and Upgrade Strategy ppt

Tài liệu Module 2: Designing a Workstation Installation and Upgrade Strategy ppt

Ngày tải lên : 10/12/2013, 15:15
... your organization have only a few standard hardware configurations, rather than many customized configurations Module 2: Designing a Workstation Installation and Upgrade Strategy 13 Advantages ... Professional are as follows: Manual Installation Methods Manual CD-ROM installation Manual over-the-network installation Automated Installation Methods Unattended Setup (Setup Manager) System Preparation ... installations Manual Manual Installation Installation Manual CD-ROM Installation Manual Over-theNetwork Installation Unattended Setup Sysprep Sysprep System Preparation Tool (Sysprep) Remote Installation...
  • 42
  • 650
  • 2
Tài liệu Activity 4.2: Creating a Logical Data Model ppt

Tài liệu Activity 4.2: Creating a Logical Data Model ppt

Ngày tải lên : 21/12/2013, 06:16
... actions that define the relationship between each pair of entities, and label the line with the relationship verb This is the initial ER diagram for the logical data model Answer in v04_160 9a_ act 42- 1.bmp ... v04_160 9a_ act 42- 1.bmp Activity 4 .2: Creating a Logical Data Model Exercise 2: Determining Cardinality and Existence In this exercise, you will use the syntax discussed in the module to identify the cardinality ... cardinality and existence characteristics of each of the relationships defined in Exercise ! Identify cardinality For each relationship on your ER diagram, ask the question “How many of the parent...
  • 4
  • 409
  • 0
Tài liệu Activity 6.2: Optimizing a Physical Data Design pptx

Tài liệu Activity 6.2: Optimizing a Physical Data Design pptx

Ngày tải lên : 17/01/2014, 09:20
... to the main SQL Server database daily Create a separate database and table for the client computers that only accept timesheet data Replicate this data to the main database as needed Management ... VChar 25 5 Date Int ClientID (PK) DInt Name Address1 Address2 City State Zip TypeID (PK) Int Is Classified As ∞ ∞ VChar 60 VChar 40 VChar 40 VChar 30 VChar 20 VChar 10 Activity 6 .2: Optimizing a ... situation has been identified as a performance problem by the database administrators, and they are requesting a fix as soon as possible (The field is already indexed.) Solutions can vary Denormalize...
  • 4
  • 324
  • 0
Tài liệu CCIE Lab Scenario 2 Configuring A Terminal Server ppt

Tài liệu CCIE Lab Scenario 2 Configuring A Terminal Server ppt

Ngày tải lên : 18/01/2014, 04:20
... CertificationZone Page of Terminal_Server #conf t Terminal_Server (config)#interface loopback Terminal_Server (config-if)#ip address 1.1.1.1 25 5 .25 5 .25 5 .25 5 The next step is to create an IP host table ... octopus cable has each port marked on the octopus cable Since a 25 09 only has eight console plugs, the corresponding reverse Telnet ports are numbered 20 01 -20 08 A 25 11 would use ports 20 01 -20 16 We ... subnet-zero ! interface Loopback0 ip address 1.1.1.1 25 5 .25 5 .25 5 .25 5 ! interface Ethernet0 no ip address shutdown ! interface Serial0 no ip address shutdown ! interface Serial1 no ip address shutdown...
  • 4
  • 273
  • 0
Tài liệu Module 2: Choosing a Migration Path to Windows 2000 Active Directory doc

Tài liệu Module 2: Choosing a Migration Path to Windows 2000 Active Directory doc

Ngày tải lên : 18/01/2014, 05:20
... and how data is moved and shared throughout the organization It identifies data-management policies, information origination, data ownership, and patterns of information consumption and production ... physical connectivity, and available bandwidth between them will also assist you in making appropriate installation decisions as they pertain to replication In addition, you should document statically ... environment User access to data and resources should be maintained during and after the migration User access to applications should be maintained during and after the migration The user’s familiar environment...
  • 28
  • 516
  • 0
Tài liệu BÀI TẬP LỚN SỐ 2 - ĐỀ A doc

Tài liệu BÀI TẬP LỚN SỐ 2 - ĐỀ A doc

Ngày tải lên : 19/01/2014, 15:20
... LIỆU A PA 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Quy luật gia tốc a b c d a b c d a b c d a b c d a b c d a b c d a b c d a b c d a b c d a ... gia Tp Hồ Chí Minh SỐ LIỆU B PA 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Quy luật gia tốc a b c d a b c d a b c d a b c d a b c d a b c d a ... d a b c d a b c d a b c d a b c d a b c d a b c d a b c d β (0 ) 10 10 10 10 12 12 12 12 14 14 14 14 16 16 16 16 18 18 18 18 20 20 20 20 22 22 22 22 20 20 20 20 18 18 18 18 16 16 16 16 ϕdi = ϕve...
  • 4
  • 1K
  • 4
Luận văn Thiết kế đường ô tô qua 2 điểm A-B

Luận văn Thiết kế đường ô tô qua 2 điểm A-B

Ngày tải lên : 24/01/2014, 00:12
... xe B H F G Pw M -21 1.8 1. 62 2.33 1875 12. 92 Maz-500 2. 65 2. 43 5.15 1 422 5 85.60 Kraz -25 7 2. 65 2. 43 5.15 19800 85.60 Kraz257 2. 65 2. 43 5.15 320 00 85.60 kéo mc Laz-695E 2. 52 2. 92 5.89 10775 81.51 ... 24 05.49 23 .30 11.9 24 17.30 23 .00 82. 7 100 100 100 100 25 00 26 00 27 00 28 00 29 00 24 .00 24 .50 24 .50 24 .00 23 .5 95.09 29 95.09 23 .00 4.91 100 100 100 3000 3100 320 0 3300 23 .30 26 .26 29 .61 32. 98 87.71 ... 20 0 26 8.80 300 400 500 600 700 800 900 1000 1100 120 0 127 8.04 1300 13 62. 88 1400 1449. 12 1500 1600 1700 1800 1863.45 1900 20 00 21 00 22 00 22 43.56 23 00 24 00 24 56.64 25 00 26 00 26 69. 72 2700 28 00 28 64.31...
  • 148
  • 1.4K
  • 0
Tài liệu Module 2: Planning a Data Center Environment docx

Tài liệu Module 2: Planning a Data Center Environment docx

Ngày tải lên : 24/01/2014, 10:20
... that emphasizes quality hardware and software, standardized configuration, and testing Facilities Manageable, available, and secure facilities Why is a data center culture important? The data ... documentation Technology that emphasizes quality hardware and software, standardized configuration, and testing Manageable, available, and secure facilities Module 2: Planning a Data Center ... several aspects of the physical plant to make sure that you have eliminated any single point of failure Areas that must be covered are physical manageability of the facility, physical availability,...
  • 26
  • 487
  • 3