Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống
1
/ 20 trang
THÔNG TIN TÀI LIỆU
Thông tin cơ bản
Định dạng
Số trang
20
Dung lượng
389,39 KB
Nội dung
beginning assertion time of the not-yet-approved parent. We
are working on the problem as this book goes to press. We know
that the problem is not insoluble. But we also know that it is
difficult.
Glossary References
Glossary entries whose definitions form strong interdep-
endencies are grouped together in the following list. The same
glossary entries may be grouped together in different ways at
the end of different chapters, each grouping reflecting the
semantic perspective of each chapter. There will usually be
several other, and often many other, glossary entries that are
not included in the list, and we recommend that the Glossary
be consulted whenever an unfamiliar term is encountered.
We note, in particular, that the nine terms used to refer to the
act of giving a truth value to a statement, listed in the section
The Semantics of Deferred Assertion Time,
are not included
in this
list. Nor are nodes in our Allen Relationship taxonomy or our
State Transformation taxonomy included in this list.
12/31/9999
clock tick
closed-open
Now()
Allen relationships
approval transaction
assertion group date
deferred assertion group
deferred assertion
deferred transaction
empty assertion time
fall into currency
fall out of currency
far future assertion time
near future assertion time
override
lock
retrograde movement
Asserted Versioning Framework (AVF)
assertion begin date
assertion end date
assertion time period
Chapter 12 DEFERRED ASSERTIONS AND OTHER PIPELINE DATASETS 285
assertion time
assertion
closed assertion
conventional table
dataset
episode
open episode
statement
hand-over clock tick
instance
type
managed object
object
oid
persistent object
thing
occupied
represented
match
replace
supercede
withdraw
pipeline dataset
inflow pipeline dataset
inflow pipeline
outflow pipeline dataset
outflow pipeline
production data
production database
production dataset
production table
row creation date
temporal dimension
temporal entity integrity (TEI)
temporal foreign key (TFK)
temporal referential integrity (TRI)
the standard temporal model
286 Chapter 12 DEFERRED ASSERTIONS AND OTHER PIPELINE DATASETS
transaction table
transaction time
version
effective begin date
effective end date
effective time period
Chapter 12 DEFERRED ASSERTIONS AND OTHER PIPELINE DATASETS 287
13
RE-PRESENTING INTERNALIZED
PIPELINE DATASETS
CONTENTS
Internalized Pipeline Datasets 292
Pipeline Datasets as Queryable Objects 296
Posted History: Past Claims About the Past 297
Posted Updates: Past Claims About the Present 298
Posted Projections: Past Claims About the Future 299
Current History: Current Claims About the Past 300
Current Data: Current Claims About the Present 301
Current Projections: Current Claims About the Future 303
Pending History: Future Claims About the Past 304
Pending Updates: Future Claims About the Present 305
Pending Projections: Future Claim s About the Future 306
Mirror Images of the Nine-Fold Way 307
The Value of Internalizing Pipeline Datasets 308
Glossary References 309
In Chapter 12, we introduced the concept of pipeline
datasets.
These are
files, tables or other physical dataset s in which the
managed object itself represents a type and contains multiple
managed objects each of which represents an instance of that
type, and which in turn themselves contain instances of other
types. Using the language of tables, rows and columns, these
managed objects are tables, the instances they contain are rows,
and those last-mentioned types are the columns of those tables,
whose instances describe the properties and relationships of the
objects represented by those rows.
Because our focus is temporal data management at the level
of tables and rows, and not at the level of databases, we have
discussed pipeline datasets as though there were a distinct set
of them for each production table. Figure 13.1 sho
ws one con
-
ventional table, and a set of eight pipeline datasets related to it.
Managing TimeinRelational Databases. Doi: 10.1016/B978-0-12-375041-9.00013-3
Copyright
#
2010 Elsevier Inc. All rights of reproduction in any form reserved. 289
What Figure 13.1 illustrates is a simplification of the always
complex and usually messy physical database environment
which IT departments everywhere must manage. Pipeline
datasets may often contain data targeted at, or derived from,
several tables within that database. They do not necessarily tar-
get, or derive from, single tables within a database. In addition,
the IT industry has only the broadest of categories of pipeline
datasets, categories such as batch transaction tables, logfiles of
processed transactions, history tables, or staging areas where
unusually complicated data transformations are carried out
before the data is moved back into the production tables from
whence it originated.
Figure 13.1 shows eight different types of pipeline datasets
surrounding a conventional table of current data. These nine
datasets align with the set of nine categories of temporal data
which we introduced in Chapter 12.
Given a bi-temporal framework of two temporal dimensions,
i
n each
of which data can exist in the past, the present or the
future, this set of nine categories is what results from the intersec-
tion of those two temporal dimensions. In addition, since the
past, present and future are clear and distinct within each tempo-
ral dimension, and since each dimension is clear and distinct
from the other, the result of this intersection is a set of nine
categories which are themselves clear and distinct, which are, pre-
cisely, jointly exhaustive and mutually exclusive. Like our
taxonomies, they cover all the ground there is to cover, and they
don’t overlap. Like our taxonomies, they are what mathematicians
call a partitioning of their domain. Like our taxonomies, they
Posted History
Pending History
Current History
A Conventional Table
Current Data
Posted Updates
Pending Updates
Posted Projections
Pending Projections
Current Projections
Figure 13.1 Physically Distinct Pipeline Datasets.
290 Chapter 13 RE-PRESENTING INTERNALIZED PIPELINE DATASETS
assure us that in our discussions, we won’t overlook anything and
we won’t confuse anything with anything else.
In the previous chapter, we showed how to physically inter-
nalize one particular kind of pipeline dataset within the produc-
tion tables which are their destinations or points of origin. We
showed how to turn them from distinct physical collections of
data into logical collections of data that share residence in a
single physical table.
The internalization of pipeline datasets is illustrated in
Figure 13.2.
These internalizations
of pipeline datasets are not
themselves managed objects to either the operating system or
the DBMS. They are managed objects only to the AVF. The
operating system recognizes and manages database instances,
but is neither aware of nor can manage tables, rows, columns
or the other managed objects that exist within database
instances. As for the DBMS, once these pipeline datasets are
internalized, all it sees is the production table itself, and the
columns and rows of that table.
In this chapter, we show how to r
e-present these
internalized
datasets as queryable objects. We use the hyphenated form
“re-present” advisedly. We do mean that we will show how to
represent those internalized datasets as queryable objects, in
the ordinary sense of the word “represent”. But we also wish to
emphasize that we are re-presenting, i.e. presenting again, things
whose presence we had removed.
1
Those things are the physical
An Asserted Version Table
Posted History
Posted Updates
Current Data
Current History Pending History
Pending Updates
Posted Projections Current Projections Pending Projections
Figure 13.2 Internalized Pipeline Datasets.
1
We also wish to avoid confusion with our technical term represent, in which an object,
we say, is represented in an effective time clock tick within an assertion time clock tick
just in case business data describing that object exists on an asserted version row
whose assertion and effective time periods contain those clock tick pairs.
Chapter 13 RE-PRESENTING INTERNALIZED PIPELINE DATASETS 291
pipeline datasets which, in the previous chapter, we showed how
to internalize within the production tables which are their
destinations or points of origin.
For example, we show how to provide, as queryable objects, all
th
e pen
ding transactions against a production table, or a logfile of
posted transactions that have already been applied to that table,
or a set of data from that table which we currently claim to be
true, or that same set of data but as it was originally entered
and prior to any corrections that may have been made to it.
We do not claim that any of these eight types of pipeline
dataset correspond to data that supports a specific business
need. For the most part, that will not be the case. For example,
auditors will frequently want to look at Posted History pipeline
datasets, i.e. at the rows that belong to that logical category
of temporal data. But they will usually want to see current
assertions about the historical past of the objects they are inter-
ested in, along with those past assertions. The current assertions
about historical data are logically part of, as we will see, the
Posted Updates pipeline dataset. So to provide queryable objects
corresponding to their specific business requirements, auditors
will usually write queries directly against asserted version tables,
queries that combine and filter data from any number of these
pipeline datasets.
To take another example, the Pending Projections pipeline
dataset does not distinguish data in the near assertion time
future from data in the far assertion time future. Yet deferred
assertions with an assertion begin date that will become current
an hour from now serve an entirely different business purpose
than deferred assertions whose assertion begin date is January
1
st
, 5000. So to provide queryable objects corresponding to real
business requirements, we will often have to write queries that
filter out rows from within a single pipeline dataset, and com-
bine rows from multiple pipeline datasets.
Internalized Pipeline Datasets
We can say what things used to be like, what they are like, and
also what they will be like. These statements we can make are
statements about, respectively, the past, the present and the
future. In a table in a databas e, each row makes one such state-
ment. In conventional tables, however, the only rows are ones
that make statements about the present.
These things we say represent what we claim is true. Of
course, as we saw in Chapter 12, we can equally well say that
292 Chapter 13 RE-PRESENTING INTERNALIZED PIPELINE DATASETS
they represent what we accept as true, agree is true, assent to or
assert as true, or believe, know or think is true. For now, we’ll just
call them our truth claims, or simply our claims, about the
statements made by rows in our tables.
Besides what we currently claim is true, there are also claims
that we once made but are no longer willing to make. These
are statements that, based on our current understanding of
things, are not true, or should no longer be considered as reli-
able sources of information. It is also the case that we may have
statements—whether about the past, the present or the future—
that we are not yet willing to claim are true, but which none-
theless are “works in progress” that we intend to complete and
that, at that time, we will be willing to claim are true. Or perhaps
they are complete, and we are pretty certain that they are cor-
rect, but we are waiting on a business decision-maker to review
them and approve them for release as current assertions. The
former is a set of transactions about to be applied to the data-
base. The latter is a set of data in a staging area, either waiting
for additional work to be performed on it, or waiting for review
and approval.
So if statements may be about what things were, are or will
be like, and claims about statements may have once been made
and later repudiated, or be current claims, or be claims that
we are not yet willing to make but might at some timein the
future be willing to make, then the intersection of facts and
claims creates a matrix of nine temporal combinations. That
matrix is shown in Figure 13.3.
2
what things
used to be like
what we used to claim
what we used to claim
things used to be like
what we currently claim
things used to be like
what we will claim things
used to be like
what we will claim things
are like now
what we will claim things
will be like
what we currently claim
things are like now
what we currently claim
things will be like
what we used to claim
things are like now
what we used to claim
things will be like
what we currently claim what we will claim
what things
are like
what things
will be like
Figure 13.3 Facts, Claims and Time.
2
With the substitution of the word “claims” for “beliefs”, this is the same matrix shown
in Figure 12.1. Chapter 12 also contains a discussion of the interchangeability of
“claims”, “beliefs” and several other terms. We note, however, that “claims” is a
stronger word than “beliefs” in this sense, that some of the things we believe are
true are things we are nonetheless not yet willing to claim are true. We take “claims”,
and “asserts” or “assertions”, to be synonymous, and the other equivalent terms
discussed in Chapter 12 to be terminological variations that appear more or less
suitable in different contexts.
Chapter 13 RE-PRESENTING INTERNALIZED PIPELINE DATASETS 293
The reason we are interested in the intersection of facts and
claims is that rows in database tables are both. All rows in data-
base tables represent factual claims. One aspect of the row is
that it represents a statement of fact. The other aspect is that it
represents a claim that that statement of fact is, in fact, true. This
is just as true of conventional tables as it is of asserted version
tables.
When dealing with periods of time, as we are, the past
includes all and only those periods of time which end before
Now(). The future includes all and only those periods of time
which begin after Now(). The present includes all and only those
periods of time which include Now().
Every row in a bi-temporal table is tagged with two periods
of time, which we call assertion time and effective time. Conse-
quently, every row falls into one of these nine categories. Con-
ventional tables contain rows which exist in only one of these
nine temporal combinations. They are rows which represent
current claims about what things are currently like. But since
conventional tables do not contain any of the othe r eight
categories of rows, their rows don’t need explicit time periods
to distinguish them from rows in those other categories. And in
conventional tables, of course, they don’t have them.
Both the assertion and the effective time periods of conven-
tional rows are co-extensive with their physical presence in their
tables. They begin to be asserted, and also go into effect, when
they are created; and they remain asserted, and also remain in
effect, until they are deleted. They don’t keep track of history
because they aren’t interested in it. They don’t distinguish
updates whi ch correct mistakes in data from updates which keep
data current with a changing reality, ultimately because the busi-
ness doesn’t notice the difference, or is willing to tolerate the
ambiguity in the data.
So conventional tables, all in all, are a poor kind of thing.
They do less than they could, and less than the business needs
them to do. They overwrite history. They don’t distinguish
between correcting mistakes and making changes to keep up
with a changing world. And these conventional tables, as we all
know, make up the vast majority of all persistent object tables
managed by IT departments.
We put up with tables like these because the IT profession
isn’t yet aware that there is an alternative and because, by dint
of hard work, we can make up for the shortcomings of these
tables. Data which falls into one of the other eight categories
can usually be found somewhere, or reconstructed from data
that can be found somewhere. If all else fails, DBMS archives
294 Chapter 13 RE-PRESENTING INTERNALIZED PIPELINE DATASETS
and backups, and their associated transaction logs, will usually
enable us to recreate any state that the database has been in.
They will allow us to re-present six of the nine temporal
categories we have identified.
3
The three categories that cannot be re-presented from
backups and logfiles are the three categories of future claims—
things we are going to make our databases say (unless we
change our minds) about what things once were like, or are like
now, or may be like in the future. Future claims often start out as
scribbled notes on someone’s desk. But once inside the machine,
they exist in transaction datasets, in collections of data that are
intended, at some time or other, to be applied to the database
and become currently asserted data.
In the previous chapter, we called the eight categories of
data which are not current claims about the present, pipeline
datasets, collections of data that exist at various points along
the pipelines leading into production tables or leading out from
them. As phys ically separate from those production tables, these
collections of data are general ly not immediately available for
business use. Usually, IT technical personne l must do some work
on these physical files or tables before a business user can query
them for information.
This takes time, and until the work is complete, the informa-
tion is not available. By the time the work is complete, the busi-
ness value of the information may be much reduced. This work
also has its costs in terms of how much time those technicians
must spend to prepare that data to be queried. In addition, even
without special requests for information in them, these physical
datasets, taken together, constitute a significant management
cost for IT.
With multiple points of rest in the pipelines leading into and
out of production databa se tables, there are multiple points at
which data can be lost. For example, data can be accidentally
deleted before any copies are made. For datasets in the inflow
pipelines, and which have not yet made it into the da tabase
itself, the only recourse for lost data is to reacquire or recreate
the data. If prior datasets in the pipeline have already been
3
That’s the idea, anyway. In reality, this “data of last resort” isn’t always there when
we go looking for it. Backups and logfiles are rarely kept forever, so the data we need
may have been purged or written over. There will inevitably be occasional intervals
during which the system hiccupped, and simply failed to capture the data in the first
place. If the data is still available, it might not be in a readily accessible format because
of schema changes made after it was captured.
Chapter 13 RE-PRESENTING INTERNALIZED PIPELINE DATASETS 295
[...]... a second time, down the pipeline And this risk is quite real because, prior to making it into the database, the backups and logfiles which protect data once it has reached the DBMS are not yet available By internalizing these datasets within the production tables whose data they contain, we eliminate the costs of managing them, including the costs of recovering from mistakes made inmanaging them We... as of some point in past effective time, those reports will reflect all corrections made to that data since that time Queries supporting specific business requests for information can, of course, be written against these internalizations of pipeline datasets For example, if we are interested only in 2009’s historical data, as we currently claim that data to be, we can issue a query against this view... eff_beg_dt Now() In the original non-temporal table, there was one row per object Since each oid uniquely identifies an object, and since there can only be one row for each object that is currently asserted as being currently in effect, this view also contains one row per object In addition, since, at every point in time, the original table contains rows that represent what we currently... RE-PRESENTING INTERNALIZED PIPELINE DATASETS legitimately deleted (legitimately because the data had successfully made it to the next downstream point), then we may have to go all the way back to the original point at which the data was first acquired or created This can impose significant delays in getting the data to its consumers, and significant costs in reacquiring or recreating it and in moving it,... those rows in an asserted version table which lie in the assertion time present and also in the effective time present Its subject matter is things 301 302 Chapter 13 RE-PRESENTING INTERNALIZED PIPELINE DATASETS as they are now Its rows are claims about these things which we currently make Current Data is what most of our database tables contain It is a record of what we currently believe things are... to a point in time, and so both time periods must be included on all rows in the view The unique identifier for this or for any other bi-temporal view of an asserted version table, is the combination of oid, assertion time period and effective time period Because Asserted Versioning manages the two pairs of dates as PERIOD datatypes, either or both can be used to represent the time period So, in an... making actionable statements A simple example of a current projection is a version that shows a change in a policy’s copay amount that will go into effect next month The version exists in current assertion time but in future effective time Pending History: Future Claims About the Past The Pending History dataset consists of all those rows in an asserted version table which lie in the assertion time. .. to claim what things what we used to claim used to be like things used to be like what things are like what things will be like Figure 13.4 Posted History what we currently claim what we will claim 297 298 Chapter 13 RE-PRESENTING INTERNALIZED PIPELINE DATASETS This is important to know when creating indexes for performance, as described in Chapter 15 Any report about the effective -time past can be... dataset consists of all those rows in an asserted version table which lie in the assertion time past but in the effective time present Its subject matter is things as they currently are Its rows are claims about these things which we are no longer willing to make Posted Updates are a record of all the times we got it wrong about what is now the present, up to but not including our current claims about that... Chapter 13 RE-PRESENTING INTERNALIZED PIPELINE DATASETS Posted Projections: Past Claims About the Future The Posted Projections dataset consists of all those rows in an asserted version table which lie in the assertion time past but in the effective time future Its subject matter is things as they might have turned out to be Its rows are claims about these things which we are no longer willing to make Posted . within the production tables
whose data they contain, we eliminate the costs of managing
them, including the costs of recovering from mistakes made in
managing. currently
asserted as being currently in effect, this view also contains
one row per object. In addition, since, at every point in time,
the original table contains rows