OptiX OSN 3500
Installation Manual Contents
8.1 FiberJumpers 2
8.2 InstallingandRouting External FiberJumpers 4
10.1.2 TheFiber Hole and Corrugated Pipe 4
10.1.3 Procedure for Upward Cabling 5
10.1.4 Procedure for Downward Cabling 8
10.2 InstallingandRouting Internal FiberJumpers 10
10.2.1 RoutingFiberJumpers Between Boards 10
10.2.2 RoutingFiberJumpers Between the Subrack and COA 13
10.3 Checking theFiber Jumper Installation 15
Issue 05 (2006-11-20)
Huawei Technologies Proprietary
i
!"
#$
% !&
!'
!()#
T2-0416xx-
20050330-C-
1.20
Huawei
Technologies
Proprietary
iii
OptiX OSN 3500
Installation Manual 10 InstallingandRoutingFiber Jumpers
#*
Note
Remove the side doors andthe front door before installingandrouting cables.
Reinstall all these doors after installingandrouting all cables and fibers. Refer to
Chapter 12 "Installing the Doors of the Cabinet".
This chapter guides you to install and route fiber jumpers.
The fiberjumpers of the OptiX OSN 3500 are divided into internal fiberjumpers
and external fiber jumpers.
Internal fiberjumpers are used for connecting optical interfaces within a cabinet.
While external fiberjumpers are used for connecting optical interfaces of a
cabinet with those of other cabinets or peripherals.
The following table lists the contents of this chapter.
+ %
8.1Fiber Jumpers Describes the connectors and types of thefiber jumpers.
8.2Installing andRouting
External Fiber Jumpers
Describes how to install and route the external fiber
jumpers.
10.2Installing andRouting
Internal Fiber Jumpers
Describes how to install and route the internal fiber
jumpers.
10.3Checking theFiber
Jumper Installation
Describes the check points of fiber installation.
Issue 05 (2006-11-20)
Huawei Technologies Proprietary
1
10 InstallingandRoutingFiber Jumpers
OptiX OSN 3500
Installation Manual
,
The fiberjumpers are used to connect the optical boards on one subrack with
those in other cabinets or other equipment. All fiberjumpers can be transferred by
an external optical distribution frame (ODF).
Figure 1.1 shows the connectors used for the OptiX OSN 3500.
Protective cap
FC/PC connector
LC/PC connector
SC/PC connector
Protective cap
Protective cap
Figure 1.1 Fiber connectors
2
Huawei Technologies Proprietary
Issue 05 (2006-11-20)
OptiX OSN 3500
Installation Manual 10 InstallingandRoutingFiber Jumpers
Caution
The optical interfaces of the SLT1/SLO1/R1SLQ1/R1SL4/R1SLD4/R1SL1
cannot be connected with a fixed optical attenuator. The “OUT” optical interfaces
of all Optical boards cannot be connected with a fixed optical attenuator.
Issue 05 (2006-11-20)
Huawei Technologies Proprietary
3
10 InstallingandRoutingFiber Jumpers
OptiX OSN 3500
Installation Manual
,
This section describes the procedure to install and route external fiber jumpers.
The corrugated pipe is used to protect the fibers between the cabinet andthe ODF.
*/0
*/
There are fiber holes on the top and bottom of the cabinet. Route thefiber jumpers
through thefiber holes.
Figure 1.1 and Figure 1.2 show thefiber holes.
Fiber hole Fiber hole
Figure 1.1 Fiber holes on the top of the cabinet
Fiber holeFiber hole
Figure 1.2 Fiber holes on the bottom of the cabinet
*0
When routingfiberjumpers outside the cabinet, a corrugated pipe or a winding
pipe must be added for protecting thefiber jumpers.
One corrugated pipe can contain 12–15 pieces of fiber jumpers. One 12 mm
winding pipe can wind thirty pieces of fiber jumpers, while one 6 mm winding
4
Huawei Technologies Proprietary
Issue 05 (2006-11-20)
OptiX OSN 3500
Installation Manual 10 InstallingandRoutingFiber Jumpers
pipe can wind eighteen pieces.
In this section the corrugated pipe is taken as an example.
Appropriate length of the corrugated pipe is required. This length is the distance
from the cabinet to the ODF plus the length the pipe will extend into the cabinet
and the ODF (so long as thefiberjumpers do not touch the upper beam when
routing inside the cabinet).
10
0
This procedure guides you to connect and route thefiber
jumpers between the subrack andthe ODF.
*23
Corrugated pipe or winding pipe
Binding strap
Labels
04
The ODF in the equipment room has been installed
properly, with interfaces reserved for use.
42#
Required if thefiberjumpers are upward routed.
Caution
The bend radius of thefiber jumper must be greater than its minimum curvature
radius. Specifically, the minimum curvature radius for the 2 mm fiber jumper is
40 mm, and that for the 3 mm fiber jumper is 60 mm.
Note
Routing thefiberjumpers on the right of the cross-connect and timing board is
taken as an example in the description below. Routing on the left side is the same.
+ Attach temporary labels to both ends of thefiber jumpers.
+ Measure and cut the corrugated pipe and wrap the incision with adhesive tape to
protect thefiber jumpers.
+1 Route thefiber jumper through the corrugated pipe. It is forbidden to force the
fiber jumper in.
+ Route the corrugated pipe into the cabinet (3cm) through thefiber hole on the top
of the cabinet.
+5 Route thefiberjumpers downward along thefiber path on the right of the cabinet
and then into the subrack cabling trough. See Figure 1.1.
Issue 05 (2006-11-20)
Huawei Technologies Proprietary
5
10 InstallingandRoutingFiber Jumpers
OptiX OSN 3500
Installation Manual
Cable
distribution
plate
Subrack
cabling
trough
Fiber hole
Fiber path
Figure 1.1 Upward cabling for fiber jumpers
+" Route thefiberjumpers out of the subrack cabling trough.
+$ Take the protective cap off thefiber connector and clean thefiber connector with
special cleaning tissue. Keep the protective caps well for possible use in the
future.
+, Align thefiber connector against the optical interface and insert it in along the
slide rail with appropriate strength until you hear a click.
+& Coil the redundant fiberjumpers in thefiber spool box.
+ Trim thefiberjumpersand bundle them with binding straps. For details, refer to
Appendix E "Binding Strap for Fiber Jumpers". Do not bind thefiberjumpers too
6
Huawei Technologies Proprietary
Issue 05 (2006-11-20)
OptiX OSN 3500
Installation Manual 10 InstallingandRoutingFiber Jumpers
tight.
+ Install and route thefiberjumpers on the ODF side.
+ Remove the temporary labels on the cables.
+1 Fill in the labels referring to Appendix D "Engineering Labels for Cables".
+ Attach the labels 2 cm away from the connectors at the two ends. See Figure 1.1.
TO:
A03
33
33
33
33
Label
Fold to the
right
Fold upwards
Fiber jumper
Fiber jumper
Fiber jumper
Figure 1.1 Attaching a label
End
Issue 05 (2006-11-20)
Huawei Technologies Proprietary
7
10 InstallingandRoutingFiber Jumpers
OptiX OSN 3500
Installation Manual
0%
0
This procedure guides you to connect and route thefiber
jumpers between the subrack andthe ODF.
*23
Corrugated pipe or winding pipe
Binding strap
Labels
04
The ODF in the equipment room has been installed properly,
with interfaces reserved for use.
42#
Required if thefiberjumpers are downward routed.
Caution
The bend radius of thefiber jumper must be greater than its minimum curvature
radius. Specifically, the minimum curvature radius for the 2 mm fiber jumper is
40 mm, and that for the 3 mm fiber jumper is 60 mm.
Note
Routing thefiberjumpers on the right of the cross-connect and timing board is
taken as an example in the description below. Routing on the left side is the same.
+ Attach temporary labels to both ends of thefiber jumpers.
+ Measure and cut the corrugated pipe and wrap the incision with adhesive tape to
protect thefiber jumpers.
+1 Route thefiber jumper through the corrugated pipe. It is forbidden to force the
fiber jumper in.
+ Route the corrugated pipe into the cabinet (3cm) through thefiber hole on the
bottom of the cabinet.
+5 Route thefiberjumpers upward along thefiber path on the right of the cabinet and
then into the subrack cabling trough. See Figure 1.1.
8
Huawei Technologies Proprietary
Issue 05 (2006-11-20)
[...]... thefiber spool box is installed below the subrack and above the COA For details of thefiber spool box, refer to Chapter 8 "Installing theFiber Spool Box" For details of the COA, refer to Chapter 7 "Installing the COA and DCM" Note This section describes therouting of fiberjumpers at the left side of the crossconnect and timing board Therouting at the right side is the same 10.2.1 Routing Fiber. .. 10 Installing andRoutingFiberJumpers Step 11 Install and route thefiberjumpers on the ODF side Step 12 Remove the temporary labels on the cables Step 13 Fill in the labels referring to Appendix D "Engineering Labels for Cables" Step 14 Attach the labels 2 cm away from the connectors at the two ends End 10.2 InstallingandRouting Internal FiberJumpers This section guides you to install and. .. 10 Installing andRoutingFiberJumpersFiber path Subrack cabling trough Fiber hole Corrugated pipe Figure 1.1 Downward cabling for fiberjumpers Step 6 Route thefiberjumpers out of the subrack cabling trough Step 7 Take the protective cap off thefiber connector and clean thefiber connector with special cleaning tissue Keep the protective caps well for possible use in the future Step 8 Align the. .. Manual 10 Installing andRoutingFiberJumpers 10.2.2 RoutingFiberJumpers Between the Subrack and COA Purpose This procedure guides you to connect and route thefiberjumpers between the subrack andthe COA Tools/Materials Binding strap Labels Prerequisites The subrack and other devices are installed properly in the cabinet with interfaces reserved for use Required/As needed Required if the COA is... Manual 10 Installing andRoutingFiberJumpers 10.3 Checking theFiber Jumper Installation The following requirements should be met when thefiber jumper installation is completed: Issue 05 (2006-11-20) The labels are attached neatly at two ends of thefiber jumper, facing the same direction The contents on them are correct and clear The connection between thefiber jumper andthe optical... Manual 10 Installing andRoutingFiberJumpers Step 8 Route it through the orderwire fixing frame and then route it rightward along the cabling trough to the optical interface board at the other end See Figure 1.1 Power Distribution Unit Fiber spool box Orderwire frame Figure 1.1 Routingfiberjumpers between Boards Step 9 Align the connector of the other end against the optical interface, and insert... dragged with great force or bent forcibly Fiberjumpers are routed in a way convenient for maintenance and capacity expansion Routing of thefiberjumpers complies with the engineering design Thefiberjumpers are secured smoothly and interconnected reliably in the ODF The redundant fiberjumpers are coiled tidily There shall be no other cable or article on thefiberjumpers Huawei Technologies Proprietary... board or the flange is firm The connecting point for thefiber jumper is clean All fiberjumpers are nicely bundled in even spacing with appropriate tightness Fiberjumpers can be moved freely in the cable tie Fiberjumpers routed from the equipment to the ODF must be covered with a protective pipe Both ends of the protective pipe shall extend into the equipment or the ODF In routing, thefiber jumpers. .. Step 4 Insert thefiber jumper downward to the subrack cabling trough below the optical board and route it leftward Step 5 Lead thefiber jumper out of the subrack cabling trough then through the cabinet cabling channel, and route it upward through the orderwire fixing frame to thefiber spool box Step 6 Spool thefiberjumpers If the optical interface board is at the same side of the cross-connect... the same side of the crossconnect and timing board) (b) Without an attenuator (the source and destination of fiberjumpers are in different sides of the cross-connect and timing board) (d) With attenuators (the source and destination of fiberjumpers are in different sides of the cross-connect and timing board) Figure 1.1 Fiber spooling modes Step 7 Lead thefiber jumper out of thefiber spool box Issue . of the fiber jumpers.
8. 2Installing and Routing
External Fiber Jumpers
Describes how to install and route the external fiber
jumpers.
10. 2Installing and. 8
10.2 Installing and Routing Internal Fiber Jumpers 10
10.2.1 Routing Fiber Jumpers Between Boards 10
10.2.2 Routing Fiber Jumpers Between the Subrack and