1. Trang chủ
  2. » Kinh Doanh - Tiếp Thị

Tài liệu sievestation pdf

1 157 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 1
Dung lượng 58,2 KB

Nội dung

PB-Nr: R05.03.03 Machine instruction Sieve station Issued by Date of release Version Page Hr. Pfanzagl Oktober 2001 1 1/1 1 Line-up of the filter Boilers over filter place cell wheel air-lock switch on filter switch on boiler flap open filter, whereby it is to be made sure that the correct filter body is in the sieve jigger, is attached the bearing play flushing and is adjusted the prescribed operating pressure. With the filter discharge connecting piece a transparent bag is fastened with the quick-locking mechanism. With the over grain discharge a bag is fastened by means of bungee cords. 2 Cleaning For the cleaning of the sieve jigger the star-wheel feeder present over it is removed. The star-wheel feeder is blown off in the suction cab by means of compressed air. The strainer basket is taken from the sieve jigger and likewise blown off in the suction cab. The sieve jigger is cleaned by means of hand and material rags cleaned (if not given by the production manager differently) Following the surrounding field by means of vacuum cleaners, and assembled the sieve jigger again.

Ngày đăng: 18/01/2014, 16:20

TỪ KHÓA LIÊN QUAN

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN

w