Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống
1
/ 16 trang
THÔNG TIN TÀI LIỆU
Thông tin cơ bản
Định dạng
Số trang
16
Dung lượng
360 KB
Nội dung
OptiX OSN 3500 Installation Manual Contents Contents 1 BeforeYouStart .1 1.1 About the Equipment .2 1.2 Installation Flow 4 1.3 Required Documents and Tools .6 1.3.1 Required Documents .6 1.3.2 Required Tools and Metres 6 1.4 Checking Installation Conditions 7 1.5 Unpacking the Cabinet 7 1.6 Unpacking the Boards .11 1.7 Checking the Equipment .13 Issue 05 (2006-11-20) Huawei Technologies Proprietary i Figures Architecture of the OptiX OSN 3500 3 The OptiX OSN 3500 subrack 4 Installation flow .5 Straightening the tongues 9 Removing the cover .9 Removing the surrounding wooden boards 10 Board carton 12 Tables Figure 1.1Technical parameters of the cabinet and the subrack 2 Figure 1.2Tools and metres .6 Figure 1.3Check items 13 1 BeforeYouStart About This Chapter Note Beforeyou install the OptiX OSN 3500, we recommend reading OptiX OSN 3500 Intelligent Optical Transmission System Compliance and Safety Manual. This helps you to ensure a safe and smooth installation. This chapter describes the work you are required to do beforeyoustart the installation. Turn to the specific section for applicable tasks. The following table lists the contents of this chapter. Section Description 1.1About the Equipment Describes the cabinet and subrack. 1.2Installation Flow Describes the installation flow. 1.3Required Documents and Tools Describes the required documents, tools and metres. 1.4Checking Installation Condition Guides you to check the equipment room environment and grounding conditions. 1.5Unpacking the Cabinet Guides you to unpack the cabinet packing box and the board carton. 1.6Unpacking the Board 1.7Checking the Equipment Guides you to check the cabinet, subracks, boards, network management computer, and internal cables. 1 BeforeYouStart OptiX OSN 3500 Installation Manual 1.1 About the Equipment Figure 1.1 shows the technical parameters of the cabinet and the subrack. Figure 1.1 Technical parameters of the cabinet and the subrack Size (mm) Weight (kg) Cabinet 600 (Width) x 300 (Depth) x 2000 (Height) 55 600 (Width) x 600 (Depth) x 2000 (Height) 79 600 (Width) x 300 (Depth) x 2200 (Height) 60 600 (Width) x 600 (Depth) x 2200 (Height) 84 600 (Width) x 300 (Depth) x 2600 (Height) 70 600 (Width) x 600 (Depth) x 2600 (Height) 94 Subrack 497 (Width) x 295 (Depth) x 722 (Height) 23(no boards) Note: All dimensions are in mm. The following figure shows the directions of the width, the depth and the height W H D Figure 1.1 shows the architecture of the OptiX OSN 3500. The OptiX OSN 3500 consists of the following parts. Cabinet Subrack Power distribution unit Orderwire phone frame Cable distribution plate Fiber spool box 2 Huawei Technologies Proprietary Issue 05 (2006-11-20) OptiX OSN 3500 Installation Manual 1 BeforeYouStart 7 8 1 2 3 4 5 6 8 9 W H D 7 1. Power distribution unit 2. Side door 3. Cable distribution plate 4. Orderwire phone frame 5. Subrack 6. Cabinet 7. Fiber spool box 8. Plastic panel 9. Front door Figure 1.1 Architecture of the OptiX OSN 3500 Figure 1.2 shows the OptiX OSN 3500 subrack. Issue 05 (2006-11-20) Huawei Technologies Proprietary 3 1 BeforeYouStart OptiX OSN 3500 Installation Manual Fan area Mounting ear Fiber routing area W H D Figure 1.2 The OptiX OSN 3500 subrack 1.2 Installation Flow Correct installation flow is the key for ensuring a smooth, trouble-free installation. Figure 1.1 is the installation flow. 4 Huawei Technologies Proprietary Issue 05 (2006-11-20) OptiX OSN 3500 Installation Manual 1 BeforeYouStartStart Install cabinet on antistatic floor ? Yes Reinforce cabinets See Chapter 5 Install cabinet on antistatic floor See Chapter 3 Installation preparations See Chapter 1 Install components Install doors of the cabinet See Chapter 12 Install and route cables See chapter 9 End Install alarm cables See section 9.3 Install indicator cables See section 9.2 Install E1 cables See section 9.4 Install E3/T3/E4/STM-1 cables Install Ethernet cables See section 9.6 Install clock cables See section 9.5 See section 9.7 Install network cables See section 9.8 Install cabinet on cement floor See Chapter 4 NO Install fiber spool box See chapter 8 Install COA See chapter 7 Install cable distribution plate See chapter 6 Install and route fibre jumpers See Chapter 10 Install external fibres See section 10.2 Install internal fibres See section 10.3 Install power cables See section 9.1 Install subrack cables See section 9.9 Install orderwire phone See Chapter 11 Remove doors of the cabinet See Chapter 2 Figure 1.1 Installation flow Issue 05 (2006-11-20) Huawei Technologies Proprietary 5 1 BeforeYouStart OptiX OSN 3500 Installation Manual 1.3 Required Documents and Tools The following documents, tools and metres are required for the installation. 1.3.1 Required Documents The following documents are required before the installation. Written contracts and equipment configuration tables Construction files OptiX OSN 3500 Intelligent Optical Transmission System Installation Manual 1.3.2 Required Tools and Metres The party specified in the contract shall provide the special tools and instruments; and the installer, the general tools and instruments. Test and calibrate all instruments before use. The installation personnel shall offer the tools and metres required for the installation, which are listed in Figure 1.2. Figure 1.2 Tools and metres Measurement and lineation tools Fastening tools Metres Long measuring tape Ruler (1 m) Gradienter Marking pen Powder marker Pencil Straight screwdriver Cross screwdriver Socket wrench (M5) Ring spanner (M6) Double ring spanner Open-end wrench (10-12 metric) Multimetre Meg-ohmmeter Earth resistance tester BER tester Optical power metre SDH analysis metre Locksmith and drill tools Special tools Auxiliary tools Sharp-nose pliers Diagonal pliers Pincer pliers Electric hand drill File Hand saw Crowbar Rubber hammer Percussion drill Accessory drill bits Vacuum cleaner Electrostatic discharge (ESD) protection glove ESD wrist strap Torque spanner Wire stripper Cable clamp Clamp for crystal connector Wire punch down tool Optical attenuator Brush, nippers Paper knife Hand bellows Electric iron Solder wire Prong ladder 6 Huawei Technologies Proprietary Issue 05 (2006-11-20) OptiX OSN 3500 Installation Manual 1 BeforeYouStart 1.4 Checking Installation Conditions Before starting installation, make sure that the equipment room, power supply, ground wire, optical cables, and other materials are ready. When these installation conditions are confirmed, the installation may begin according to the pre-designed layouts. For detailed requirements and related items, refer to Appendix A "Operation Environment Requirements" and Appendix B "Equipment Grounding". 1.5 Unpacking the Cabinet Purpose This procedure guides you to unpack the cabinet. Tools /Materials Spanner Screwdriver Hammer Ejector lever Prerequisites The cabinet has been delivered to the installation site. Required/As needed Required. Warning The wooden case is direction-oriented and should not be placed upside down. Otherwise, fatal damages would be caused to the product. Since the cabinet is rather heavy, erecting the cabinet improperly may cause personal injuries. Caution During the transportation and handling of products, spare parts or components, make sure to avoid the collision of such things against doors, walls or shelves. Caution To avoid equipment damage in the course of moving, move the packing box to the equipment room or a place near the equipment room before unpacking. Issue 05 (2006-11-20) Huawei Technologies Proprietary 7 [...]... there are any differences, notify the local customer service center End 10 Huawei Technologies Proprietary Issue 05 (2006-11-20) OptiX OSN 3500 Installation Manual 1 BeforeYouStart 1.6 Unpacking the Boards Purpose This procedure guides you to unpack the boards from the board carton Tools /Materials ESD wrist strap or ESD glove Diagonal pliers Paper knife Prerequisites The board carton has been delivered... the board right after unpacking, place the board on an antistatic surface to discharge the static electricity If you are going to install the board at a later time, pack the board using the Huawei Technologies Proprietary Issue 05 (2006-11-20) OptiX OSN 3500 Installation Manual 1 BeforeYouStart original materials and place them at a cool dry place without direct sunshine or strong electromagnetic radiation... tongues that join the wooden boards around the wooden case Step 7 Remove the wooden boards See Figure 1.1 Issue 05 (2006-11-20) Huawei Technologies Proprietary 9 OptiX OSN 3500 Installation Manual 1 BeforeYouStart Figure 1.1 Removing the surrounding wooden boards Step 8 Take the cabinet out of the packing box Step 9 Remove the plastic packing of the cabinet and erect the cabinet Note At least three...OptiX OSN 3500 Installation Manual 1 BeforeYouStart Caution In the process of transporting, handling and installing the equipment, it is forbidden to reach the uncoated metal surface of equipment parts or components with sweaty or dirty gloves... operation Step 1 Cut the straps with diagonal pliers and use a paper knife to split the tape along the Issue 05 (2006-11-20) Huawei Technologies Proprietary 11 OptiX OSN 3500 Installation Manual 1 BeforeYouStart seam between the cover and the box body See Figure 1.1 Caution Do not cut too deep into the carton with the paper knife Otherwise, the knife might scratch the articles inside Pressure-sensitive... with your left hand Take the board out of the bag gently by its front panel with your right hand Do not touch any electronic component on the board surface to avoid damage Keep the bags properly Step 5 Check whether any board is physically damaged If any board damage is found, contact Huawei If not, put the board back into the board box and put the box in the place specified by the customer 12 If you. .. ejector lever to straighten the tongue See Figure 1.1 Or use a screwdriver or a hammer to operate the tongue 8 Huawei Technologies Proprietary Issue 05 (2006-11-20) OptiX OSN 3500 Installation Manual 1 BeforeYouStart Woodenboard Steeledge Tongue Spanner Figure 1.1 Straightening the tongues Step 5 After straightening all the tongues on the cover, remove the cover See Figure 1.1 Figure 1.1 Removing the cover... away Caution Wait for at least 30 minutes before unpacking if the board is just moved from a cold, dry place to a warm, damp place Otherwise, the moisture condenses on the board surface and damages the components Caution Electronic circuits and components are extremely sensitive to electrostatic discharge (ESD) When handling circuit boards, make sure that you wear a securely grounded ESD wrist strap,... 1.7 Checking the Equipment Check the cabinet, subrack, boards, network management computer and internal cables before the equipment installation Figure 1.3 lists the check items Note The internal cables including subrack power cables and cabinet indicator cables have been installed properly before delivery If any item in the following table fails to meet the requirement, contact Huawei in time Figure... rusted or corroded equipment/packing box/packaging materials Properly keep these photos and store the packing box/packing materials Step 1 Move the packing box to the equipment room or a place nearby before unpacking it Step 2 Check the outer package Stop unpacking immediately, if there is Serious damage to the outer package Water on the outside packaging box Rust/water on the equipment Find . items 13 1 Before You Start About This Chapter Note Before you install the OptiX OSN 3500, we recommend reading. Manual. This helps you to ensure a safe and smooth installation. This chapter describes the work you are required to do before you start the installation.