1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

Method Statement of anchor bolt work (rev b)

9 69 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 9
Dung lượng 779,19 KB

Nội dung

The purpose of this Method Statement is to describe the methodology involved in anchor bolt installation work and to detail the steps to be taken in accordance with the technical standard and EHS requirements of Vinh Tan 4 Thermal Power Plant Project.

Ngày đăng: 28/07/2021, 08:24

TỪ KHÓA LIÊN QUAN

w