CAPSTONE PROJECT PLAN Class: FE FPTU DN Duration time: from 07/05/2021 To 15/08/2021 Register information for supervisor Supervisor Full name Phone Truong Cong Phuc 0934888363 E-Mail phuctc@fsoft.com.vn Title Mentor Supervisor 2 Register information for students Full name Student code Student Lê Anh Dũng DE130088 0384878890 dunglade130088@fpt.edu.vn Student Phan Vĩnh Trung DE130075 0373185206 Student Vũ Minh Huy DE130046 0898698348 huyvmde130046@fpt.edu.vn Student Ngơ Thanh Tín Đạt DE140288 0888432774 datntt140288@fpt.edu.vn Student Trần Đình Lân Phone E-mail Role in Group trungpvde130075@fpt.edu.vn DE130096 0795639366 lantd130096@fpt.edu.vn Project information 3.1 Project name: English: System Customer Care VIETNAM RAILWAY Vietnamese: Hệ thống chăm sóc khách hàng đường sắt Việt Nam Abbreviation: SSCVNR 3.2 Objectives An application that enhances the user experience for the Vietnam railway management system The application helps customers to understand information, as well as the schedule of the trip a) Theory and practice (document): • Front-end: Angular 8, HTML5, JS, CSS • Back-end: Java Spring Boot • Database: SQL Server 2019 • GIT b) Program: • • • • • • Order Food, On Train Tracking Train Schedules Management Receive Notification When Train Delays System Train In User Management Bot Chat c) Non-functionnal objectives: • If the system crashes, the user's information is still saved • The application runs on multiple browsers • The system can respond to 500 simultaneous hits without any crashes • Avoid hacking personal information Perform basic web security 3.3 Project Plan a) Assignment of work: All the members both finish the full stack dev , including all the phases (requirement, code, test) The deployment, design, and project progress coordination: both groups and mentor Timetable: Slot 10 Ngày 23/04/2021 -25/04/2021 20/04/202119/04/2021 19/04/202131/5/2021 19/04/2021 25/04/2021 19/04/2021 02/05/2021 26/04/202102/05/2021 10/05/202111/07/2021 17/05/202125/07/2021 12/07/202115-08-2021 16/08/202122/08/2021 Nội dung hướng cơng việc cần hồn thành dẫn Chịu trách Ghi nhiệm Complete Project plan Team Wireframe Team SRS Team Database schema Team UI/UX Team Project framework Team Coding Team Test Team Complete documentation Team Practice presentation Team b) Deadlines [liệt kê deadline phải submit document theo template ban hành] ĐN, 21/04/2021 Supervisor (Sign and full name) Group members (Sign and full name)