C:\Documents and Settings\dorothy\Local Settings\Temporary Internet Files\OLK7\KM8-GUIDE2_.doc KM8HANDTOOL Proposed Bag Print Details Created by: Steve Morris Issue: Draft METHOD 2 Cable Sheath O/D >8mm. METHOD 1 Cable Sheath O/D <8mm Termination position as shown or turned through 180° for termination 2 1a 3 1a 1b 1b FTP/STP For special applications: To remove connector clip insert small screw driver Refer to KM8jack installation instructions for preparation requirement before use of Termination Tool. Detailed installation instructions are available from your local KRONE supplier IMAGE SHOWING KM8 UTP JACK AND COVER (before termination) IMAGE SHOWING KM8 UTP JACK (with cover being assembled) Notes: • Illustrations to be supplied and approved (packaging manufacturer to supply). • Text/Contents to be approved by marketing. • Language/translation requirements to be confirmed by marketing. • KGmbH to upissue KM8Jack packaging to include references to KM8 tool. • Packaging to include KRONE logo and product name IMAGE SHOWING SHIELDED CLIP ASSEMBLY (as per current KM8 bag) IMAGE SHOWING DISSASSEBLY OF COVER (as per current KM8 bag). NB: This image to show original KM8 not automated version. . and SettingsdorothyLocal SettingsTemporary Internet FilesOLK7 KM 8- GUIDE2_.doc KM8 HAND TOOL Proposed Bag Print Details Created by: Steve Morris Issue:. confirmed by marketing. • KGmbH to upissue KM8 Jack packaging to include references to KM8 tool. • Packaging to include KRONE logo and product name IMAGE SHOWING