Thông tin tài liệu
CHINA CONSTRUCTION (S.E.A) CORPORATION., Ltd BAY WATER COMPANY., Ltd SUNWAH PEARL PROJECT CONDOMINIUM BLOCKS OF WARD, BINH THANH DISTRICT, HCM CITY METHOD STATEMENT FORMWORK FOR PILECAP BASEMENT B1 AUGUST-2017 OWNER OWNER -2.350 -5.350 -5.350 OWNER DC-22-P3F,P4C OWNER NOTE -1.POLY WOOD 15MM THK -2.STEEL BOX 50X50 @ 250MM -3.PROPS D49 @ 1000MM PLATE STEEL 40X40MM WELD JOINT -4.STEEL BOX 50X100 @ 600 -5.PLATE STEEL 40X40MM -6.TIROD,M14 TY 14 -7.KICKER BAR T16 @1000MM TIROD,M14 TY D14 REBAR T10~T12 -8.SIKA WATERBARS V-20M -2.350 600 600 -8.000 9400 1800 2000 600 -5.350 OWNER WELD JOINT NOTE: SLAB REBAR T16 100 -5.350 -Prop steel box 50x50x2.0mm with span 1000mm(or props d49 TIE LINK 100 -5.350 2700 650 800 100 650 1900 600 600 1200 500 -2.350 hc=hs-2*d-abv 150 9400 150 9400 1300 500 200 500 1300 1300 600 100 600 -5.350 100 -2.350 OWNER DC-1A-P5C DC-6-P4B OWNER DC-6-P4C,P3D (HORIZONTAL) DC-6-P4C,P3D -5.350 -5.850 -7.800 DC-6-P4C,P3D -7.800 DC-6-P4C,P3D OWNER II DC-6-P4C,P3D OWNER DC-2A-P3A;DC-2A-P3B DC-4A-P4C;DC-1-P5A China construction (S.E.A) corporation Ltd Tầng cao ốc Lawrence S Ting, 801 đường Nguyễn Văn Linh, phường Tân Phú, Q7,TPHCM Dung trọng bêtông (Phụ lục A - TCVN 4453:1995) : Dead weight of concrete and rebar : Ty tròn D14/ Tie rod D14 Diên tích mặt cắt ngang : Horizontal section area: III Tải trọng tính tốn: Calculated load: Ptt=Ptt áp lực bt + Ptt g= 2,500 (kG/m3) Sty= 1.54 (cm2) đầm,đỗ Ptt (theo Phụ lục A - TCVN 4453:1995)/ Live load : Áp lực ngang bê tông đỗ vào cốp pha xác định theo bảng A1 TCVN 4453:1995 Ptt áp lực bt =γbt(0.27*V + 0.78)k1*k2 γbt:trọng lượng riêng bê tông 2,500.00 V:tốc độ hỗn hợp bê tơng m/h 0.50 k1:hệ số tính đến ảnh hưởng độ sụt hỗn hợp bê tông 1.20 (m/h) k2:hệ số kể đến ảnh hưởng nhiệt độ hỗn hợp bê tông 0.85 Ptt áp lực bt =2500*(0.27*0.5 + 0.78)1.2*0.85 2,333 (kG/m2) g1= 400.00 (kG/m2) = 2,733 (kG/m2) = Ptt = 1.3*2.333 + 400*1.3 Theo TCVN 4453:1995 ta có: Follow TCVN 4453:1995 we have: - Trọng lượng thân ván khuôn hệ số vượt tải: The total loading of plywood , overloading modulus: - Trọng lượng bêtông cốt thép hệ số vượt tải: Concrete weight and rebar , overloading modulus: - Tải trọng người phương tiện thi công hệ số vượt tải: Loading by human and construction equitment, overloading modulus: IV Kiểm tra ván ép: Checking the form work: Xét ván có bề rộng: b= The plywood have the width: W= Mômen chống uốn: W =(b*tván^2)/6 Bend resistance moment : I= Mômen quán tính: I= (b*tván^3)/12 Inertia moment: Để thiên an toàn xem ván làm việc dầm đơn giản To safety proneness, see the plywood work as a simple beam lván= Nhịp tính tốn: Calculation bar: Lực tác dụng 100cm bề rộng là: Force effected on 100cm width is: - Tải trọng tiêu chuẩn: Standard load: tc qtcv= q *b 3,553 (kG/m2) Ptt đầm,đỗ Người dụng cụ thi công: Human and construction tools: Tổng tải trọng tác dụng lên 1m2 : Total loading effected on 1m2 : - Tải trọng tiêu chuẩn: Standard load: qtc = Ptt áp lực bt + Ptt đầm,đỗ qtc = 2.333+400 - Tải trọng tính tốn: Calculated load: Ptt = 1.3*Ptt áp lực bt + Ptt đầm,đỗ qtcv= (2733.25/10^4)*100 - Tải trọng tính tốn: Calculated load: THUYẾT MINH BIỆN PHÁP THI CƠNG CỚP PHA MĨNG = 1.10 1.20 1.30 100 (cm) 37.50 (cm3) 28.13 (cm4) 25 (cm) 27.33 (kG/cm) Trang / China construction (S.E.A) corporation Ltd Tầng cao ốc Lawrence S Ting, 801 đường Nguyễn Văn Linh, phường Tân Phú, Q7,TPHCM qttv= qtt*b qttv= (3553.225/10^4)*100 35.53(kG/cm) = 35.53 (kG/cm) 250mm SƠ ĐỒ TÍNH / CALCULATION SCHEMA Kiểm tra cường độ Checking the intensity: Ứng suất chịu uốn ván: The maximum stress of plywood : s= M/W = qttv*lván2/(8W) = s= (kG/cm2) (35.53225*25^2)/(8*37.5) 74.03 Cường độ chịu uốn giới hạn ván ép: Gỗ nhóm IV The maximum design value of bending resistance: [s] = (kG/cm2) 120 Ta có / We have:s< [s] OK Vậy ván ép dày 15mm thỏa mãn điều kiện chịu uốn So, the thickness 15mm of plywood was satisfied the bend resistance Kiểm tra độ võng ván ép: Checking the bending deflexion of plywood: Độ võng: / Bending deflexion: 5*qtcv*l4/(384*E*I) f= = f= (5*27.3325*25^4)/(384*62000*28.125) 0.08 (cm) Độ võng cho phép( Phụ Lục A - TCVN 4453:1995): Độ võng giới hạn,phụ lục A TCVN 4453-1995 Allowable bending deflexion: [f] = l/250= 0.10 (cm) OK Ta có / We have: f < [f] Vậy ván ép dày 15mm thỏa mãn điều kiện độ võng So, the thickness 15mm of plywood was satisfied the bending deflexion condition V Kiểm tra sắt hộp 50x50x2mm: Checking the Steel box 50x50x2mm: Khoảng cách giữa sắt hộp 50x50x2mm là: The distance between the Steel box 50x50x2mm is : as50= 25 (cm) Nhịp sắt hộp 50x50x2mm (khoảng cách sắt: Bar of Steel box 50x50x2mm is: ls50= 70 (cm) Lực tác dụng 25cm bề rộng sắt hộp 50x50x2mm là: Force effected on 25cm widthof Steel box 50x50x2mm is: - Tải trọng tiêu chuẩn: Standard load: qtcs50= qtc*as50 qtcs50= (2733.25/10^4)*25 - Tải trọng tính tốn: Calculated load: qtts50= qtt*as50 qtts50= (3553.225/10^4)*25 = 6.83 (kG/cm) = 8.88 (kG/cm) 8.88(kG/cm) 700mm SƠ ĐỒ TÍNH / CALCULATION SCHEMA Kiểm tra cường độ: Checking the intensity: Ứng suất lớn sắt hộp 50x50x2mm: The maximum pressure in Steel box 50x50x2mm: THUYẾT MINH BIỆN PHÁP THI CƠNG CỚP PHA MĨNG Trang / China construction (S.E.A) corporation Ltd Tầng cao ốc Lawrence S Ting, 801 đường Nguyễn Văn Linh, phường Tân Phú, Q7,TPHCM s= M/W = qtts50*ls502/(8W) = = s= (kG/cm2) (8.88*70^2)/(8*5.91) 920.86 Cường độ chịu uốn giới hạn sắt hộp 50x50x2mm (Mục 4.1.4 -TCVN 338:2005): The limited bending resistance strenght of Steel box 50x50x2mm: [s] = (kG/cm2) 2,100 Ta có / We have:s< [s] OK Vậy sắt hộp 50x50x2mm thỏa mản điều kiện chịu uốn So, Steel box 50x50x2mm was satisfied bending resisrance condition Kiểm tra độ võng sắt hộp 50x50x2mm: Checking the bending deflexion of Steel box 50x50x2mm: Độ võng: / Bending deflexion: công thức tính độ võng sơ đồ đơn giản nhịp 5*qtcs50*ls504/(384*E*I) f= = f= (5*6.83*70^4)/(384*2100000*14.77) 0.07 (cm) Độ võng cho phép( Phụ Lục A - TCVN 4453:1995): TCVN 338-2005, TRANG12 Allowable bending deflexion: [f] = l/250= 0.28 (cm) OK Ta có: f < [f] Vậy sắt hộp 50x50x2mm thỏa mãn điều kiện độ võng So, Steel box 50x50x2mm was satisfied the bending deflexion condition VI Kiểm tra sắt hộp 50x100x2mm: Checking the Steel box 50x100x2mm: Khoảng cách giữa sắt hộp 50x100x2mm là: The distance between the Steel boxs 50x100x2mm is: as90= 70 (cm) Nhịp sắt hộp 50x100x2mm là: Bar of Steel box 50x100x2mm is: ls90= 100 (cm) Lực tác dụng 70cm bề rộng sắt hộp 50x100x2mm là: Force effected on 70cm width of Steel box 50x100x2mm is: - Tải trọng tiêu chuẩn: Standard load: qtcs90= qtc*as90 qtcs90= (2733.25/10^4)*70 - Tải trọng tính tốn: Calculated load: qtts90= qtt*as90 = 19.13 (kG/cm) = 24.87 (kG/cm) = s= (24.87*100^2)/(8*15.5) 2,005.39 Cường độ chịu uốn giới hạn sắt hộp 50x100x2mm (Mục 4.1.4 -TCVN 338:2005): The limited bending resistance strenght of Steel box 50x100x2mm: [s] = 2,100 Ta có / We have :s< [s] OK Vậy sắt hộp 50x100x2mm thỏa mản điều kiện chịu uốn So, Steel box 50x100x2mm was satisfied the bending resistance condition Kiểm tra độ võng sắt hộp 50x100x2mm: Checking the the bending deflexion of Steel box 50x100x2mm: Độ võng: / Bending deflexion: 5*qtcs90*ls904/(384*E*I) f= = f= (5*19.13*100^4)/(384*2030000*77.52) 0.16 (kG/cm2) qtts90= (3553.225/10^4)*70 24.87(kG/cm) 1000mm SƠ ĐỒ TÍNH / CALCULATION SCHEMA Kiểm tra cường độ: Checking the intensity: Ứng suất lớn sắt hộp 50x100x2mm: The maximum pressure in Steel box 50x100x2mm: s= M/W = qtts90*ls902/(8W) = THUYẾT MINH BIỆN PHÁP THI CÔNG CỐP PHA MÓNG (kG/cm2) (cm) Trang / China construction (S.E.A) corporation Ltd Tầng cao ốc Lawrence S Ting, 801 đường Nguyễn Văn Linh, phường Tân Phú, Q7,TPHCM Độ võng cho phép( Phụ Lục A - TCVN 4453:1995): The allowable bending deflexion: = [f] = l/400 0.25 OK Ta có / We have : f < [f] Vậy sắt hộp 50x100x2mm thỏa mãn điều kiện độ võng So, the Steel box 50x100x2mm was satisfied the bending deflexion condition Kiểm tra ty gông thành D14 Checking the tie rod D14 Khoảng cách ty gông : 70.00 The distance of tie rod is : Lực tác dụng lên đầu ty : Axial force action for one Tie Rod: F = 8.88*70 1,741.08 Lực cắt cho phép ty D14 : Allowable shear force of one tie rod D14 : [f] = 3,232.70 OK Ta có / We have: F < [f] Vậy ty gông D14 thỏa mãn điều kiện So, The tie rod D14 was satisfied the condition 4.1 Use props with information / Sử dụng sắt với thơng số: outside diameter / đường kính ngồi: 4.90 cm, inside diameter / đường kính trong: 4.60 cm Props d49 with span 1500mm/ Tuýp sắt d49 bố trí cho hệ chống @1500 mm Load tranfered from horizontal rod supports to props / Tải truyền từ xương ngang vào hệ chống V = Ptt L = Ptt L3 L L : khoảng cách chống Ptt : tải trọng tính tốn 3553.225 L3 : khoảng cách ty 0.7 V 3553*0.6*1.5 2487 Checking stabilization / Kiểm tra ổn định: 𝑉 1112 𝜎 = = 3198/( л(4.92 -4.62 )/4)= 𝐹 OK Ta có / We have : 𝜎 < [f] [f] Cường độ giới hạn Vậy chống đủ khả chịu lực So, the steel pile have enough pressed ability THUYẾT MINH BIỆN PHÁP THI CƠNG CỚP PHA MĨNG = 2100 2,100 (cm) (cm) (kG) (kG) m (kg/m2) m kg (kg/cm2) (kg/cm2) (kg/cm2) Trang / CHINA CONSTRUCTION (S.E.A) CORPORATION., Ltd BAY WATER COMPANY., Ltd SUNWAH PEARL PROJECT CONDOMINIUM BLOCKS OF WARD, BINH THANH DISTRICT, HCM CITY METHOD STATEMENT FROMWORK FOR PILECAP BASEMENT B2 AUGUST-2017 OWNER 2400 2800 200 1800 1400 200 200 1400 1800 200 200 1900 2300 200 200 200 1800 1400 200 200 OWNER 200 1400 200 1800 200 1400 500 BRICK WALL 200mm -6.500 200 200 1400 1800 200 200 2800 2400 200 200 200 200 200 1600 2000 200 -6.500 200 1600 2000 200 1800 2200 200 1150 500 -5.350 500 BRICK WALL 200mm 150 500 1150 500 -5.350 BRICK WALL 200mm -6.500 200 1600 2000 200 150 500 1600 2000 -5.350 150 500 200 2200 1800 200 1600 200 2000 200 1150 BRICK WALL 200mm -6.500 200 200 1800 1900 2300 150 500 -6.500 1150 BRICK WALL 200mm 150 500 1150 150 500 1150 -5.350 500 -5.350 500 -5.350 BRICK WALL 200mm -6.500 200 1800 2200 200 200 OWNER 5000 BRICK WALL 200mm 200 500 3800 3800 6200 5800 500 6000 200 3400 3800 200 4800 -6.600 150 500 1250 BRICK WALL 200mm 100 150 500 1250 100 -5.350 500 -5.350 500 -5.350 6200 BRICK WALL 200mm -6.600 BRICK WALL 200mm OWNER 200 2500 200 200 1800 200 200 NOTE: 2920 2970 -Link between rebar and tirod (props) is a weld / -Prop steel box 50x50x2.0mm with span 5400 900 900 BRICK WALL 900 1000 7700 1000 600 100 600 150 1000 650 650 1000 650 1000 650 1000 600 hc=hs-2*d-abv 7250 200mm 150 900 900 200 900 500 200 10100 200 NOTE -1.POLY WOOD 15MM THK BRICK WALL 200mm -2.STEEL BOX 50X50 @ 250MM -3.PROPS D49 @ 1000MM 500 -6.600 -4.STEEL BOX 50X100 @ 600 -7.150 -5.PLATE STEEL 40X40MM 500 600 1300 1250 100 150 500 500 -5.350 -7.800 500 1800 2800 500 -6.TIROD,M14 TY 14 -7.KICKER BAR T16 @1000MM -8.SIKA WATERBARS V-20M OWNER 100 hc=hs-2*d-abv 150 -5.350 100 -6.600 1000 1150 150 150 -6.500 1000 -5.350 1150 -7.150 500 100 150 500 500 -5.350 1250 150 -7.800 500 1800 2800 500 China construction (S.E.A) corporation Ltd Tầng cao ốc Lawrence S Ting, 801 đường Nguyễn Văn Linh, phường Tân Phú, Q7,TPHCM TÍNH TOÁN BIỆN PHÁP CỚP PHA MĨNG CALCULATION METHOD OF THE FORM WORK FOR PILECAP I Cơ sở tính tốn: Reference documentation : TCVN 4453-1995:"Kết cấu bê tông bê tông cốt thép tồn khối-Tiêu chuẩn thi cơng nghiệm thu" TCVN 4453-1995:"Monolithic concrete and reinforced concrete structures–Codes for construction,check and acceptance" TCVN 2737-1995:"Tải trọng tác động-Tiêu chuẩn thiết kế" TCVN 2737-1995:"Loads and effects–Design standard" TCXDVN 338 - 2005:"Kết cấu thép - Tiêu chuẩn thiết kế" TCXDVN 338 - 2005:"Steel structure - Design standard" II Số liệu đầu vào: Data input: Stt Danh mục vật tư / Material list Ván ép phủ phim dày 15mm / Film coated plywood , thickness 15mm Sắt hộp 50x50x2.0mm / Steel box 50x50x2mm Sắt hộp 50x100x2.0mm / Steel box 50x100x2mm Cây chống Ø48x2mm / Ø48x2mm steel pipe Ván ép phủ phim: Film coated plywood : Ru = Ứng suất cho phép: 120 (kG/cm2) Allowable pressure: tván= Ván ép phủ phim dày: 15 (mm) Thickness of Film coated plywood : E= Môđun đàn hồi: 6.20E+04 (kG/cm2) Elastic modulus : Mômen quán tính: Inertia moment : b*(tván)3/12 I= I= 100*(1.5^3)/12 Mômen chống uốn: Bend resistance moment : I/(tván/2) W= = 28.13 (cm4) W= 28.125/(1.5/2) Sắt hộp 50x50x2mm: Steel box 50x50x2mm : Mơđun đàn hồi: Elastic modulus : Mơmen qn tính: Inertia moment : I= (B*H3/12-b*h3/12) I= [5*53/12-(5-2*0.2)*(5-2*0.2)3/12] Mômen chống uốn: Bend resistance moment : W= I/(H/2) W= 14.77/(5/2) Sắt hộp 50x100x2mm: Steel box 50x100x2mm : Môđun đàn hồi: Elastic modulus : Mơmen qn tính: Inertia moment : I= (B*H3/12-b*h3/12) I= [5*10/12-(5-2*0.2)*(10-2*0.2)3/12] Mômen chống uốn: Bend resistance moment : W= I/(H/2) W= 77.52/(10/2) = 37.50 (cm3) E= 2.10E+06 = 14.77 (cm4) = 5.91 (cm3) E= 2.03E+06 = 77.52 (cm4) = 15.50 (cm3) THUYẾT MINH BIỆN PHÁP THI CƠNG CỚP PHA MĨNG (kG/cm2) (kG/cm2) Trang / China construction (S.E.A) corporation Ltd Tầng cao ốc Lawrence S Ting, 801 đường Nguyễn Văn Linh, phường Tân Phú, Q7,TPHCM Dung trọng bêtông (Phụ lục A - TCVN 4453:1995) : Dead weight of concrete and rebar : Ty tròn D14/ Tie rod D14 Diên tích mặt cắt ngang : Horizontal section area: III Tải trọng tính tốn: Calculated load: Ptt=Ptt áp lực bt + Ptt g= 2,500 (kG/m3) Sty= 1.54 (cm2) đầm,đỗ Ptt (theo Phụ lục A - TCVN 4453:1995)/ Live load : Áp lực ngang bê tông đỗ vào cốp pha xác định theo bảng A1 TCVN 4453:1995 Ptt áp lực bt =γbt(0.27*V + 0.78)k1*k2 γbt:trọng lượng riêng bê tông 2,500.00 V:tốc độ hỗn hợp bê tơng m/h 0.50 k1:hệ số tính đến ảnh hưởng độ sụt hỗn hợp bê tông 1.20 (m/h) k2:hệ số kể đến ảnh hưởng nhiệt độ hỗn hợp bê tông 0.85 Ptt áp lực bt =2500*(0.27*0.5 + 0.78)1.2*0.85 2,333 (kG/m2) g1= 400.00 (kG/m2) = 2,733 (kG/m2) = Ptt = 1.3*2.333 + 400*1.3 Theo TCVN 4453:1995 ta có: Follow TCVN 4453:1995 we have: - Trọng lượng thân ván khuôn hệ số vượt tải: The total loading of plywood , overloading modulus: - Trọng lượng bêtông cốt thép hệ số vượt tải: Concrete weight and rebar , overloading modulus: - Tải trọng người phương tiện thi công hệ số vượt tải: Loading by human and construction equitment, overloading modulus: IV Kiểm tra ván ép: Checking the form work: Xét ván có bề rộng: b= The plywood have the width: W= Mômen chống uốn: W =(b*tván^2)/6 Bend resistance moment : I= Mômen quán tính: I= (b*tván^3)/12 Inertia moment: Để thiên an tồn xem ván làm việc dầm đơn giản To safety proneness, see the plywood work as a simple beam lván= Nhịp tính tốn: Calculation bar: Lực tác dụng 100cm bề rộng là: Force effected on 100cm width is: - Tải trọng tiêu chuẩn: Standard load: tc qtcv= q *b 3,553 (kG/m2) Ptt đầm,đỗ Người dụng cụ thi công: Human and construction tools: Tổng tải trọng tác dụng lên 1m2 : Total loading effected on 1m2 : - Tải trọng tiêu chuẩn: Standard load: qtc = Ptt áp lực bt + Ptt đầm,đỗ qtc = 2.333+400 - Tải trọng tính tốn: Calculated load: Ptt = 1.3*Ptt áp lực bt + Ptt đầm,đỗ qtcv= (2733.25/10^4)*100 - Tải trọng tính tốn: Calculated load: THUYẾT MINH BIỆN PHÁP THI CƠNG CỚP PHA MĨNG = 1.10 1.20 1.30 100 (cm) 37.50 (cm3) 28.13 (cm4) 25 (cm) 27.33 (kG/cm) Trang / China construction (S.E.A) corporation Ltd Tầng cao ốc Lawrence S Ting, 801 đường Nguyễn Văn Linh, phường Tân Phú, Q7,TPHCM qttv= qtt*b qttv= (3553.225/10^4)*100 35.53(kG/cm) = 35.53 (kG/cm) 250mm SƠ ĐỒ TÍNH / CALCULATION SCHEMA Kiểm tra cường độ Checking the intensity: Ứng suất chịu uốn ván: The maximum stress of plywood : s= M/W = qttv*lván2/(8W) = s= (kG/cm2) (35.53225*25^2)/(8*37.5) 74.03 Cường độ chịu uốn giới hạn ván ép: Gỗ nhóm IV The maximum design value of bending resistance: [s] = (kG/cm2) 120 Ta có / We have:s< [s] OK Vậy ván ép dày 15mm thỏa mãn điều kiện chịu uốn So, the thickness 15mm of plywood was satisfied the bend resistance Kiểm tra độ võng ván ép: Checking the bending deflexion of plywood: Độ võng: / Bending deflexion: 5*qtcv*l4/(384*E*I) f= = f= (5*27.3325*25^4)/(384*62000*28.125) 0.08 (cm) Độ võng cho phép( Phụ Lục A - TCVN 4453:1995): Độ võng giới hạn,phụ lục A TCVN 4453-1995 Allowable bending deflexion: [f] = l/250= 0.10 (cm) OK Ta có / We have: f < [f] Vậy ván ép dày 15mm thỏa mãn điều kiện độ võng So, the thickness 15mm of plywood was satisfied the bending deflexion condition V Kiểm tra sắt hộp 50x50x2mm: Checking the Steel box 50x50x2mm: Khoảng cách giữa sắt hộp 50x50x2mm là: The distance between the Steel box 50x50x2mm is : as50= 25 (cm) Nhịp sắt hộp 50x50x2mm (khoảng cách sắt: Bar of Steel box 50x50x2mm is: ls50= 70 (cm) Lực tác dụng 25cm bề rộng sắt hộp 50x50x2mm là: Force effected on 25cm widthof Steel box 50x50x2mm is: - Tải trọng tiêu chuẩn: Standard load: qtcs50= qtc*as50 qtcs50= (2733.25/10^4)*25 - Tải trọng tính tốn: Calculated load: qtts50= qtt*as50 qtts50= (3553.225/10^4)*25 = 6.83 (kG/cm) = 8.88 (kG/cm) 8.88(kG/cm) 700mm SƠ ĐỒ TÍNH / CALCULATION SCHEMA Kiểm tra cường độ: Checking the intensity: Ứng suất lớn sắt hộp 50x50x2mm: The maximum pressure in Steel box 50x50x2mm: THUYẾT MINH BIỆN PHÁP THI CƠNG CỚP PHA MĨNG Trang / China construction (S.E.A) corporation Ltd Tầng cao ốc Lawrence S Ting, 801 đường Nguyễn Văn Linh, phường Tân Phú, Q7,TPHCM s= M/W = qtts50*ls502/(8W) = = s= (kG/cm2) (8.88*70^2)/(8*5.91) 920.86 Cường độ chịu uốn giới hạn sắt hộp 50x50x2mm (Mục 4.1.4 -TCVN 338:2005): The limited bending resistance strenght of Steel box 50x50x2mm: [s] = (kG/cm2) 2,100 Ta có / We have:s< [s] OK Vậy sắt hộp 50x50x2mm thỏa mản điều kiện chịu uốn So, Steel box 50x50x2mm was satisfied bending resisrance condition Kiểm tra độ võng sắt hộp 50x50x2mm: Checking the bending deflexion of Steel box 50x50x2mm: Độ võng: / Bending deflexion: cơng thức tính độ võng sơ đồ đơn giản nhịp 5*qtcs50*ls504/(384*E*I) f= = f= (5*6.83*70^4)/(384*2100000*14.77) 0.07 (cm) Độ võng cho phép( Phụ Lục A - TCVN 4453:1995): TCVN 338-2005, TRANG12 Allowable bending deflexion: [f] = l/250= 0.28 (cm) OK Ta có: f < [f] Vậy sắt hộp 50x50x2mm thỏa mãn điều kiện độ võng So, Steel box 50x50x2mm was satisfied the bending deflexion condition VI Kiểm tra sắt hộp 50x100x2mm: Checking the Steel box 50x100x2mm: Khoảng cách giữa sắt hộp 50x100x2mm là: The distance between the Steel boxs 50x100x2mm is: as90= 70 (cm) Nhịp sắt hộp 50x100x2mm là: Bar of Steel box 50x100x2mm is: ls90= 100 (cm) Lực tác dụng 70cm bề rộng sắt hộp 50x100x2mm là: Force effected on 70cm width of Steel box 50x100x2mm is: - Tải trọng tiêu chuẩn: Standard load: qtcs90= qtc*as90 qtcs90= (2733.25/10^4)*70 - Tải trọng tính tốn: Calculated load: qtts90= qtt*as90 = 19.13 (kG/cm) = 24.87 (kG/cm) = s= (24.87*100^2)/(8*15.5) 2,005.39 Cường độ chịu uốn giới hạn sắt hộp 50x100x2mm (Mục 4.1.4 -TCVN 338:2005): The limited bending resistance strenght of Steel box 50x100x2mm: [s] = 2,100 Ta có / We have :s< [s] OK Vậy sắt hộp 50x100x2mm thỏa mản điều kiện chịu uốn So, Steel box 50x100x2mm was satisfied the bending resistance condition Kiểm tra độ võng sắt hộp 50x100x2mm: Checking the the bending deflexion of Steel box 50x100x2mm: Độ võng: / Bending deflexion: 5*qtcs90*ls904/(384*E*I) f= = f= (5*19.13*100^4)/(384*2030000*77.52) 0.16 (kG/cm2) qtts90= (3553.225/10^4)*70 24.87(kG/cm) 1000mm SƠ ĐỒ TÍNH / CALCULATION SCHEMA Kiểm tra cường độ: Checking the intensity: Ứng suất lớn sắt hộp 50x100x2mm: The maximum pressure in Steel box 50x100x2mm: s= M/W = qtts90*ls902/(8W) = THUYẾT MINH BIỆN PHÁP THI CÔNG CỐP PHA MÓNG (kG/cm2) (cm) Trang / China construction (S.E.A) corporation Ltd Tầng cao ốc Lawrence S Ting, 801 đường Nguyễn Văn Linh, phường Tân Phú, Q7,TPHCM Độ võng cho phép( Phụ Lục A - TCVN 4453:1995): The allowable bending deflexion: = [f] = l/400 0.25 OK Ta có / We have : f < [f] Vậy sắt hộp 50x100x2mm thỏa mãn điều kiện độ võng So, the Steel box 50x100x2mm was satisfied the bending deflexion condition Kiểm tra ty gông thành D14 Checking the tie rod D14 Khoảng cách ty gông : 70.00 The distance of tie rod is : Lực tác dụng lên đầu ty : Axial force action for one Tie Rod: F = 8.88*70 1,741.08 Lực cắt cho phép ty D14 : Allowable shear force of one tie rod D14 : [f] = 3,232.70 OK Ta có / We have: F < [f] Vậy ty gông D14 thỏa mãn điều kiện So, The tie rod D14 was satisfied the condition 4.1 Use props with information / Sử dụng tuýp sắt với thơng số: outside diameter / đường kính ngồi: 4.90 cm, inside diameter / đường kính trong: 4.60 cm THUYẾT MINH BIỆN PHÁP THI CƠNG CỚP PHA MĨNG (cm) (cm) (kG) (kG) Trang / ... maximum pressure in Steel box 50x50x2mm: THUYẾT MINH BIỆN PHA P THI CÔNG CỐP PHA MÓNG Trang / China construction (S.E.A) corporation Ltd Tầng cao ốc Lawrence S Ting, 801 đường Nguyễn Văn Linh,... maximum pressure in Steel box 50x50x2mm: THUYẾT MINH BIỆN PHA P THI CÔNG CỐP PHA MÓNG Trang / China construction (S.E.A) corporation Ltd Tầng cao ốc Lawrence S Ting, 801 đường Nguyễn Văn Linh,... BIỆN PHA P THI CƠNG CỚP PHA MĨNG = 2100 2,100 (cm) (cm) (kG) (kG) m (kg/m2) m kg (kg/cm2) (kg/cm2) (kg/cm2) Trang / CHINA CONSTRUCTION (S.E.A) CORPORATION., Ltd BAY WATER COMPANY., Ltd SUNWAH PEARL
Ngày đăng: 11/04/2020, 16:25
Xem thêm: Biện pháp thi công cốp pha móng tầng hầm dự án Sunwah Pearl