BAY WATER COMPANY., Ltd SUNWAH PEARL PROJECT CONDOMINIUM BLOCKS OF WARD, BINH THANH DISTRICT, HCM CITY METHOD STATEMENT FOR FORMWORK WALL TANK TYPICAL AT 23TH FLOOR-TOWER 1,2&3 AUGUST-2018 OWNER TYPICAL PLAN TYPICAL PLAN TYPICAL PLAN TYPICAL PLAN LAYOUT PLAN FOR SLAB SUPPORTING_TOWER LAYOUT PLAN FOR SLAB SUPPORTING_TOWER LAYOUT PLAN FOR SLAB SUPPORTING_TOWER DRAWING LIST OWNER P.C 1.5 P.D P.E 1.6 200 220 1.4 500 SSL 76.400 3190 600 1610 2130 2630 200 3250 1.D SSL 73.150 200 5400 150 200 5800 TANK WALL TANK WALL 1.6 TOWER T1- TRANSFER WATER TANK - SECTION 220 500 500 200 SSL 76.400 600 300 200 TOWER T1- TRANSFER WATER TANK - FLOOR PLAN 2330 2130 1.E 2630 3250 2390 TOWER T1- TRANSFER WATER TANK - FLOOR PLAN 100 1010 200 3290 200 SSL 73.150 840 5540 1.E 500 2255 200 6095 6495 TOWER T1- TRANSFER WATER TANK - SECTION 2495 2130 3250 200 600 200 225 2330 2130 2630 200 SSL 73.150 2630 2200 2355 600 SSL 76.400 500 500 SSL 76.400 3495 3250 200 220 200 220 TOWER T1- TRANSFER WATER TANK - SECTION SSL 73.150 200 5350 200200 5750 TOWER T1- TRANSFER WATER TANK - SECTION 1.4 TANK OF LEVEL 23 LAYOUT- TOWER T1 200 220 OWNER 2.C 500 SSL 76.400 TANK WALL TANK WALL 2130 1600 200 600 2630 3250 3495 SSL 73.150 200 5695 105 TOWER T2- TRANSFER WATER TANK - SECTION 200 220 2.D 200 6095 500 SSL 76.400 2.D TOWER T2- TRANSFER WATER TANK - FLOOR PLAN 200 TOWER T2- TRANSFER WATER TANK - FLOOR PLAN 2.6 3150 2130 2.5 600 2630 2.4 3250 2000 SSL 73.150 200 5750 200 6150 500 500 SSL 76.400 SSL 73.150 200 5695 6095 200 105 4850 2130 2630 600 200 3250 300 2130 2630 2895 600 200 3250 2200 TOWER T2- TRANSFER WATER TANK - SECTION 200 220 200 220 2.4 SSL 76.400 200 SSL 73.150 200 5750 6150 2.D TOWER T2- TRANSFER WATER TANK - SECTION TOWER T2- TRANSFER WATER TANK - SECTION 200 200 2.6 TANK OF LEVEL 23 LAYOUT- TOWER T2 OWNER 3.F TANK WALL TANK WALL TANK WALL TANK WALL TANK WALL TANK WALL 3.G 3.H 3.7 3.9 3.10 TOWER T3- TRANSFER WATER TANK - FLOOR PLAN TOWER T3- TRANSFER WATER TANK - FLOOR PLAN 200 220 TOWER T3- TRANSFER WATER TANK - FLOOR PLAN 3.8 200 220 3.6 3250 SSL 73.150 510 6690 500 7200 3.F 1000 2130 2630 600 200 3250 3750 2130 2630 600 200 3250 2840 500 SSL 76.400 500 SSL 76.400 SSL 73.150 200 4850 5250 3.G TOWER T3- TRANSFER WATER TANK - SECTION 200300 3.6 TOWER T3- TRANSFER WATER TANK - SECTION TANK OF LEVEL 23 LAYOUT- TOWER T3 200 220 200 220 OWNER 500 SSL 76.400 500 SSL 76.400 4950 200 220 2130 2630 3250 SSL 73.150 SSL 73.150 200 200 TOWER T3- TRANSFER WATER TANK - SECTION 2775 3.7 500 500 1565 550 275 200 2590 3.G 250 2130 2630 600 200 3250 3500 2130 2630 250 SSL 76.400 780 200 3250 600 SSL 73.150 200300 200 TOWER T3- TRANSFER WATER TANK - SECTION 3.G SSL 76.400 1310 250 200 220 200 600 200 200 2080 2630 200 3250 1925 SSL 73.150 200 4650 4650 3.9 TANK OF LEVEL 23 LAYOUT- TOWER T3 TOWER T3- TRANSFER WATER TANK - SECTION TOWER T3- TRANSFER WATER TANK - SECTION OWNER FORMWORK WALL TANK TYPICAL PLAN_OPTION +76.400 SLAB LEVEL 24 TANK SLAB 2350 3050 200 200 200 400 30 TANK SLAB Hs B2 +73.150 500 100 SLAB LEVEL 23 TYPICAL PLAN +73.650 OWNER FORMWORK WALL TANK TYPICAL PLAN_OPTION 200 SLAB LEVEL 24 +76.400 200 +76.400 200 SLAB LEVEL 24 +76.000 600 600 +73.150 TANK SLAB SLAB LEVEL 23 B2 B2 Hs 30 30 TANK SLAB TANK SLAB 600 3050 600 500 150 600 +73.150 Hs 3050 600 TANK SLAB 500 150 600 600 200 +76.000 SLAB LEVEL 23 TYPICAL PLAN OWNER WELDING WELDING FORMWORK WALL TANK TYPICAL PLAN_OPTION +76.400 SLAB LEVEL 24 TANK SLAB 2350 3050 200 200 200 Hs B2 500 TANK SLAB +73.150 SLAB LEVEL 23 TYPICAL PLAN OWNER WELDING WELDING FORMWORK WALL TANK TYPICAL PLAN_OPTION +76.400 +76.400 SLAB LEVEL 24 200 200 SLAB LEVEL 24 +76.000 600 600 +76.000 600 600 Hs B2 SLAB LEVEL 23 TANK SLAB B2 +73.150 TANK SLAB TANK SLAB 500 150 600 3050 600 500 150 600 +73.150 Hs 3050 600 TANK SLAB SLAB LEVEL 23 TYPICAL PLAN OWNER 1.4 1.D 1.E P.C 1.5 P.D P.E 1.6 OWNER 2.C 2.D 2.4 2.5 2.6 OWNER 3.F 3.G 3.H 3.6 3.7 3.8 3.9 3.10