1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

Shop manual máy khoan hầm Boomer H282 - P3

90 577 10
Tài liệu đã được kiểm tra trùng lặp

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 90
Dung lượng 2,55 MB

Nội dung

Shop manual máy khoan hầm Boomer H282 (Phần 3) Phần an toàn sư dụng máy, bảo dưỡng máy

PM No. 9852 1456 01b2004-12Atlas CopcoBoomer 281/282 with DC15 carrierOperator’s instructions Atlas Copco Rock Drills ABSE-70191 Örebro, SwedenSAFETY INSTRUCTIONSBefore starting, read all instructions carefully.Special attention must be paidto information alongsidethis symbol.Only use genuine Atlas Copco parts.1250 0071 04© Copyright 2004, Atlas Copco Rock Drills AB, SwedenAny unauthorized use or copying of the contents or any part thereof is prohibited.This applies in particular to trademarks, model denominations, part numbers and drawings. Safety3SafetyReference . 5 Safety 4 Safety5ReferenceNoteAlways read the information under Safety before starting to use the rig or starting maintenance work.1250 0099 89 Safety 6 Operator’s instructions7Operator’s instructions1. Technical data . 11Boomer/Rocket Boomer 280 with DC15, DC16 carrier . 11Data plate . 11Data plate contents 11Location of data plate . 122. Component locations 13Main rig components . 133. Application . 14General 144. Daily inspection . 15General 15Checklist 15Daily maintenance . 15Freeze prevention measures 165. Controls 17Locations . 17Description of operation 18Control panel 18Control panel functions . 19Drill panel . 22Drill panel functions . 22Positioning panel 23Positioning panel functions . 24Lever for protective roof, jacks and reeling units . 246. Electrical system 26Electric cubicle 26Resetting emergency stop 277. Repositioning . 29Environment 29Before starting the diesel engine . 29Starting the diesel engine . 32Before tramming 32Checking the brakes 33Checking the parking brake 33Checking service brakes . 33Checking the interlock circuit . 33Repositioning . 34Safety 34Parking . 35 Operator’s instructions 8Operating the boom, jacks, protective roof and reeling units 36Control levers 36Boom . 37Jacks 37Protective roof . 37Cable reeling unit (option) 38Unwinding the cable 38Reeling in the cable 38Water-hose reeling unit, option . 39Withdrawing the hose . 39Reeling in the hose . 398. Positioning 40Positioning equipment . 40Positioning panel . 41Operating . 42Safety 42Diesel operation 42Raising and slewing the boom 42Slewing and inclining the feeder 43Feed lookout cylinder and boom telescope . 44Rotation and feed extension 45Transport position . 46Bench drilling . 47Cross-cut drilling 47Roof drilling 489. Drilling . 49Environment 49Before drilling 49Connect to power supply 49Battery 49Mains power . 49Connect to water supply . 50Connect the air supply 50Checks . 51Setting up the rig . 51Drilling . 52Drilling levers . 52Collaring and full drilling . 52Cease drilling 53Air blowing of drilled hole, option . 53Changing drill bit 54Safety 54Changing drill bit against rock face . 54Changing drill bit in bottom of hole . 55Check when drilling 56Safety 56 Operator’s instructions9Rock drill 56System 56Hoses and couplings . 57Settings . 57Setting feed pressure 57Feed pressure for collaring . 58Feed pressure for full drilling . 58Feed pressure for full drilling of large holes, option 58Introduction 59Max. feed pressure (upper and lower cylinder) . 60Pressure difference between upper and lower cylinder . 60Feed pressure for collaring and full drilling . 61Feed pressure, reverse 61Description . 62RPCF feed control 62Feed (rock drill) return movement . 63Setting the anti-jamming protection . 63Setting the feed return movement 63Setting RPCF during drilling . 64After drilling 65Safety 65Freeze prevention measures 6510. Extension drilling, option . 66Equipment for extension drilling . 66Operator panel . 67Operating . 68Safety 68Manual rod adding 68Preparation . 68Drilling and extension 69Removing drilling rods 7011. Directional control 71FAM . 71Control panel . 71Operating . 73Start . 73Menus . 73Main menu . 74Menu tree, branch 1 . 74Menu tree, branch 2 . 75Menu tree, branch 3 . 76Menu tree, branch 4 . 77Menu tree, branch 5 . 78Menu tree, branch 6 . 79Angle indication 80Working menu drift drilling 80 Operator’s instructions 10Settings 81Length of full-depth drilled hole 81Reference direction 81Working menu . 82Fault indication 8312. Air conditioning, option . 84General . 84Control panel . 84Tip 85In high ambient temperature . 85Fogging in the cab . 8513. Shift control, option 86APC 50 (Automatic Powershift Control) 86Description of operation . 86Control panel . 87Display of current gear and direction of travel 88Display of turbine shaft speed 89Display of tramming speed 90Display of fault codes . 90 [...]...Operator’s instructions 1 Technical data 1 Technical data Boomer/ Rocket Boomer 280 with DC15, DC16 carrier Note A brief summary of data follows For more detailed information, see the maintenance instructions All information applies to a standard-equipped rig Length, rig in transport position Width Height, rig with protective roof Weight Installed diesel... Max longitudinal inclination Stability Ambient temperature Noise level at operator's station (ISO/DIS 11201) Radiated acoustic power (ISO/DIS 11201) Vibration level, floor (ISO 2631/1) 9. 9-1 1.7 m 1.95 m 2. 3-3 .0 m 1 7-2 0 tonnes 55 kW See data plate See data plate See data plate 0º 14º Complies with CEN 0 to +40ºC 124 dB(A) re2 µΠα 124 dB(A) re1 pW 0.12 m/s 2 Data plate Data plate contents The rig carries... Copco Rock Drills AB STOCKHOLM - SWEDEN Name Type Serial No Installed diesel power Installed electric power Rated voltage Rated frequency Gross weight 9106 1071 90 kW kW V Hz kg Made in Sweden 199 Figure: Location of data plate 12 Operator’s instructions 2 Component locations 2 Component locations Main rig components 8 6 1 2 7 3 4 5 1250 0070 75 Figure: Boomer/ Rocket Boomer with DC15 or DC16 carrier... Button for removing the drill bit (DCS 18 only) Law Water flushing lever Lrb Small hole - large hole selector lever V6 Pressure control valve V1a RPCF valve, standard V1b RPCF valve for large hole, option Ltf Feed lever for threading and unthreading rods Lds Lever to open/close front drill-steel support BSH 110 Lrn Single-rod/extension drilling selector lever Positioning panel Lfr Lfl Lbe Lfe Bap Lbc 1250... button is depressed and released when the button is extended The parking brake must be applied for the diesel engine to be started 1250 0116 24 T3 1250 0116 25 T4 Switch for roof-mounted lighting 1250 0116 26 T5 Switch for roof-mounted lighting 1250 0116 34 T5 Switch for lighting on carrier 1250 0116 35 T6 Switch for lighting on carrier 1250 0116 27 T7 Button for lamp test When the button is depressed,... locations Main rig components 8 6 1 2 7 3 4 5 1250 0070 75 Figure: Boomer/ Rocket Boomer with DC15 or DC16 carrier 1 2 3 4 5 6 7 8 Rock drill Feeder Boom Front jacks Rear jacks Cable reeling unit Water-hose reeling unit Protective roof 13 Operator’s instructions 3 Application 3 Application General The drilling equipment is designed exclusively for drilling holes in tunnels and mines All other uses are... people • Supporting objects • Scaling rock The manufacturer is not liable for damage caused by inappropriate use • It is essential the operator has read and comprehends the operator, maintenance and repair manuals as well as the maintenance schedules • The drilling equipment must only be used, maintained and repaired by personnel well conversant with the equipment and the dangers involved • It is essential... Controls Positioning panel functions Table: Positioning panel functions No Function Lfr Lever for feed rotation Lfl Lever for feed lookout Lbe Lever for boom telescope Lfe Lever for feed extension Bap Anti-parallel button Lbc Lever for boom positioning Lever for protective roof, jacks and reeling units P1 P2 K D1 D2 D3 D4 D5 T1 K S D1 D2 D3 D4 D5 T1 1250 0141 89 T2 T2 Figure: Levers for diesel positioning... pressed Q7 Switch Main switch S51 Switch Motor switch, motor 1 • Must be in position (1) when in operation • In position (0) the control voltage will be cut off S52 Symbol Switch Motor switch, motor 2, 2-boom rigs only • Must be in position (1) when in operation • In position (0) the control voltage will be cut off 1250 0059 48 1250 0065 15 C 1250 0059 96 1250 0059 46 1250 0059 47 1 = 0 = 1 0 1250 0060 . applies to a standard-equipped rig.Length, rig in transport position 9. 9-1 1.7 mWidth 1.95 mHeight, rig with protective roof 2. 3-3 .0 mWeight 1 7-2 0 tonnesInstalled. PM No. 9852 1456 01b200 4-1 2Atlas CopcoBoomer 281/282 with DC15 carrierOperator’s instructions Atlas Copco Rock Drills ABSE-70191 Örebro, SwedenSAFETY

Ngày đăng: 25/10/2012, 10:38

TỪ KHÓA LIÊN QUAN

w