Summary thesis Doctoral: Managing investment project on infrastructure construction in the form of Public Private Partnership in Vietnam

19 43 0
Summary thesis Doctoral: Managing investment project on infrastructure construction in the form of Public Private Partnership in Vietnam

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

Thông tin tài liệu

Develop scientific arguments and propose solutions to improve the management of investment projects on infrastructure construction in the form of PPP in Vietnam.

1 INTRODUCTION  1. Rationale of the thesis Currently Vietnam has more than 200 projects implemented in the form of PPP, of which the total  investment capital of the private sector is about 6.7 billion USD, of which BOT, BT and BOO models make   up   the   majority   Areas   of   involvement   in   private   investment   include   transportation,   energy,  telecommunications,   supply   and   drainage   Most   infrastructure   construction   projects   carry   out   PPP  investments   in   Vietnam   mainly   in   the   fields   of   transport,   energy   and   some   projects   in   other   areas.  Infrastructure construction projects in PPP form are mainly implemented under BOT, BT, BTO and BOO Most   BOT,   BT,   BTO   and   BOO   projects   in   Vietnam   still   mainly   apply   the   form   of   contractor   designation in the process of selecting investors, leading to a reduction in competition and transparency in  the selection of houses. investment, potential risks, losses and waste. Meanwhile, the announcement of the   project and the list of projects has not been implemented seriously and publicly The monitoring process in the implementation of PPP contracts is still loose, leading to the quality is   often unsecured, subsidence, degradation but not timely overcome. The process of managing investment  projects to build infrastructure in the form of PPP in Vietnam in recent years still faces many shortcomings  from the decentralization of project management, socio­economic efficiency and financial efficiency. for the   parties involved in the implementation of PPP projects, the quality of the project, the progress and time of   the project implementation, the project fund compared to the original   Therefore, the PhD candidate has  decided to select the thesis topic “Managing investment project on infrastructure construction in the form of   Public Private Partnership in Vietnam” is a practical meaning in terms of theory and practice 2.Objective and mission of the thesis 2.1.Objective of the thesis  Develop   scientific   arguments   and   propose   solutions   to   improve   the   management   of   investment  projects on infrastructure construction in the form of PPP in Vietnam 2.2. Mission of the thesis Gathering,   systematizing   the   basic   arguments   on   management   of   infrastructure   construction  investment projects in the form of PPP; Survey, analyze and evaluate the actual management of investment   projects on infrastructure construction in the form of PPP in Vietnam; Proposing some solutions to perfect   the management of infrastructure construction investment projects in the form of PPP in Vietnam        3. Object and scope of research   3.1. Object of the thesis The object of the thesis research is the theory and practice of managing infrastructure construction  investment projects in the form of PPP 3.2. Scope of the thesis +  As   for   spatial   dimension:The   topic   has   a   research   scope   in   state   agencies   participating   in   the  management   of   infrastructure   construction   investment   projects   in   the   form   of   PPP   and   investor  organizations, management, implementation and transport operating infrastructure investment projects in the  form of PPP in Vietnam +   As   for   time   dimension:  The   project   focuses   on   researching   the   status   of   management   of  infrastructure construction investment projects in the form of PPP in Vietnam in the period from 2010 to   2017 and proposing solutions to 2025 and orientation to 2030 +As for content:  The thesis studies the theory of management of investment projects on infrastructure construction in  the form of PPP in Vietnam under the perspective of state management, including 04 contents: Strategy,   planning of PPP projects; Organization of PPP project management apparatus; Organizations implementing  PPP projects; Check, supervise, process and adjust PPP projects. In addition, the project has also selected   and analyzed a number of specific PPP projects in a number of infrastructure areas such as: Road traffic,   thermal power and water supply 4. Achievements of the thesis In terms of theory: The thesis will gather, systematize, supplement and develop theoretical issues  such as concepts, content and characteristics of investment projects on infrastructure construction in the form  of PPP. ; manage investment projects to build infrastructure in the form of PPP; evaluation criteria and   factors affecting the management of investment projects on infrastructure construction in the form of PPP In terms of practicality: Overview of the current situation of investment projects on infrastructure  construction in the form of PPP in Vietnam and analysis of the situation of some projects in infrastructure   sectors; analyze and evaluate the status of management of investment projects on infrastructure construction   in the form of PPP in Vietnam; Thereby proposing recommendations and solutions to adjust and increase the  effectiveness of management of investment projects to build infrastructure in the form of PPP in Vietnam in  the coming time Chapter 1 OVERVIEW OF RESEARCH SITUATION AND RESEARCH METHOD 1.1. Overview of research situation 1.1.1. Research situation in the country related to the topic Domestic topics have studied and solved a number of issues related to PPP and state management   for   investment   projects   on  infrastructure  construction  in  the   form   of   PPP  in  Vietnam   These   topics   are  important in providing secondary data and access theory for the research of the thesis 1.1.2. The situation of foreign research related to the thesis Overseas studies have generalized the concept, content, form and factors affecting PPP as well as   experiences of some countries on infrastructure construction investment projects in the form of PPP. This is  an important secondary source of resources to help build a theoretical framework for managing investment  projects on infrastructure construction in the form of PPP in Vietnam, orienting the scientific approach to the  thesis and providing the thesis a lot of useful information for the implementation of research on management   of infrastructure construction investment projects in the form of PPP such as transport, energy and water   supply projects in Vietnam under current conditions 1.1.3. Knowledge gap The topics have not yet considered the overall management of investment projects built in the form   of PPP of  many fields of  infrastructure with different characteristics, so the  management of investment  projects of each type has different points. especially in the process of preparing, implementing projects and  exploiting projects The topics have not been considered uniformly on the concept, content, evaluation criteria and  factors  affecting  the management  of  infrastructure  construction investment  projects  in  the  form  of  PPP.  These   are   functions   that   should   be   supplemented   and   clarified   both   on   the   theoretical   basis   and   the   management of infrastructure construction investment projects in the form of PPP in Vietnam 1.2. Research Methods 1.2.1. Data collection methods ­ Methods of primary data collection: The thesis uses survey form, collects information, evaluation  opinions of related objects to assess the research areas of the thesis. In addition, the thesis also uses interview  methods, through experts ­ Methods of secondary data collection: The thesis gathers and collects secondary data through  books,   newspapers,   specialized   scientific   journals,   relevant   dissertations,   published   data   of   Ministry   of   Planning and Investment, Ministry of Transport, Ministry of Construction, Ministry of Industry and Trade,   People's Committees of provinces and cities under central authority and enterprises participating in PPP  projects 1.2.2. Methods of general analysis The   thesis   synthesizes   data   based   on   primary   and   secondary   data,   thereby   using   descriptive   statistics   method,   deductive   method   to   base   on   quantitative   analysis   of   data   from   which   to   capture   characteristics   of   management   of   infrastructure   construction   investment   projects   in   the   form   of   PPP   of  Vietnam 1.2.3. Inheritance method The dissertation references and uses some results that have been studied before in management of  infrastructure construction investment projects in the form of PPP to supplement the arguments and apply in  the thesis. The thesis does not use this method to copy but use those results in a scientific and rational way to  clarify the theoretical and practical basis of the thesis Chapter 2 THEORETICAL BASIS ON THE MANAGING INVESTMENT PROJECT ON  INFRASTRUCTURE CONSTRUCTION IN THE FORM OF PUBLIC PRIVATE PARTNERSHIP  2.1   Overview   of   investment   projects   on   infrastructure   construction   in   the   form   of   public­private  partnership (PPP) 2.1.1. Investment project on infrastructure construction 2.1.1.1. Investment project on infrastructure construction According to the Vietnam Investment Law 2014, the investment project is a collection of proposals  to remove medium and long­term capital to conduct investment activities in specific areas, within a specified  period. An investment project to ensure feasibility must meet the following requirements: Scientific and  systematic; Legal; Unity and practicality 2.1.1.2. Concepts, characteristics and classification of construction investment projects According to Clause 15, Article 3 of the Construction Law 2014: "Construction investment projects  are   a   collection   of   proposals   related   to   the   use   of   capital   to   conduct   construction   activities   for   new  construction and repair. repairing and renovating construction works in order to develop, maintain, improve  the quality of works or products and services within a specified period and expenses. In the preparation   phase  of   construction  investment,   the  project   is   expressed  through  reports   of   pre­feasibility  studies   and   construction investment feasibility studies or economic and technical construction investment reports. build  " According   to   the   stages   of   construction   investment   projects   The   process   of   formation   and   implementation   of   an   investment   project   has   undergone     stages:   Prepare   investment,   prepare   for   implementation and implementation of the project 2.1.2. Investment projects for infrastructure construction in the form of PPP 2.1.2.1. Concept of PPP form and infrastructure construction investment project in PPP form It is understandable that the public­private infrastructure investment project is a set of proposals for   cooperation between the public and private sectors to abandon medium and long­term capital to carry out   early activities. In specific areas, within defined time periods in which resources, risks, responsibilities and  benefits are shared between the two parties to achieve a common goal 2.1.2.2. Characteristics of infrastructure construction investment projects in the form of PPP Applicable to long­term projects (most of which last 20­30 years), so it is most suitable for the field   of   infrastructure   and   environment;   Create   more   investments   for   infrastructure   construction;   Helping  stakeholders  to  share,  allocate and manage risks  in  the  project  implementation process  better  and more   effectively; Cost savings 2.1.2.3. The role of PPP investment in infrastructure development Investment projects on infrastructure construction in the form of PPP have the following roles:  Diversifying   investments   in   infrastructure  and  investment   in   the   form   of   PPP   will   create   more   growth,  development and stability for businesses. of the private sector; PPP will help to distribute and manage risks  more effectively; PPP will help infrastructure construction projects save more costs 2.1.2.4. Forms of investment projects to build infrastructure in the form of PPP There   are     forms   of   PPP   including:   Construction   ­   Business   ­   Transfer   (BOT)   contract;  Construction ­ Transfer ­ Business Contract (BTO); Construction ­ Transfer (BT) contract; Construction ­  Ownership ­ Business Contract (BOO); Construction Contract ­ Transfer ­ Rent Service (BTL); Construction  Contract ­ Service Lease ­ Transfer (BLT) and Business ­ Management (O&M) Contract 2.2. Managing investment projects on infrastructure construction in the form of PPP 2.2.1. Identify the concept of managing investment projects to build infrastructure in the form of PPP 2.2.1.1. Concept of management of infrastructure construction investment projects Management   of   infrastructure   construction   investment   projects   is   the   process   from   project  formulation,   project   appraisal,   coordination   of   resources   to   build   and   operate   projects   and   inspect   and   supervise the process of formation, development and end of the project to ensure that the infrastructure   construction project is completed on time, within the approved budget, to meet the technical and quality   requirements of products and services, by methods the best conditions allow 2.2.1.2. Concept of managing infrastructure construction investment projects in the form of PPP It can be understood that the management of infrastructure construction investment projects in the  form of PPP is the process from the formulation of strategy, planning, organizational apparatus, PPP project   formulation, PPP project appraisal, coordination of resources. to build and operate PPP projects and inspect  and supervise the process of formation and development of PPP projects to ensure benefits for investors as   well as ensure that PPP projects are completed on time and within approved budget range, meeting the  technical and quality requirements of products and services, by the best methods and conditions allowed 2.2.2   Objectives,   principles,   requirements   and   criteria   for   evaluating   the   management   of   investment   projects to build infrastructure in the form of PPP 2.2.2.1. The objective of managing investment projects to build infrastructure in the form of PPP The objective of managing infrastructure construction investment projects in the form of PPP includes:  the supreme purpose that project management activities aim at, overall goals and specific objectives 2.2.2.2. Principles for management of infrastructure construction investment projects in the form of PPP ­ Project implementation management must be consistent with the type of capital used for construction  investment   and   infrastructure   construction   investment   projects   under   PPP   must   be   strictly   managed,  comprehensive, in accordance with the order to ensure the item investment targets, quality, implementation   schedule, cost savings and project impacts on landscape, environment, community safety, defense, security   and effectiveness of PPP projects ­   Managing   investment   projects   of   PPP   projects   must   ensure   clear   benefits   and   delineation   for   investors 2.2.2.3. Basic requirements for management of infrastructure construction investment projects in the form of   PPP Basic requirements for building process for managing infrastructure construction investment projects  in   the   form   of   PPP;   Requirements   on   institutional   implementation   of   PPP;   Assurance   requirements   for  commercial,   financial   and  economic   activities   for   PPP   projects   and  requirements   for   consultations   with  parties involved in PPP project management 2.2.3. Content of the management of infrastructure construction investment projects in the form of PPP 2.2.3.1  Develop  strategies and planning of infrastructure construction investment projects in the form of   PPP Strategies and planning of investment projects for infrastructure construction in the form of PPP are  the process of arranging and managing the works to accomplish the objectives of the PPP project. Investment   in infrastructure construction in the form of PPP is an important function of competent state agencies. From  an economic perspective, it is the process of orienting the way to develop and set up short and long­term   plans to implement PPP projects 2.2.3.2. Organize the project management apparatus for infrastructure construction in the form of PPP   investment The organization of managing investment projects on infrastructure construction in the form of PPP  under the view of state management is the determination of the role and position of the government, thereby  assigning powers of each level and process. The level of project management depends on the amount of   capital,   the   size   of   each   project   will   be   managed   and   managed   by   which   level   Depending   on   the  characteristics of each project, countries have different hierarchies 2.2.3.3. Managing the implementation of infrastructure construction investment projects in the form of PPP For infrastructure construction investment projects in the form of PPP is the process of implementing  policies   to   put   policies   into   practice   The   process   of   organizing   the   implementation   of   infrastructure  investment   projects   under   PPP   includes   preparation,   implementation,   supervision   and   management   of  infrastructure construction investment projects under PPP 2.2.3.4   Check,   evaluate,   handle   violations   and   adjust   the   process   of   implementing   management   of   infrastructure construction investment projects in the form of PPP Checking, evaluating, handling violations and adjusting the process of managing the construction of   infrastructure projects in the form of PPP investment are the activities that the project management agency  performs to promptly detect and handle , adjusting the actual construction of infrastructure projects in the  form   of   PPP   investment   which   is   facing   difficulties   Detailed   assessment   of   infrastructure   construction  projects in the form of PPP investment is usually undertaken by specialized ministries 2.2.4. Criteria of evaluation of the management of infrastructure construction investment projects in PPP   form 2.2.4.1. Criteria for validity Effectiveness of management of investment projects for infrastructure construction in the form of PPP  investment   must   meet   specific   requirements   on   investment   capital,   number   of   PPP   projects,   situation,  implementation level and implementation time. PPP projects based on the objectives identified by the PPP  project stakeholders 2.2.4.2. Criteria for efficiency a) Socio­economic efficiency indicators of PPP projects are shown in 3 basic indicators: Economic net   present value (ENPV ­ Economic Net Present Value); Benefit Cost Ratio (BCR) and Economic Internal Rate  of Return (EIRR ­ Ecomomic Internal Rate of Return) b) Financial performance criteria: Total cost throughout the project life cycle; Total revenue and other  input   parameters:   loan   interest,   loan   period;   inflation   rate;   exchange   rate;   depreciation   rate   and   other   parameters 6 2.2.4.3. Criteria for feasibility The feasibility of the infrastructure construction investment project under PPP is often considered  under the legal aspects and policy support; about technology; about the market's interest 2.2.4.4. Criteria of conformity To consider the appropriateness of PPP projects based on the following criteria: Conformity with the  planning, sector and regional development plans and local socio­economic development plans; The ability to  generate revenue to return capital to investors, prioritizing the project to generate revenue from business  activities and the relevance of the information on having investors' interest 2.2.4.5. Criteria for sustainability Sustainability in infrastructure construction investment management in the form of PPP investment is  shown by the distribution of benefits between the parties involved in PPP projects, capacity and level of PPP  implementation. In addition, the sustainability of infrastructure construction investment projects in the form   of PPP is based on the environmental impact targets 2.3  Factors affecting to the management of infrastructure construction projects in the form of PPP  investment For each specific research context will significantly affect the success of each PPP project, so to assess   the factors affecting the management of infrastructure construction investment projects in the form of PPP   can be viewed consider subjective factors and objective factors 2.3.1. Subjective factors Policies of the Government and ministries and the capacity of managers of infrastructure investment   projects according to PPP 2.3.2. Objective factors The level of socio­economic development of the country: The change in each stage of development of   the state, leading to the development of all sectors Qualifications and capacity of private partners when participating in public­private partnerships: are  expressed in terms of finance, technology, management capacity,  2.4. Experience in managing infrastructure construction investment projects in PPP form of some  countries and lessons learned for Vietnam 2.4.1. Experience of Canada The form of public­private partnerships is carried out mainly in the model of DBFMO, DBFM   in  which the most common form is DBFMO The legal system in Canada ensures that public­private partnership projects have transparent, public  information, a healthy competitive environment for investors to implement contracts and build good projects 2.4.2. Experience of China The financial structure of the transport infrastructure project in the form of public­private partnerships  of China is regulated to include three sources of capital: 30% budget capital, 60% loan capital and 10%   private capital. Of the 30% of the budget, 10% comes from the central government, 20% from the local   government where the project is implemented, the loan is borrowed from the state­owned private investor 2.4.3. Experience of Malaysia In Malaysia there are no direct laws or regulations on the form of public­private partnerships. Instead,  the Government builds a legal system to initiate an overall program of attracting private resources in the   sector. the infrastructure. As a standard framework for project contracts with the goal of re­balancing the   balance between  the parties,  the Project  Development  Exclusive  Certificate  to ensure  the  benefit  of  the  private investor when proposing and implementing PPP project,  2.4.4. Lessons learned for Vietnam ­ Completing the system of mechanisms and policies to create a legal basis for the mobilization of   private capital ­ In most countries, a specialized PPP management unit is set up to supervise the construction of   contracts and the process of organizing bidding ­ Strengthening publicity, transparency, competition in building bidding process Chapter 3 ANALYSIS AND EVALUATION OFTHE REAL SITUATION OF THE MANAGING INVESTMENT  PROJECT ON INFRASTRUCTURE CONSTRUCTION IN THE FORM OF PUBLIC PRIVATE  PARTNERSHIPIN VIETNAM 3.1. Overview of the current status of infrastructure construction investment projects in the form of  PPP in Vietnam in the period of 2011 ­ 2017 3.1.1. Overview of PPP forms in Vietnam According to the Ministry of Planning and Investment since 1997, ministries and localities have signed and  implemented PPP contracts with a total of more than 200 projects, headed by the Ministry of Transport with 80  projects, Next is the projects on clean water, waste water treatment, thermal power, solid waste and hospital and  telecommunications projects   Of which BOT, BOO and BT models account for a major proportion According to the Ministry of Finance, the investment demand of Vietnam in the coming time is quite large,  in the period 2016­2020 is about 480 billion USD. In which, investment in 11 power plant projects in BOT form,  with a capacity of 13,200 MW, investment capital of about 40 billion USD; about 1,380 km of expressways with  about 11 billion USD; projects on environment, health and education about USD 29 billion; Investment sector has  been expanded and PPP model in Vietnam has become more and more diversified 3.1.2. Overview of projects prioritized investment in infrastructure construction in the form of PPP in Vietnam Since 1997, Vietnam has had more than 200 infrastructure construction investment projects in the form of  PPP. However, according to the Ministry of Planning and Investment, there are still 69 projects that need to be  prioritized for construction and exploitation. Including 42 transportation projects, 6 water supply projects, 5  wastewater treatment projects, 3 solid waste projects and 2 hospital projects The total required investment capital for these 69 priority projects is about VND 334 trillion, of which toll  roads and bridges account for about 74% of the total investment capital. Investment capital for the remaining  sectors such as water supply, wastewater treatment, solid waste and hospital, is worth VND 26 trillion (7.8% of  the total investment capital), and This field has only 16 projects 3.2. Current situation of managing some investment projects on infrastructure construction in PPP form in  Vietnam 3.2.1. Current situation of managing some investment projects on construction of transport infrastructure 3.2.1.1. Overview of the current situation of investment projects to build transport infrastructure projects in the   form of PPP Among 80 projects, the Ministry of Transport implemented 71 projects with a total investment of VND  202,556 billion, of which 20 projects have been completed and put into operation with a total investment of VND  23,799 billion with total The length is 569 km, 51 projects are in the investment implementation phase with total  investment of VND 178,757 billion with a total length of about 1700 km 3.2.1.2. Current situation of the process of managing investment projects to build transport infrastructure in the   form of PPP in Vietnam Current transport PPP projects of Vietnam follow three phases: Project preparation, investor selection and  contract signing, implementation of PPP project contract. Like the project management structure in the transport  sector in general, the management of transport infrastructure projects according to PPP is divided into 2 levels at  the central and local levels 3.2.1.3. Current situation of managing some investment projects to build transport infrastructure in the form of   PPP a) Current status of management of Phu My Bridge construction investment project Phu My Bridge project is invested in the form of construction ­ business ­ transfer (BOT) contract between  Ho Chi Minh City People's Committee and Phu My Bridge BOT Joint Stock Company (PMC). This is a cable­ stayed bridge across the Saigon River, 4 lanes, 2.4 km long connecting District 2 and District 7 of Ho Chi Minh  City. The project was proposed by the HCM City People's Committee in February 2002. Experiencing many  procedures and procedures such as making pre­feasibility study reports, submitting to the Government and line  ministries for consideration and selection of investors, developers and Appraising the feasibility study report, Phu  My Bridge BOT Contract was officially signed in February 2005. According to initial estimates, Phu My Bridge  BOT Project has a total investment of VND 1,807 billion, excluding value­added tax (VAT) and interest during  construction. The investor will finance 30% of e­commerce with equity and the rest with bank loans ­ Regarding the preparation of a research report on the feasibility of the project: + Total investment: E­commerce of the project is 1,806.52 billion VND (including the costs paid in foreign  currency is 71277 million USD and the costs payable in the local currency is 698.17 billion VND). The cost of  major construction investment is VND 1395.15 billion, accounting for 77.2%. Compensation for site clearance is  VND 100 billion + Expected fee level: To payback, PMC will be charged at 10,000 VND / 4­seat car ­ 30,000 VND /  container truck in the period 2009­2011, increased to 14,000­75,000 VND in the period 2012­2016 and VND  15,000­100,000 from 2017 to 2034 + Time for implementing BOT contract: 26 years ­ Regarding the actual cost of the Phu My Bridge BOT investment project: The total investment of the  project   actually   arises   to   VND   2,840   billion   (including   loan   interest,   which   was   originally   entered   during  construction) ­ About actual vehicle traffic: at Phu My Bridge toll booth showing that the maximum capacity of the  station is 18 lanes. The number of lanes can be operated immediately at 14 lanes. In fact, daily activities only have  2 motor lanes and 6 lanes of cars ­ Evaluate the effectiveness of Phu My Bridge BOT project management BOT contract for PMC has the right to collect fees for 26 years on the basis of the total revenue from fee   collection (VND 10,149 billion) just enough to return the owner's equity, repaying the principal and interest, and  offsetting the cost of operation and payment Corporate income tax, and investor profits Table 3.4: Results of feasibility analysis and debt repayment capacity of the project Capital Structure  Target (VND billion) Capital  Rate expenditures (%) (%) Equity 541,66 29,98 7,25 Loans 1.264,86 70,02 10,00 100,00 9,18 Total Investment 1.806,52 Average DSCR (2009 ­ 2034) IRR NPV (%) (VND billion) 8,91 91,98 9,93 149,90 1,37; DSCR > 1 (in all years) Source: Author synthesized and calculated According to the above table, it can be seen that the Phu My Bridge BOT contract, this project has a  positive financial NPV, a financial IRR greater than the cost of capital, a debt security ratio (DSCR) of 26 years  on average of 1.37 and no year when DSCR is less than 1 b) Status of management of investment projects on construction of high­speed motorways in Hanoi ­ Hai  Phong The Hanoi ­ Hai Phong highway project has a total construction length of 105.8 km, with 6 lanes and a  design speed of 120 km / hour ­ Regarding preparation of feasibility study reports of the project: + Total investment: Approved in 2008, the total investment of the project is VND 24,566 billion and  compensation and clearance costs of VND 2,500 billion + Capital mobilization: 51% from Vietnam Development Bank, 5% from Vietnam Bank for Foreign Trade,  10%  from  Vietnam  Construction and Import­Export  Corporation,  10%  from  Saigon Investment  Joint  Stock  Company and from other foreign loans. Estimated vehicle traffic: design capacity of 70,000 vehicles / day and  night. Project time: 35 years ­ In terms of actual costs and revenues: In fact during the construction process, the total investment  amounted to VND 45,487 billion, an increase of about VND 21,000 billion, an increase of nearly 86% compared  to the initial investment. With total toll revenue of the whole project reaching VND 2,091 billion, on average, the  daily turnover of this unit is about VND 5.7 billion / day ­ Regarding the actual traffic volume: in 2017, the exploitation flow reaches 25,000­30,000 turns / day and  night, only nearly 40% of the expected capacity. Meanwhile, Highway 5 is always in overload ­ Evaluate the effectiveness of high­speed project management in Hanoi ­ Hai Phong Although investors identified nearly 29 years of new capital recovery project. However, according to  Vidifi's calculations, the IRR of the Project for 35 years ranges from 9.41% to 9.78% and the NPV value is from  VND 5,356 billion to VND 6,945 billion. depending on whether or not to consider the currency depreciation  against the foreign currency 4% during the exploitation period c) Current situation of management of investment project for construction of high­speed motorway of Dau  Giay ­ Phan Thiet (DPEP): This is part of the North­South Highway located in the southern region of Vietnam. In 2013, DPEP is  planned to be the first high­speed project implemented in the form of PPP in which the Ministry of Transport will  contribute a part to the construction as a public investment while investors are expected to hope to invest in  construction of the remaining sections, operation and toll collection for both sections. Dau Giay ­ Phan Thiet  project has a positive impact on the national economic development 3.2.2. Current situation of managing some investment projects of building thermoelectricity in the form of PPP   in Vietnam 3.2.2.1. Overview of the current situation of investment projects on construction of thermal power infrastructure Although the number of investment projects in PPP energy sector in Vietnam is not too much, the actual  size and investment amount for each project is very large. For example, the BOT project of Son My 1 Thermal  Power Plant ­ Binh Thuan (investor is IPR­GDF SUE ­ Europe, Sojit Group ­ Japan and Pacific, with a total  investment of 2.2 billion USD) . Since 2010, electricity is the only industry in the national energy system with PPP  projects. The power sector has 19 thermoelectric projects invested under PPP, all of which are implemented under  BOT form. The Ministry of Industry and Trade is the agency assigned by the Government to manage and monitor  these 19 projects. Currently, thermal power projects exploited under the BOT form are expected to have a total  capacity of about 24,000MW when put into operation 3.2.2.2. Current situation of management process of investment projects to build thermoelectricity in the form of   10 PPP in Vietnam Basically, the thermo­power project management process according to PPP is like the process of transport  infrastructure. However, for the construction of thermal power infrastructure, it is based on Article 6 of Circular  23/2015 / TT­BCT on the Regulation on order and procedures for investment in thermal power plant project in the  form of PPP contract of the Ministry of Public love 3.2.2.3. Current situation of managing some investment projects of building thermoelectricity in the form of PPP   in Vietnam a) For management of Phu My 2 thermal power investment project The project includes a 715 MW combined cycle gas fired power plant, which will be built, owned and  operated on a BOT basis by an established limited liability company in Vietnam it is Mekong Energy Company  Limited (MECO). The factory will be built in the area of Phu My Power Generation Center (PMPGC) operated  by EVN and located in Phu My Industrial Complex in Ba Ria Vung Tau near Ho Chi Minh City. The project will  be implemented under the BOT contract for 20 years Private   investors   include:   MECO   Company   of   EDF   International   Group   (equity   contribution   ratio:  56.25%), Japanese Sumitomo company (owned capital: 28.125%); and 15.625% of Japan's Tokyo Electric Power  Company (TEPCO) ­ Regarding power capacity: In 2010, the total capacity is about 17,000 MW. Regarding the expected  electricity price: In the period, the electricity price will increase from 5.1 cents/kWh to about 7 cents/kWh ­ Current situation of managing Phu My BOT construction investment project 2: The process of preparing  feasibility study report of the project, the expected IRR and NPV index is the IRR of the project is 24% and NPV  is 667 million USD b) Management of investment project of BOO construction of Yen The thermoelectricity The Yen The Thermal Power Project was established to realize investment opportunities of EIC Energy &  Industrial Development Joint Stock Company and meet Vietnam's increasing electricity demand. The project  includes a coal­fired thermal power plant with a capacity of 50MW, an average annual electricity output of 292.5  million kWh. The project has a total investment of 60,991,000 USD, of which loan is 48,902,000 USD, the  average financial power price in the project life cycle is 5 cents / kWh In view of the investor NPV (EIP) = 13,157,376 USD, IRR = 15.3%, B / C = 1.09, the payback period is 12  years. However, in the past years, the risks in current conditions such as inflation, fuel price abolishment, etc., for  the project to not suffer losses, the EIC's selling price must be 7 cents / kWh or more. Even so, the project has  contributed practically to national energy security, poverty reduction and economic development in the North East  region 3.2.3. Current situation of managing some investment projects to build water supply systems in Vietnam 3.2.3.1. Overview of the current situation of investment projects on construction of water supply systems Ministry of Construction as a specialized management only focuses on building and issuing policies. The  equitization policy of state­owned companies has been enacted and this policy will affect a wide range of public  service providers, including water supply companies. Accordingly, state­owned companies will be converted into  limited   liability   companies   or   joint   stock   companies   This   policy   was   launched   in   2002   and   is   still   being  implemented. As of December 2014, there were 23 water supply companies established, in which the provincial  People's Committee kept most of these companies' shares 3.2.3.2. Actual situation of investment project management process to build water supply system in the form of   PPP The process of managing PPP projects for clean water systems is based on Decree 15/2015 and is similar to  the   process   for   transport   infrastructure   The   only   difference   is   that   for   clean   water,   it   is   the   Ministry   of  10 11 Construction or the Department of Construction to implement PPP projects in the provinces Typically, a large­scale urban water supply project such as the construction of a large capacity water supply  station will be proposed by the Department of Construction. In some cases, the Department of Planning and  Investment or relevant agencies of the PPC may also propose water supply projects to serve industrial parks or  expand urban areas and these agencies. will assume roles as a state management agency for the project they  propose 3.2.3.3. Current situation of managing some investment projects to build water supply system in the form of PPP a) Current status of management of investment projects on construction of clean water systems in the form  of PPP Regarding prices: According to a survey of the World Bank (2006), although there is a general policy that  water prices will approach the correct calculation method, enough to attract investment. There is a big gap  between the estimated selling price of water calculated by the correct and adequate calculation method. Regarding  investment capital: To encourage the use of capital sources for investment in building urban clean water supply  systems The top three obstacles selected by respondents on PPP in the water sector in Vietnam include: (i) The  price of water expected to be sold to consumers is too high; (ii) the current selling price is too low to offset the   cost; and (iii) due to lack of experience in PPP project management b) The status of management of investment projects to build rural water supply systems in the form of PPP Water supply projects in rural areas receive much support from the Government when compared to water  supply projects in urban areas. In addition to the Decrees such as for the above mentioned urban water supply  projects, Government subsidies for rural water supply projects are specifically guided in the Prime Minister's  Decision 131/2009 / QD­TTg. Government and Joint Circular No. 37/2014 / TTLT­BNNPTNT­BTC­BKHĐT of  BNN & MARD, BTC and MPI. Therefore, private enterprises can easily access Government support when  implementing water supply projects in rural areas Support for rural water supply projects including land rental, corporate income tax, investment capital and  clean water consumption price. Normally, water supply enterprises will be exempted from renting land during the  project life cycle. In addition, these enterprises only pay a part of the corporate income tax and the exemption rate  is calculated based on the current regulations of the law. Regarding investment capital subsidies, rural water  projects can receive financial support from the state budget and can call for external funding 3.3. Current status of management of infrastructure investment projects in PPP form in Vietnam 3.3.1. Current situation of subjects, principles and methods of management of infrastructure construction   investment projects in the form of PPP of Vietnam 3.3.1.1. The reality of the subject of management of infrastructure construction investment projects in the form of   PPP ­   The   Government   of   Vietnam   has   regulated   ministries   and   ministries   (Ministry   of   Planning   and  Investment,   Ministry  of   Transport,   Ministry   of   Construction,   Ministry  of   Industry   and  Trade   )   and  local  governments of provinces to coordinate and support the set, timely for the implementation of PPP projects ­  For   private  investors:   Private  investors   participate   in  managing  PPP   projects   based  on  Vietnamese  regulations on financial capacity and organization of PPP projects Box 3.1: Evaluation of PPP investment enterprises Most experts believe that enterprises investing in infrastructure in Vietnam today are usually contractors. Therefore,   the   experience   capacity   of   organizations   and   individuals   participating   in   the   management   of   the   project  implementation process is still limited, slow to handle arising situations, affecting the progress and efficiency of the  project from the project Source: Author synthesized from expert interviews ­   For   the   community:   Participation   and   sharing   of   people   and   communities   in   checking   and  12 supervising the implementation of construction projects and supervision of investors in the framework of  the cooperative project. Investment will make the project implementation process more effective 3.3.1.2   Current   status   of   implementing   principles   of   management   of   infrastructure   construction  investment projects in the form of PPP of Vietnam Firstly,   construction   investment   projects   must   be   managed   according   to   investment   plans   and  guidelines,  meeting the  requirements  prescribed in  Article  51  of  the  Construction Law  in 2014 and in   accordance with the provisions of the law. related laws Secondly, in the process of project management, it is necessary to clearly define the responsibilities   and powers of each State management agency, investment deciders, investors and real­related organizations  and individuals. Current activities, construction investment of the project 3.3.1.3   Current   situation   of   requirements   for   management   of   infrastructure   construction   investment   projects in the form of PPP of Vietnam ­ Current status of requirements for building a process for infrastructure construction projects in the   form of PPP: After identifying PPP projects according to specific sectors, the government will carry out  PPP   projects   :   Making   and   appraising   pre­feasibility   study   reports,   deciding   investment   policies   and  announcing  projects;   Prepare,   appraise  and  approve   feasibility  study  reports;   Organization  of   selecting  investors;   Negotiating,   signing   project   contracts   and   establishing   project   enterprises   (if   any);   project   implementation; settlement and transfer of works to investors to exploit infrastructure construction projects  in the form of PPP ­ Current status of institutional requirements for infrastructure construction project management in   the form   of   PPP:  According to Decree 15/2015 and  63/2018/ND­CP  of  the   Government  and  has   been  revised to the ministries, branches and committees. Provincial­level People's Committees are competent   state agencies to conclude and perform the rights and obligations prescribed in contracts for projects that   fall   under   their   functions,   tasks   and   powers   or   projects   with   the   Prime   Minister   assigned   to   act   as   a   competent state agency 3.3.2   Current   status   of   implementation   of   management   contents   of   infrastructure   construction   investment projects in the form of PPP in Vietnam 3.3.2.1. Current situation of planning infrastructure investment projects in the form of PPP ­ Status of strategy, planning of infrastructure construction investment projects under PPP The complete construction of the nation's long­term overall strategy and master plan on infrastructure  development   has   overcome   a   step   of   spontaneity,   dispersion,   fragmentation   and   enhanced   traffic  infrastructure in terms of quantity and quality. quantity. However, the implementation of the strategy and   planning of PPP projects is quite limited, strategies and planning of infrastructure areas in our country have  not been built synchronously and there is a lack of forecasting; organizing the implementation of strategies   and planning is still slow and spreading; management and protection of transport infrastructure still has   many shortcomings ­ Current situation of policy formulation for infrastructure construction projects in the form of PPP   investment of Vietnam For the construction of policies for infrastructure construction projects under PPP over the past 10  years, the Government has paid attention, in issuing, changing and supplementing policies on PPPs to suit  economic development conditions. social ­ economic. There are two important decrees promulgated and   enforced by the State in recent years. Decree 124/2011/ND­CP in 2011 was supplemented and replaced by   Decree   15/2015/ND­CP   in   2015   and   now   is   Decree   63/2018/ND­CP,   in   the   near   future   can   be  12 13 supplemented, changed by other policies, maybe the Law on PPP investment form ­   Current   status   of   financial   policies   for   infrastructure   construction  projects   in   the   form   of   PPP   investment: According to the current regulations, investors need to ensure owners' equity when implementing the  project from about 15­20%, the capital to be mobilized from banks and credit institutions is estimated at  about 80 ­ 85% of the total project investment + Regarding tax incentives: For domestic enterprises, infrastructure construction projects under the   form of PPP investment will be entitled to corporate income tax incentives in accordance with regulations   on corporate income tax under Decree 15 / 2015 / ND­CP. As for foreign investors, the regulation on   preferential tax exemption and reduction in accordance with the Law on Investment 2014 on tax rates   applicable to foreign contractors + The state of guarantee of the State for investors implementing infrastructure construction projects  in the form of PPP: In Decree 15/2015 / ND­CP, the government confirms the guarantee for real investors.  Currently the project will be guaranteed on material supply, ensuring foreign currency balance and property  ownership + Project financing structure: According to Decree No. 15/2015/ND­CP, the capital contribution of  private investors mobilized by themselves, not less than 15% of the total investment capital contributed by  investors project (for capital up to VND 1,500 billion) and not less than 10% (for capital over VND 1,500  billion) The correlation between the economic development situation of Vietnam and the attraction of capital  for infrastructure construction projects in the form of PPP investment can be clearly seen. On average, each  year, Vietnam has more than US $ 1.01 billion invested in infrastructure construction projects in the form of  PPP investment Capital for implementation of PPP projects mainly focused on the transport sector with about 69.4%,  energy   sector   about   17%,   telecommunications   sector   about   11.3%   and   clean   water   sector   about   1.8%.  However, if compared with the potential and development requirements of infrastructure construction in  Vietnam, these sectors still have a lot of potential for exploitation. Therefore, Vietnam needs to further   promote infrastructure construction projects in the form of PPP investment in the coming time ­   Status   of   land   development   plan   for   infrastructure   construction   projects   in   the   form   of   PPP   investment Firstly,   according  to  land  policies   for   infrastructure   construction  projects   in  the   form   of   PPP   in  Vietnam, it is possible to rely on the Land Laws, especially focusing on the provisions of Article 34 and   Article 56. on procedures for land acquisition, clearance, compensation, relocation   However, this fact is   still a very pressing issue in the process of compensation and site clearance in Vietnam in the years. by ­ Status of  environmental  regulations  for  infrastructure  construction projects  in the  form of  PPP  investment According to the regulations of Vietnam's natural resources and environmental policies and the latest   Decree No. 63/2018 / ND­CP, Decree No. 15/2015/ND­CP or guiding circulars of the Ministry of Natural   Resources   and   Environment   School   or   Ministry   of   Construction,   Ministry   of   Transport,   Ministry   of  Industry and Trade, Decisions of provincial People's Committees stipulate for PPP projects with capital of   more than VND 200 billion, there must always be funding solutions to environmental treatment when   implementing and implementing PPP projects Through the survey of enterprises on the assessment of the strategy and planning of PPP projects   "Creating favorable conditions for investors in selecting and participating in PPP projects" with the average   score 3.12. This is the point although not low but it is not a good score. This reflects that enterprises have   14 not really agreed with this judgment 3.3.2.2. Current situation of organizational structure and human resources for managing infrastructure   construction projects in the form of PPP investment of Vietnam The Government of Vietnam regulates the state management apparatus for PPP projects including the  National   Assembly,   the   Prime   Minister,   the   PPP   Steering   Committee,   the   Ministry   of   Planning   and  Investment   (Bidding   Administration,   Foreign   Investment   Department,   General   Department   National  economy, Foreign Economic Relations Department, Investment Supervision and Appraisal Department,  Urban and Infrastructure Department, Ministry of Transport (PPP Project Management Board, Planning  Department ­ Investment, Department of Finance, Department of Construction Management and Transport   Project Quality, Department of Transport Infrastructure, Legal Department, General Department of Roads),  Ministry of Industry and Trade (Thermal Power Projects), Ministry Finance, Ministry of Justice, Ministry  of Natural Resources and Environment, State Bank, State Audit, local authorities at all levels   Some  localities   have   established   a   number   of   implementation   teams   PPP   projects,   especially   in   big   cities.  However,   in   general,   many   localities   have   not   yet   established   groups   to   implement   infrastructure   construction projects in the form of PPP The results through surveying the status of the organization of PPP project management through a  number of judgments of enterprises participating in PPP project management as stated "Ensure the number  of human resources to complete the PPP project ”with an average score of 2.79. This is a relatively low   score and reflects that most businesses disagree with the above statement. This indicates that ensuring the   number of human resources to complete PPP projects, especially during the construction process, is not   really stable and often fluctuates 3.3.2.3. Current status of implementing management of infrastructure construction projects in the form of   PPP investment of Vietnam ­ Regarding preparation of feasibility study report of PPP project: According to Article 12 of Decree  No   108/2009   /   ND­CP   and   inherited   in   Decree   No   24/2011   /   ND­CP,   state   agencies   The   competent  authority   must   organize   a   feasibility   study   report   to   take   it   as   a   basis   for   the   preparation   of   bidding   documents and negotiation of project contracts with investors. However, many opinions suggest that the   state agency organizes a feasibility study report for all projects which is rigid, inconsistent with the ability   to allocate state budget to set up the project. and not taking advantage of the resources and experience of  investors In fact, the organization of the feasibility study report for all projects under the List is very expensive   and not feasible. Therefore, many localities were very confused in identifying projects to prepare feasibility   study reports because there was no order of priority projects in the Project List ­ Organization of contractor selection The   selection   of   contractors   will   be   conducted   in   two   ways:   bidding   or   direct   appointment   of  competent authorities. For the bid, after the proposed project is approved, the competent authority will  organize the bidding documents and conduct a public bidding. Bidding documents include the contents of  bid evaluation, bidding procedures, project documents and approved pre­feasibility study reports, expected  state participation and mechanisms investment guarantee. Meanwhile, for direct contractor designation, the  decree allows the government to directly appoint a contractor but there are no specific rules or conditions  for this selection. This leads to problems such as taking advantage of personal relationships or using money   to "run the project" ­ Organization of capital contribution The ratio of capital contribution of private investors in a PPP project in the infrastructure sector in  14 15 Vietnam is usually 30 ­ 70, meaning that the minimum equity investment of the investor is 30% of the   capital. the private sector participates in the project and is mobilized (without government guarantee) and a   maximum of 70% of the private sector's capital is involved in the project. State participation (including  state capital, Government guarantees and investment incentives) do not exceed 30% of the total investment   of the project Regulating the ratio of capital in Vietnam is relatively rigid, the investor's equity is at least 30% of   the private sector's capital involved and the mobilization is at least 21% of the total capital of the project.    In many cases, the project has a lot of big risks, it is relatively difficult to require investors to accept their   own capital of 21% 3.3.2.4   Current   situation   of   checking,   evaluating,   processing   and   adjusting   the   management   of   infrastructure construction projects in the form of PPP investment In the period of 2010­2017, Vietnam has issued many policies to inspect, check and handle violations  in PPP projects in many areas  of  infrastructure. From the period of  2010 ­ 2015,  although there  were   documents   on   inspection   and   examination   of   PPP   projects,   the   process   of   inspection   by   management   agencies has not really been carried out Many projects under PPP have brought Vietnam many successes in infrastructure investment. But   there are still shortcomings in BOT projects such as Cai Lay, Hanoi Expressway ­ Hai Phong, Tam Nong,  Ben   Thuy     Especially   the   coordination   between   the   State   and   private   investors   on   their   work   The  dissemination and propagation of PPP to the people has not been really focused. LayHop 3.4   Evaluate   management   of   infrastructure   construction   investment   projects   in   PPP   form   in  Vietnam 3.4.1. The successes Firstly, the process of managing investment projects on infrastructure construction in the form of PPP  of Vietnam is relatively consistent with the strategy and planning of infrastructure construction investment   projects in the form of PPP by 2020 and orientation. set by 2030 of the state Secondly, the organization of the management structure of infrastructure construction investment  projects in the form of PPP is gradually stabilized, completed and more suitable for each project of each   ministry and department Thirdly, the implementation process of many infrastructure construction investment projects in the  form of basic PPP has ensured the schedule, quality and time 3.4.2. Limitations and causes 3.4.2.1. The drawbacks Firstly, the quality of strategic work, planning of infrastructure investment projects in PPP form is  not high, there is no planning for projects of each specific infrastructure sector Secondly, the organization of the project management apparatus for construction of infrastructure in  the form of PPP has many problems, especially the organization of project management Thirdly,   the   process   of   organizing   the   implementation   of   infrastructure   construction   investment  projects in the form of PPP still faces many levels of inadequacy. The implementation of the method of  appointing contractors and investors in the form of BT, PPP, and BOT is quite popular in the past time and  has revealed limitations, which may lead to negative arising, group benefits and cooperation moving to  business investment environment, and social benefits Fourthly,   inspection,   inspection   and   supervision   activities   have   not   fully   played   the   role   and  influence   of   functions   in   improving   the   effectiveness   of   management   of   infrastructure   construction  investment projects in the form of PPP 3.4.2.2. The cause of restrictions 16 Firstly, the process of selecting investors is not suitable for the fields of socialization; because there   are no specific criteria and regulations for selecting investors in the form of socialization and investment   association;  It  is   not   clear  to the land  areas  proposed by  investors  to be   used  in  accordance  with the   Decision on investment policy, it is necessary to determine whether the land is subject to bidding or not  Secondly, in the situation of state budget capital for investment in developing infrastructure and   public   services   systems,   it   is   increasingly   limited,   while   Vietnam   has   a   high   level   of   public   debt.  Meanwhile, Vietnamese private investors are small, limited in capacity and resources Third, Project and financial risks of PPP projects that private enterprises need to consider: Political   risks; Process or development risks;  Fourth, institutions, policies and guidelines on public­private partnerships are incomplete, lacking in  attractiveness for private investors and there is no consensus on awareness, how to correctly understand the  forms of public­private partnerships of stakeholders (State and private) Chapter 4 SOLUTIONS FOR THE COMPLETION OF THEMANAGING INVESTMENT PROJECT ON  INFRASTRUCTURE CONSTRUCTION IN THE FORM OF PUBLIC PRIVATE PARTNERSHIP  IN VIETNAM  4.1. Domestic and international context affects the management of infrastructure construction  investment projects in the form of PPP of Vietnam 4.1.1. Domestic context ­ Vietnam's public debt is still high, according to the Ministry of Finance's report in 2017, Vietnam's  public debt is still above 61.3% of GDP, very close to the risk threshold of 65% of GDP ­ According to the Global Hub Hub (Gi Hub), Vietnam's population, especially the urban population  will increase rapidly from 2016 to 2040 will increase from 34% to 50% ­   The   banking   system   and   financial   institutions   still   have   many   concerns   for   infrastructure  construction investment projects in the form of PPP investment ­ In addition to the phenomenon of budget overspending, imbalance, trade balance, cumbersome state  apparatus,   growing   bulky,   wasteful   and   corrupt   evils     to   make   the   ICOR   very   high,   making   the  psychology of domestic and foreign private investors really potential, often afraid to invest in infrastructure  construction in the form of PPP ­ Vietnam does not yet have a system of laws on investment in the form of PPP 4.1.2. International context ­ Currently, the world economy is still in the recovery process after the crisis period, so the trend of  infrastructure construction investment in the form of PPP is getting wider and more widely accepted and   applied by many countries.  ­ In the past 5 years, ODA loans committed by donors to Vietnam are tending to decline, this will be   a challenge for Vietnam in developing the infrastructure system ­ Globalization and regional economic integration and the increasingly deepening world of Vietnam 4.2. Viewpoints and orientations to improve the management of infrastructure construction projects   in the form of public­private investment cooperation in Vietnam 4.2.1. Viewpoints to complete the management of infrastructure construction projects in the form of PPP   investment ­ First, continue to improve the legal framework for PPP 16 17 ­ Secondly, ensuring publicity and transparency of PPP projects ­ Thirdly, the mechanism of risk sharing in project implementation needs to be clearer and more  specific 4.2.2. Orientation on project management of infrastructure construction in the form of PPP in Vietnam ­ PPP and investment in the form of public­private partnership in infrastructure must be attached to   the overall socio­economic development strategy of the country, the socio­economic development strategy  of each locality. and planning and plans of relevant ministries and branches ­   The   State   establishes   a   specialized   PPP   support   agency   to   focus   on   quickly,   effectively   and   effectively the administrative procedures and incentives for infrastructure investment and PPP projects ­   Select   high­tech   infrastructure   construction   enterprises   to   call   for   private   participation   through  public­private partnerships. In the immediate future, aiming at a potential market such as Ho Chi Minh  City, Hanoi, Hai Phong, Da Nang, Binh Duong, Dong Nai, Bac Ninh,   Then there will be a summary for   PPP implementation and distribution. investment in infrastructure construction in the form of PPP in other   localities 4.3. Solutions for completion of  managing investment project on infrastructure construction in the  form of Public Private Partnership in Vietnam 4.3.1. Perfecting strategies and planning of infrastructure construction projects in the form of PPP Firstly,   the   planning   of   project   management   of   infrastructure   construction   in   the   form   of   PPP   investment is in accordance with the current institutional, planning and legal conditions of Vietnam Secondly, the planning of management of infrastructure construction projects in the form of PPP  investment must ensure the efficiency and suitability for each specific infrastructure area Third, the private sector participating in infrastructure development investment must comply with the  agreed principles and standards of environmentally and socially responsible business activities 4.3.2. Complete the management system of infrastructure construction investment projects in the form of   PPP ­ Enhancing the capacity of the management team of public­private partnerships in infrastructure  construction: Recruiting experts and training staff with qualifications and experience in the field of PPP and  having experience in projects in general and projects PPP in particular to effectively manage this work ­ Develop a mechanism to manage PPP projects. The project of PPP in infrastructure construction is  similar to PPP projects in other areas which are subject to the common legal framework ­ Specifying in more detail the contractor designation in PPP implementation: The appointment of  contractors should only be applied when there is an urgent need to use in the infrastructure system and the   competent authority to conduct prequalification bid but only one contractor participates or there is a clear   difference in a small group of participating contractors 4.3.3. Complete the organization of managing infrastructure construction investment projects in the   form of PPP ­ Improving technical and technological capacity to complete PPP project: PPP project is a project   implemented for the purpose of socio­economic development ­   Solutions   for   the   project   implementation   phase:   Control   of   investors'   conditions   in   the   project  implementation phase is mainly to control compliance with commitments in terms of technical capacity and   exam technology. public works or project implementation ­ Solutions to the stage of project settlement: The competent state agency agrees with investors to   select an independent auditing organization to audit the value of the investment capital for construction of   the project 4.3.4. Complete supervision and evaluation of PPP projects 18 Firstly, the Regulation on strict control mechanism on the content of the project contract must specify  the proposed contents in the tender as well as the contents required for investors in the bidding documents  and ensure the consistency of these contents Secondly, continue to research and improve the law on investment in the form of BOT contract in the  overall improvement of the law on investment in the form of PPP with the orientation of research and  construction, submit to the National Assembly for promulgation of the Law. create a high legal basis,  unified and synchronous for this form of investment 4.4. Some recommendations 4.4.1. For private investors + The construction design is implemented after the basic design: the rights and responsibilities of the  parties   in   the   formulation,   evaluation   and   approval   of   construction   design;   formulation,   appraisal   and  approval of adjusted construction designs + Private investors need to really focus on improving financial capacity and management capacity,  supervising construction projects to ensure project quality, progress and time of project management. PPP + Private investors should be aware and properly implement the Bidding Law on PPP projects fairly,  openly and competitively 4.4.2. For other parties involved In policies and regulations on PPP investment, it is necessary to clarify the rights, responsibilities and  scope of supervision of the Community Monitoring Board in the project stages, especially the investment  implementation phase. Moreover, the State should promulgate more specific roles and responsibilities of   Ministry of Industry and Trade, Ministry of Industry and Trade and People's Committees of cities and   provinces in transparency and publicity of the quality and fee of construction works. built in the form of   PPP on mass media CONCLUSION  In the process of socio­economic development of Vietnam, infrastructure construction investment  projects   in   the   form   of   PPP   play   a   very   important   role,   contributing   to   taking   advantage,   advanced  capabilities and technologies of participating parties. family. With specific characteristics of infrastructure  construction investment projects in the form of PPP differs from forms of investment from the state budget   or   ODA   investment   Effective   project   management   of   investment   projects   will   contribute   to   enhance   investment cooperation, operation, benefit / risk sharing for stakeholders as well as contribute to improving  quality,   progress   and   safetyfull   labor,   environmental   protection   under   contracts   between   the   state   and  investors In terms of theory, the thesis has clarified the concept and content of management of infrastructure   construction   investment   projects   in   the   form   of   PPP;   develop   evaluation   criteria   for   management   and  management of infrastructure construction investment projects in the form of PPP; factors affecting the  management of infrastructure construction investment projects in the form of PPP; At the same time, study  the   experience   of   some   developed   and   developing   countries   on   the   management   of   infrastructure   construction investment projects in the form of PPP ­ from which to draw lessons for Vietnam In   terms   of   practice,   the   dissertation   analyzes   in   depth   the   situation   of   investment   projects   on  infrastructure construction in the form of PPP of Vietnam and the status of management of infrastructure  construction investment projects in the form of PPP of some projects such as transportation projects, energy   projects and water supply projects. The thesis also analyzed the status of management of infrastructure   construction investment projects in the form of PPP of Vietnam in recent years. Since then, the thesis has   18 19 pointed out the results, limitations and causes of the situation as a practical basis for proposing solutions The main research results of the thesis: ­ Based on an overview of previous studies related to the topic, the thesis systematized and proposed  concepts, contents and criteria for evaluating and managing infrastructure investment projects in the form   public­private cooperation ­ The thesis has studied the experience of managing investment projects to build infrastructure in the   form of PPP of Canada, China, Malaysia and draw 05 lessons of valuable reference for Vietnam ­ Through the project management analysis of some infrastructure investment projects in the form of   PPP in different fields, combined with the survey results of stakeholders in the process of managing and   implementing investment projects. Infrastructure in the form of PPP, the thesis has partly clarified the  situation   of   infrastructure   investment   projects   in   the   form   of   PPP,   the   status   of   project   management,  conclusions about successes, limitations and related causes in infrastructure investment project management  in the form of PPP ­   Some   views   and   solutions   to   improve   and   increase   the   efficiency   of   managing   infrastructure   investment projects in the form of PPP have been proposed by the author to relevant agencies. These  suggestions have practical implications Based   on   the   analysis   of   the   domestic   and   foreign   context,   the   thesis   builds   viewpoints   and  orientations to manage investment projects on infrastructure construction in the form of PPP in Vietnam  more effectively, from which the author deals export some solutions to manage investment projects on  infrastructure construction in the form of PPP of Vietnam, such as: completing the strategy and planning of  infrastructure   construction   in   the   form   of   PPP;   Completing   the   management   system   of   infrastructure  construction   investment   projects   in   the   form   of   PPP;   Completing   the   organization   of   managing  infrastructure construction investment projects in the form of PPP; Complete supervision of infrastructure  construction investment in PPP form ... ANALYSIS AND EVALUATION OFTHE REAL SITUATION OF THE MANAGING INVESTMENT PROJECT ON INFRASTRUCTURE CONSTRUCTION IN THE FORM OF PUBLIC PRIVATE PARTNERSHIPIN VIETNAM 3.1. Overview of the current status of infrastructure construction investment projects in the form of ... infrastructure construction investment projects in the form of PPP Checking, evaluating, handling violations and adjusting the process of managing the construction of   infrastructure projects in the form of PPP investment are the activities that the project management agency ... 2.2.2.1. The objective of managing investment projects to build infrastructure in the form of PPP The objective of managing infrastructure construction investment projects in the form of PPP includes: 

Ngày đăng: 11/01/2020, 16:00

Từ khóa liên quan

Tài liệu cùng người dùng

  • Đang cập nhật ...

Tài liệu liên quan