1. Trang chủ
  2. » Tất cả

D0101-213.PDF

10 2 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Cấu trúc

  • 办公楼PC段电缆 cable sizing (新)

  • 办公楼PC段电缆 cable sizing (1-12)

Nội dung

21 Jan 2015 Yang Sirui Qin Gaoyuan Sun Jingyu Zhou Xiang DH1/A3-C2/DE/E/1097 23 MAY.2014 Yang Sirui Qin Gaoyuan Sun Jingyu Zhou Xiang DH1/A3-C2/DE/E/0956 15 APR.2014 Yang Sirui Qin Gaoyuan Sun Jingyu Zhou Xiang DH1/A3-C2/DE/E/0829 10 Mar.2014 Yang Sirui Qin Gaoyuan Sun Jingyu Zhou Xiang DH1/A3-C2/DE/E/0777 12 FEB.2014 Yang Sirui Qin Gaoyuan Sun Jingyu Zhou Xiang First issue DATE PREPARED BY CHECKED BY REVIEWED BY APPROVED BY DESCRIPTION OWNER VIETNAM ELECTRICITY THERMAL POWER PROJECT MANAGEMENT BOARD CONSULTANT POWER ENGINEERING CONSULTING JOINT STOCKCOMPANY CONTRACTOR DONGFANG ELECTRIC CORPORATION LIMITED SUBCONTRACTOR GUANGDONG ELECTRIC POWER DESIGN INSTITUTE EVN Ref No.: DH1/TD/795/023/001/00 DEC Ref No.: DH1_DDBSE3_D_0101_213 PROJECT: Document Status: DUYEN HAI THERMAL POWER PLANT PROJECT CONTRACT NO.: DH1-30032010 FOR APPROVAL Document Title: Cable Sizing Study For 400V/230V Cable Of Administration Building Area Document No.: Rev.: F4281S-D0101-213 DUYEN HAI THERMAL POWER PROJECT Cable Sizing and Cable Voltage Drop Study CONTENTS General Introduction Reference Documents 3 Cable Sizing Criteria Cable Installation Method Voltage Drop Current Carrying Capacity Short Circuit Calculation ATTACHMENT Table of Cable Sizing Calculation DUYEN HAI THERMAL POWER PROJECT Cable Sizing and Cable Voltage Drop Study General Introduction The purpose of this document is to show the cable selection methods for cable sizing and cable voltage drop calculation for MV and LV Power Cable including 6.6kV AC power cable and 0.6/1kV AC power cable.data Input: For sizing of the cables the following conditions will apply: a) Soil temperature for cables Not less than 30 °C at 1m depth direct buried or indirect buried ducts b) Soil thermal resistivity (Refer 1.2 °C cm/W ~(converts Kevin Unit According to SSP E- 210 Cable and 1.2Km/W) wire, item 3.2.2-Cable rating) c) Group de-rating According to Manufacture’s IEC 60087 or recommendations (which ever method gives the lowest result) d) temperatures for different In the air :30°C applications In the soil: 30°C Reference Documents - EPC Contract Technical Specification (Part VII) - POWER CABLE LIST (F4281S-D1114) - Short-Circuit Analysis Report (F4281S-D0101-203) - Documents for Relevant Load List (F4281S-D0310-201,202,203) - Technical specification for power cables(DH1-DE-A3-TD-E-0094) Cable Sizing Criteria  IEC60364-5-52Electrical_installations_of_buildings_– DUYEN HAI THERMAL POWER PROJECT Cable Sizing and Cable Voltage Drop Study Part_5-52Selection_and_erection_of_electrical_equipment_– Wiring_systems  IEC 60502 Power cables with extruded insulation and their accessories for rated voltages from kV up to 30 kV  IEC 60909-0 Short-circuit currents in there-phase a.c systems – calculation of currents  IEC 60909-1 Short-circuit currents in there-phase a.c systems – Factors for the calculation  IEC 60909-2 Electrical equipments – Data for Short-circuit current calculations  IEC 60909-3 Short-circuit currents in there-phase a.c systems – currents during two separate  EC 60909-4 Short-circuit currents in there-phase a.c systems – Examples for the calculation of short-circuit currents  IEC 60332-3-23 Tests on electrical cables under fire conditions - part 324 Test for vertical flame spread of vertically  Manual of power cable Cable is sized to fulfill the criteria of both current-carrying capacity and voltage drop Cable Installation Method The following method or their combinations is generally used to install cables:  On multi-level cable trays/cable ladder which are inside trenches  In conduit  In free air, on trays, brackets, ladders, etc  In cable ducts which are underground  Underground installation: All cables shall be run in PVC pipes encased concrete duck bank DUYEN HAI THERMAL POWER PROJECT Cable Sizing and Cable Voltage Drop Study  Above ground installation: All cables shall be run in Cable tray/Cable ladder/Conduits made of hot dipped galvanized steel with cover Covers will be provided wherever mechanical protection is required According to the cable tray/Cable ladder/Conduit routing Drawings All calculation for specific cables are based on the installation method that has the most stringent cable sizing requirements in its cable route Voltage Drop 5.1 Voltage Drop Of Normal Operation State The voltage drop is calculated in percentage of the rated nominal voltage The Calculation checks whether the voltage drop is within the required voltage drop tolerance, namely 3% of rated nominal voltage Voltage drop is defined by: ∆U(V) = √3 × I × L(R cos ∅ + X sin ∅) Where:  R and X (_/km) are the resistance and reactance of a cable per kilometer; R apply for the cable resistance of 90℃ The converting process for resistance from 20℃ to 90℃ is as following: ρ: Cable resistance for meter mm2 cable (Ω) ρ = ρ0 (1 + α(θcore − 20) ρ0 : cable resistance for meter mm2 cable (Ω) at 20℃ ρ0 =0.01851 for copper α: Temperature factor; α = 0.00393, for copper θcore : Conductor maximum temperature in rated conditions (℃) In this study, θcore = 90℃ will be used  Ur is the nominal voltage of the distribution board The default value is 230V for single phase and 400V for three –phase circuit  n is the number of conductors in parallel per phase; DUYEN HAI THERMAL POWER PROJECT Cable Sizing and Cable Voltage Drop Study  L (km) is the length of the conductor;  U x is the voltage drop values by phase system, cross section and formation of the cable according to the most common Cos  0.85 value used for this calculation According to above equation, if the result calculated by I,b' satisfies the specification, the result calculated by I b is also satisfaction 5.2 Voltage Drop Of Starting Motor State The voltage drop is calculated in percentage of the rated nominal voltage The Calculation checks whether the voltage drop is within the required voltage drop tolerance, namely 5% of rated nominal voltage Voltage drop is defined by: ∆U(V) = √3 × I × n × L(R cos ∅ + X sin ∅) Where: R and X (_/km) are the resistance and reactance of a cable per kilometer; R apply for the cable resistance of 90℃ “n” (Starting Current/Normal Current ) and cos ∅ (Starting Power Factor ) is chosen according to the following table Motor Rating >25kW <25kW Starting Current/Normal Current 6 Starting Power Factor 0.4 0.3 Current Carrying Capacity The current-carrying capacity of cable is according to the following manufacturer data of document F4281-GEDI-P-ZP-0076-0 Specification document of Jiangsu Jiangyang Cable Co., Ltd which is issued in letter No DH1-DE-A3-E-13-5338 DH!-DE-A3-TD-E-0084 Technical Specification of Power Cables which is issued in letter No DH1-DE-A3-E-13-0189 DUYEN HAI THERMAL POWER PROJECT Cable Sizing and Cable Voltage Drop Study  k is a coefficient equal to: -2 for single phase two wires system; -√3 for three phase four wires system;  I b' (A) is the current drawn by the connected load considered to correction factors  For cable installed in cable tray Ib′ = k1 ∗ k ∗ k ∗ ICable Capacity k1: is the correction factor refer to IEC 60502-2 TABLE B10 k2: is the correction factor for adjacent cables, refer to Chinese Standard GB50217-2007 Table D.0.6, k3:  is the Assymetrical Factor For cable installed in conduct under ground Ib′ = k ∗ k ∗ k ∗ k ∗ k ∗ ICable Capacity k4: is the correction factor refer to IEC 60502-2, P64 TABLE B10 k5: is the correction factor refer to IEC 60502-2, P65 TABLE B13 k6: is the correction factor refer to IEC 60502-2, TABLE B.17 k7 is the correction factor refer to Chinese Standard GB50217-2007 Table D.0.6, I b is the current drawn by the connected load without consideration to correction factors Short Circuit Calculation The short circuit capacity of the cables are calculated based on the following: I = kxS/√𝐭 where t = Permissible break time after fault in seconds DUYEN HAI THERMAL POWER PROJECT Cable Sizing and Cable Voltage Drop Study S = Conductor cross section in mm2 I = Current on dead short circuit in A K = Constant.143 for XLPE- insulated copper wire DUYEN HAI THERMAL POWER PROJECT Cable Sizing and Cable Voltage Drop Study ATTACHMENT Table of Cable Sizing Calculation DUYEN HAI THERMAL POWER PLANT PROJECT Cable Sizing From(Source point) NO To(Destination point) KKS Identity of Cable Correction factor Load Information Starting Current/Norma l Current Installed current carrying Capacity Installed current/load current K1 K2 K3 K4 K5 K6 K7 K Ib'(A) (%) Voltage (kV) Cable Constructi on Size of cable (mm2) In cable tray 0.91 0.6 0.97 / / / / 0.5296 222.92 267.36 0.6/1kV Cu/XLPE ZR-YJV22-0.6/13X150+1X70 345 0.6/1kV Cu/XLPE ZR-YJV22-0.6/13X150+1X70 267.36 0.6/1kV Cu/XLPE 260.49 153.40 0.6/1kV Location Description Location Input Power(kW) Power factor (Rated) Power factor (Starting) Ur(V) Ib (A) ABHK5221 ADMINISTRATION BUILDING PC A0BHK02 ADMINISTRTION BUILDING Emergency & Safety MCC of Administration Building A0BNC01 ADMINISTRTION BUILDING 49.1 0.85 0.4 400 83.38 ABHK5222 ADMINISTRATION BUILDING PC A0BHK02 ADMINISTRTION BUILDING Emergency & Safety MCC of Administration Building A0BNC01 ADMINISTRTION BUILDING 49.1 0.85 0.4 400 83.38 In cable tray 0.91 0.6 0.97 / / / / 0.5296 222.92 267.36 ADMINISTRTION BUILDING Emergency & Safety MCC of Administration Building A0BNC01 ADMINISTRTION BUILDING 49.1 0.85 0.4 400 83.38 In cable tray 0.91 0.6 0.97 / / / / 0.5296 222.92 ADMINISTRTION BUILDING 100 0.85 0.4 400 169.81 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 ABHK5223 ADMINISTRATION BUILDING PC A0BHK02 Cable Cable Capacity of Capacity of 30 Degree 50 Degree (A) (A) Type of Installation Description Cable Voltage Drop Steady state Cable Information Cable Voltage Drop Motor Starting Busbar Voltage Drop Steady state Busbar Voltage Drop Motor Starting Total Voltage Drop Steady state Total Voltage Drop Motor Starting Short circuit current Protection device Trip time Minimum cable size S= Io√t/k (thermal stability) L (km) n R(Ohm/km)a t 20 Deg R(Ohm/km)a t 90 Deg X(Ohm/km) ⊿Usc (%) ⊿Umc (%) ⊿Usb (%) ⊿Umb (%) ⊿Ust (%) ⊿Umt (%) (kArms) (second) (mm2) 421 0.013 0.0124 0.016 0.0279 0.008 0.060 10 2.008 10.060 46.130 0.15 125 345 421 0.013 0.0124 0.016 0.0279 0.016 0.120 10 2.016 10.120 42.909 0.15 116 ZR-YJV22-0.6/13X150+1X70 345 421 0.013 0.0124 0.016 0.0279 0.008 0.060 10 2.008 10.060 46.130 0.15 125 Cu/XLPE ZR-YJV22-0.6/13X185+1X95 395 482 0.01 0.124 0.158 0.0279 0.102 0.389 10 2.102 10.389 44.688 0.15 121 ABHK5321 ADMINISTRATION BUILDING PC A0BHK03 ADMINISTRTION BUILDING Lighting Power for Administration Building ABHK5331 ADMINISTRATION BUILDING PC A0BHK03 ADMINISTRTION BUILDING Socket Power for Administration Building ADMINISTRTION BUILDING 100 0.85 0.4 400 169.81 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 260.49 153.40 0.6/1kV Cu/XLPE ZR-YJV22-0.6/13X185+1X95 395 482 0.01 0.124 0.158 0.0279 0.102 0.389 10 2.102 10.389 44.688 0.15 121 ABHK5361 ADMINISTRATION BUILDING PC A0BHK03 ADMINISTRTION BUILDING #2 Water-cooled Screw Chiller ADMINISTRTION BUILDING 80.5 0.85 0.4 400 136.70 In cable tray and Conduit / / 0.97 0.91 0.99 1.00 0.6 0.5243 220.69 161.44 0.6/1kV Cu/XLPE ZR-YJV22-0.6/13X150+1X70 345 421 0.035 0.0124 0.016 0.0279 0.036 0.264 10 2.036 10.264 40.905 0.15 111 ABHK5362 ADMINISTRATION BUILDING PC A0BHK03 ADMINISTRTION BUILDING #2 Water-cooled Screw Chiller ADMINISTRTION BUILDING 80.5 0.85 0.4 400 136.70 In cable tray and Conduit / / 0.97 0.91 0.99 1.00 0.6 0.5243 220.69 161.44 0.6/1kV Cu/XLPE ZR-YJV22-0.6/13X150+1X70 345 421 0.035 0.0124 0.016 0.0279 0.036 0.264 10 2.036 10.264 40.905 0.15 111 ABHK5411 ADMINISTRATION BUILDING PC A0BHK04 ADMINISTRTION BUILDING Cooling water pump B ADMINISTRTION BUILDING 22 0.85 0.3 400 37.36 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 72.54 194.18 0.6/1kV Cu/XLPE ZR-YJV22-0.6/13X25+1X16 110 134 0.04 0.727 0.927 0.0801 0.969 2.694 10 2.969 12.694 3.270 0.15 9 ABHK5431 ADMINISTRATION BUILDING PC A0BHK04 ADMINISTRTION BUILDING Cooling tower B ADMINISTRTION BUILDING 7.5 0.85 0.3 400 12.74 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 23.74 186.41 0.6/1kV Cu/XLPE ZR-YJV22-0.6/1-4X4 36 44 0.036 4.61 5.878 0.0897 1.961 4.987 10 3.961 14.987 0.551 0.15 10 ABHK5451 ADMINISTRATION BUILDING PC A0BHK04 ADMINISTRTION BUILDING Chilled water pump B ADMINISTRTION BUILDING 30 0.85 0.4 400 50.94 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 89.03 174.76 0.6/1kV Cu/XLPE ZR-YJV22-0.6/13X35+1X16 135 165 0.04 0.524 0.668 0.078 0.511 1.869 10 2.511 11.869 8.266 0.15 22 11 ABHK5511 ADMINISTRATION BUILDING PC A0BHK05 ADMINISTRTION BUILDING Ventilation Power for Administration Building ADMINISTRTION BUILDING 10 0.85 0.3 400 16.98 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 42.21 248.55 0.6/1kV Cu/XLPE ZR-YJV22-0.6/1-4X10 64 78 0.01 1.8 2.295 0.0823 0.144 0.377 10 2.144 10.377 9.751 0.15 10 12 ABHK5521 ADMINISTRATION BUILDING PC A0BHK05 ADMINISTRTION BUILDING Canteen Lighting CANTEEN 30 0.85 0.4 400 50.94 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 108.81 213.59 0.6/1kV Cu/XLPE ZR-YJV22-0.6/1-4X50 165 201 0.105 0.387 0.493 0.0313 0.982 3.442 10 2.982 13.442 4.388 0.15 12 13 ABHK5531 ADMINISTRATION BUILDING PC A0BHK05 ADMINISTRTION BUILDING Canteen Ventilation CANTEEN 60 0.85 0.4 400 101.89 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 171.46 168.29 0.6/1kV Cu/XLPE ZR-YJV22-0.6/13X95+1X50 260 317 0.105 0.193 0.246 0.0284 0.987 3.609 10 2.987 13.609 8.539 0.15 23 14 ABHK5541 ADMINISTRATION BUILDING PC A0BHK05 ADMINISTRTION BUILDING Canteen Power CANTEEN 60 0.85 0.4 400 101.89 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 171.46 168.29 0.6/1kV Cu/XLPE ZR-YJV22-0.6/13X95+1X50 260 317 0.105 0.193 0.246 0.0284 0.987 3.609 10 2.987 13.609 8.539 0.15 95 15 ABHK5551 ADMINISTRATION BUILDING PC A0BHK05 ADMINISTRTION BUILDING DCS Off-line Test and Development System ADMINISTRTION BUILDING 20 0.85 0.3 400 33.96 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 138.49 407.77 0.6/1kV Cu/XLPE ZR-YJV22-0.6/1-2X70 210 256 0.04 0.268 0.342 0.03 0.628 1.748 10 2.628 11.748 4.568 0.15 12 16 ABHK5611 ADMINISTRATION BUILDING PC A0BHK06 ADMINISTRTION BUILDING Garage Lighting GARAGE 15 0.85 0.3 400 25.47 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 72.54 284.79 0.6/1kV Cu/XLPE ZR-YJV22-0.6/1-4X25 110 134 0.116 0.7 0.893 0.0801 0.985 2.747 10 2.985 12.747 2.202 0.15 17 ABHK5621 ADMINISTRATION BUILDING PC A0BHK06 ADMINISTRTION BUILDING Garage Ventilation GARAGE 20 0.85 0.3 400 33.96 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 72.54 213.59 0.6/1kV Cu/XLPE ZR-YJV22-0.6/13X25+1X16 110 134 0.116 0.727 0.927 0.0801 1.363 3.787 10 3.363 13.787 2.121 0.15 18 ABHK5631 ADMINISTRATION BUILDING PC A0BHK06 ADMINISTRTION BUILDING Fire Engine Garage Lighting FIRE ENGINE GARAGE 25 0.85 0.3 400 42.45 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 89.03 209.71 0.6/1kV Cu/XLPE ZR-YJV22-0.6/1-4X35 135 165 0.147 0.524 0.668 0.078 1.564 4.500 10 3.564 14.500 2.311 0.15 19 ABHK5641 ADMINISTRATION BUILDING PC A0BHK06 ADMINISTRTION BUILDING Guard house Power GUARD HOUSE 10 0.85 0.3 400 16.98 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 54.74 322.33 0.6/1kV Cu/XLPE ZR-YJV22-0.6/1-4X16 83 101 0.17 1.15 1.466 0.0789 1.572 4.198 10 3.572 14.198 0.920 0.15 20 ABHK5651 ADMINISTRATION BUILDING PC A0BHK06 ADMINISTRTION BUILDING Power of CCTV (MAIN GATE) GUARD HOUSE 0.85 0.3 400 3.40 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 23.74 699.04 0.6/1kV Cu/XLPE ZR-YJV22-0.6/1-2X4 36 44 0.17 0.268 0.342 0.03 0.074 0.205 10 2.074 10.205 3.905 0.15 21 ABHK5661 ADMINISTRATION BUILDING PC A0BHK06 ADMINISTRTION BUILDING Fire Engine Garage Ventilation FIRE ENGINE GARAGE 50 0.85 0.4 400 84.90 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 171.46 201.94 0.6/1kV Cu/XLPE ZR-YJV22-0.6/13X95+1X50 260 317 0.147 0.193 0.246 0.0284 1.152 4.210 10 3.152 14.210 6.178 0.15 17 22 ABHK5671 ADMINISTRATION BUILDING PC A0BHK06 ADMINISTRTION BUILDING Power of MIS System ADMINISTRTION BUILDING 20 0.85 0.3 400 33.96 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 138.49 407.77 0.6/1kV Cu/XLPE ZR-YJV22-0.6/1-2X70 210 256 0.04 0.268 0.342 0.03 0.173 0.482 10 2.173 10.482 15.482 0.15 42 23 ABNC5111 ADMINISTRATION BUILDINGEMERGENCY & SAFETY MCC A0BNC01 ADMINISTRTION BUILDING Cooling water pump A ADMINISTRTION BUILDING 22 0.85 0.3 400 37.36 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 72.54 194.18 0.6/1kV Cu/XLPE NH-YJV22-0.6/13X25+1X16 110 134 0.045 0.727 0.927 0.0801 0.582 1.616 10 2.582 11.616 5.410 0.15 15 ABNC5131 ADMINISTRATION BUILDINGEMERGENCY & SAFETY MCC A0BNC01 ADMINISTRTION BUILDING Chilled water pump A ADMINISTRTION BUILDING 30 0.85 0.4 400 50.94 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 89.03 174.76 0.6/1kV Cu/XLPE NH-YJV22-0.6/1-4X35 135 165 0.045 0.524 0.668 0.078 0.574 2.102 10 2.574 12.102 7.384 0.15 20 25 ABNC5151 ADMINISTRATION BUILDINGEMERGENCY & SAFETY MCC A0BNC01 ADMINISTRTION BUILDING Cooling tower A ADMINISTRTION BUILDING 7.5 0.85 0.3 400 12.74 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 23.74 186.41 0.6/1kV Cu/XLPE NH-YJV22-0.6/1-4X4 36 44 0.036 4.61 5.878 0.0897 0.994 2.528 10 2.994 12.528 1.086 0.15 26 ABNC5211 ADMINISTRATION BUILDINGEMERGENCY & SAFETY MCC A0BNC02 ADMINISTRTION BUILDING Power of CCTV (MAIN GATE) GUARD HOUSE 0.85 0.3 400 3.40 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 23.74 699.04 0.6/1kV Cu/XLPE NH-YJV22-2x4 36 44 0.166 4.61 5.878 0.0897 1.223 3.109 10 3.223 13.109 0.236 0.15 ABNC5221 ADMINISTRATION BUILDINGEMERGENCY & SAFETY MCC A0BNC02 ADMINISTRTION BUILDING Power of Air Condition Control System / / 1.00 0.91 0.99 1.00 0.6 0.5405 42.21 497.09 0.6/1kV Cu/XLPE NH-YJV22-2x10 64 78 0.05 1.83 2.333 0.0823 0.367 0.957 10 2.367 10.957 1.966 0.15 ABNC5231 ADMINISTRATION BUILDINGEMERGENCY & SAFETY MCC A0BNC02 ADMINISTRTION BUILDING Emergency illimination for Administrtion Building 29 ABNC5241 ADMINISTRATION BUILDINGEMERGENCY & SAFETY MCC A0BNC02 ADMINISTRTION BUILDING 30 ABNC5261 ADMINISTRATION BUILDINGEMERGENCY & SAFETY MCC A0BNC02 ABNC5281 ADMINISTRATION BUILDINGEMERGENCY & SAFETY MCC A0BNC02 24 27 28 31 0.85 0.3 400 8.49 In cable tray and Conduit ADMINISTRTION BUILDING 7.812 0.85 0.3 400 13.27 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 42.21 318.16 0.6/1kV Cu/XLPE NH-YJV22-0.6/1-4X10 64 78 0.01 1.83 2.333 0.0823 0.115 0.299 10 2.115 10.299 9.599 0.15 10 Administration Building Elevator ADMINISTRTION BUILDING 15 0.85 0.3 400 25.47 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 42.21 165.70 0.6/1kV Cu/XLPE NH-YJV22-0.6/1-4X10 64 78 0.03 1.83 2.333 0.0823 0.660 1.722 10 2.660 11.722 3.269 0.15 ADMINISTRTION BUILDING Power of MIS System ADMINISTRTION BUILDING 20 0.85 0.3 400 33.96 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 138.49 407.77 0.6/1kV Cu/XLPE NH-YJV22-2x70 210 256 0.04 0.268 0.342 0.03 0.173 0.482 10 2.173 10.482 15.482 0.15 42 ADMINISTRTION BUILDING air-conditioning Power for Administration Building 40 0.85 0.4 400 67.92 In cable tray and Conduit / / 1.00 0.91 0.99 1.00 0.6 0.5405 138.49 203.89 0.6/1kV Cu/XLPE NH-YJV22-0.6/13X70+1X35 210 256 0.05 0.268 0.342 0.03 0.433 1.550 10 2.433 11.550 12.673 0.15 34

Ngày đăng: 28/10/2019, 16:54

TÀI LIỆU CÙNG NGƯỜI DÙNG

  • Đang cập nhật ...

TÀI LIỆU LIÊN QUAN