1. Trang chủ
  2. » Tất cả

D0101-207

106 4 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 106
Dung lượng 1,6 MB

Nội dung

1 B A 18.Apr.2014 10.Mar.2014 16.Jan.2014 Li Quan Jiao Li Quan Jiao Li Quan Jiao Qin Gao Yuan Qin Gao Yuan Qin Gao Yuan Sun Jing Yu Sun Jing Yu Sun Jing Yu Zhou Xiang Zhou Xiang Zhou Xiang FIRST ISSUE FIRST ISSUE FIRST ISSUE REV DATE PREPARED BY CHECKED BY REVIEWED BY APPROVED BY DESCRIPTION OWNER VIETNAM ELECTRICITY THERMAL POWER PROJECT MANAGEMENT BOARD CONSULTANT POWER ENGINEERING CONSULTING JOINT STOCKCOMPANY CONTRACTOR DONGFANG ELECTRIC CORPORATION LIMITED SUBCONTRACTOR GUANGDONG ELECTRIC POWER DESIGN INSTITUTE EVN Ref No.: DH1/ TD/ 705/008/ 001/00 DEC Ref No.: DH1_DDBSE3_D_0101_203 PROJECT: Document Status: DUYEN HAI THERMAL POWER PLANT PROJECT CONTRACT NO.: DH1-30032010 FOR APPROVAL Document Title: Load Flow and Voltage Drop Study Document No.: Rev.: F4281S-D0101-207 Table of Contents 1.Summary 3  1.1References 3  1.1.1Single-line diagram   5  1.1.2 Technical data  . 10  1.2List of Symbols and Abbreviations  . 10  Detail Technical Data 12  2.1 Model input data of the project   12  Load flow calculation 24  3.1 Standards applied for calculation   24  3.2 Operational mode   25  3.3 Load flow results  . 29  3.3.1 Case one  . 29  3.3.2 Case two  . 36  3.3.3Case three   43  3.4 Load flow conclusion   45  Voltage Drop Study 45  4.1 Voltage Drop results   45  Summary  This report presents the load flow studies by using ETAP version 11.1.1.0C, which is based on IEC standards In order to get the accurate results, we use the ETAP load flow tools Load flow studies shall be carried out for all the critical system conditions that can occur The load flow studies shall include all branch power flows (i.e.: MW’s, MVAr’s and MVA) and the resulting voltage levels at all switchboard busbars and at selected critical MV and LV motor drives.  1.1References   GEDI Ref No F4281S-0301 Ref Name SINGLE LINE DIAGRAM Date AND Apr.2014 LAYOUT FOR 6.6KV UNIT SWGR F4281S-0302 SINGLE LAYOUT LINE FOR DIAGRAM AND 6.6KV COAL Apr.2014 HANDLING SYSTEM SWGR F4281S-0303 SINGLE LINE DIAGRAM AND LAYOUT FOR 6.6KV FGD SYSTEM Apr.2014 SWGR F4281S-0304 SINGLE LINE DIAGRAM AND Apr.2014 LAYOUT FOR 400/230V TURBINE PC F4281S-0305 SINGLE LINE DIAGRAM AND Apr.2014 LAYOUT FOR 400/230V BOILER PC F4281S-0306 SINGLE LINE LAYOUT DIAGRAM FOR AND Apr.2014 400/230V EMERGENCY PC F4281S-0307 SINGLE LINE AND Apr.2014 DIAGRAM AND Apr.2014 400/230V COAL DIAGRAM LAYOUT FOR 400/230V ESP PC F4281S-0308 SINGLE LAYOUT LINE FOR HANDLING PC F4281S-0309 SINGLE LINE DIAGRAM AND Apr.2014 LAYOUT FOR 400/230V ASH HANDLING PC F4281S-0310 SINGLE LINE DIAGRAM LAYOUT FOR 400/230V AND Apr.2014 WATER TREATMENT PC F4281S-0311 SINGLE LINE DIAGRAM LAYOUT FOR 400/230V AND Apr.2014 WASTE WATER TREATMENT PC F4281S-0312 SINGLE LINE LAYOUT FOR DIAGRAM AND 400/230V FGD DIAGRAM AND Apr.2014 SYSTEM PC F4281S-0313 SINGLE LINE Apr.2014 LAYOUT FOR 400/230V CCW PUMP HOUSE MCC F4281S-0314 SINGLE LINE LAYOUT DIAGRAM FOR AND Apr.2014 400/230V ADMINISTRTION BUILDING PC F4281S-0315 SINGLE LINE DIAGRAM AND Apr.2014 LAYOUT FOR 400/230V OFF-SITE ASH YARD PC F4281S-0316 SINGLE LINE DIAGRAM AND LAYOUT FOR 400/230V COMMON SYSTEM PC We calculated the results using ETAP 11.1.1,with the reference as above:  1.1.1Single-line diagram   Apr.2014 U1 19052 MVAsc CB45 DUYEN HAI 220kV SWITCHYAR 0LAC10 AP100 M01 232 kV GEN.TRANS.#1 750 MVA CB5 Open 10BAT01 STANDBY TRANS #01 CB47 GEN.TRANS.#2 750 MVA 56/38/38 MVA A0BCT01 20BAT01 Bus53 22 kV ISOLATED PHASE BUS I 10BAA31 CB55 CB52 CB56 CB51 10BAC01 Bus54 6.9 kV 6.9 kV GENERATOR #1 10BBT01 622.5 MW UNIT #1B TRANS Open 10BBS12 28 MVA CB2 10BBS32 Open CB53 Open CB7 Open UNIT #1A TRANS 56/38/38 MVA 10BBS22 Open 20BBS12 CB48 CB54 Open 20BBS22 ISOLATED PHASE BUS II 22 kV 20BAA31 20BBS32 CB57 CB19 6.6KV UNIT2 BUSBAR 2B 10BBT02 20BAC01 6.6KV UNIT2 BUSBAR 2A 10MKA01 6.6KV UNIT1 BUSBAR 1A 6.6KV UNIT2 BUSBAR 2C UNIT #2A TRANS 6.6KV UNIT1 BUSBAR 1C 56/38/38 MVA GENERATOR #2 20BBT01 622.5 MW 6.6KV UNIT1 BUSBAR 1B UNIT #2B TRANS 28 MVA 20BBT02 20MKA01 Network of UNIT #1A TRANS Bus53 Bus54 Network of UNIT #2A TRANS Bus53 Bus54 Bus53 Bus54 Network of UNIT BUS C   Figure Model of Main Network Bus53 UNIT #1A TRANS UNIT #1A TRANS Bus54 CB14 CB13 10BBA 6.6 kV 6.6KV UNIT1 BUSBAR 1B 10BBB 6.6KV UNIT1 BUSBAR 1A 6.6 kV CB21 CB128 CB131 CB94 CB85 1BBB6021 1BBB6020 CB95 1BBA6013 CB83 Bus86 1BBA6004 10BBA6014 Bus94 CB223 CB82 Bus87 Bus93 CB22 Bus88 CB81 CB26 CB143 #2 Coal Mill 2300 kW Bus85 X0HFB20 1BBB6018 #1 Ash air compressor Bus84 X0HFB10 AF001 #1 Draft Fan 5400 kW CB84 CB219 CB130 #1 S.A.C 250 kW X0HFB40 350 kW A 0QFA11 AN001 CB129 Open 10BBA6011 A 0ETP10 AN011 X0HLB10 CB217 Desulfurization Busbar 1A 10BBD AN001 CB216 CB227 #1 Condensate Pump 2100 kW #1A Turbine Trans 1600 kVA Bus89 10BBD6001 CB17 X 0LCB10 AP100 M01 #3 Areation Fan 1600 kVA 1400 kW #2 Areation Fan A0BHT61 10A0HTJ10AP001 X0HFE20 1400 kW 1400 kW 3500 kW 0.42 kV FGD Systerm PC #1 Boost Up Fan 0PAC11 AP001 10BBB6002 10BBB6008 X 0PGA00 AP002 M01 X 0LCB20 AP100 M01 Bus82 A0HTG12AN011 A0HTG11AN011 #2 C.C.W.P 630 kW AN001 #2 Condensate Pump 2100 kW 10BBB6011 A0HTG13AN011 #1 Areation Fan 10BFT10 #1 Circulating Water Pump A 0ETP10 AN014 X 0LAC20 AP100 M01 AN001 #2 Primary Air Fan 1600 kW #1 Desulfurization Trans #1 Seawater booster pump 1300 kW #2 Ash air compressor 350 kW #2 S.F.P.B.P 580 kW CB228 X0HLB20 Bus91 10BBD6005 CB222 #2 Secondary Air Fan 2000 kW 10BBD6004 Bus90 CB215 Bus79 X 0PGA00 AP001 M01 #2 S.A.C 250 kW A 0QFA12 AN001 X0HNC20 AN001 CB79 CB225 Bus73 #1 C.C.W.P 630 kW #1 Primary Air Fan 1600 kW X0HFE10 10BBA6008CB224 Bus70 AF001 #2 Draft Fan 5400 kW Desulfurization Busbar 1B 10BBE CB226 X 0LAC10 AP100 M01 AN001 X0HFB30 6.6 kV 6.6 kV 10BBA6002 #1 S.F.P.B.P 580 kW CB220 AF001 #3 Coal Mill 2300 kW Open X0HNC10 AN001 #1 Secondary Air Fan 2000 kW #4 Coal Mill 2300 kW CB218 CB27 AF001 #1 Coal Mill 2300 kW Open CB153 CB221 CB18 1BBA6007 Bus83 10BBD6015 1BBA6019 Bus92 1BBA6009 CB15 CB16 Bus95 1BBA6012 1BBA6003 CB23 A0BHM Bus80 #2 Circulating Water Pump 3500 kW Bus81 0PAC12 AP001 6250 kW CB271 10HTJ10AN001 #1A Boiler Trans CB568 600 700 kVA Common MCC #1A Precipitator Trans 2500 kVA 10BFT30 2000 kVA 10BFT50 #1B Boiler Trans 0.42 kV #1B Precipitator Trans 2000 kVA #1 Unit GGH-HP Water Pump A0BKC 2500 kVA #1B Turbine Trans 10BFT40 90 kW 10BFT60 1600 kVA 10BFT20 Lump200 243 kVA Bus101 Cable8 CB90 Precipitator PC 1A 0.42 kV #1 Turbine PC B 0.42 kV 10BFB #1 Boiler PC A CB203 CB60 Bus118 Cable12 Cable16 Lump9 260 kVA 160 kW #1 Boiler MCC1 A0BLA CB70 #1 Turbine MCC1 0.42 kV #1 Moisture Heating MCC 0.42 kV 0.42 kV #1 Slurry Pump #1 Turbine MCC3 90 kW 110 kW 10BJA 10BJC Lump16 193 kVA C.M.W.Pump 90 kW #1 Turbine MCC2 Load18 147 kVA Lump128 88.8 kVA 10BJF 0.42 kV CB67 Open CB64 Lump8 351 kVA CB365 coal bunker bay MCC Open #1 S.V Pump 0.42 kV CB194 CB87 CB204 CB200 Open Open CB192 CB68 CB61 CB422 CB373 0.42 kV Lump97 557 kVA #1 Sealing Fan Lump11 185 kW 50 kVA #1 Motor Of oil pump CB193 10BFC 0.42 kV A0BLE Lump101 106 kVA CB395 A0BLD 0.42 kV #1 Boiler PC B 10BFD CB205 CB201 CB202 CB88 CB89 Open CB91 #1 Boiler OpenMCC3 Lump109 80 kVA 0.42 kV 10BJG #1 Boiler MCC2 0.42 kV #2 S.V Pump 160 kW #2 Motor Of oil pump 90 kW #2 Slurry Pump 110 kW 0.42 kV Lump13 88 kVA CB62 #2 Sealing Fan CB63 Open Lump20 52.3 kVA CB96 0.42 kV Open Open #1 Emergency PC C 10BMC 185 kW CB93 0.42 kV #1 Emergency PC B CB69 10BMB CB583 CB59 CB99 FGD Emergency MCC #1 DIESEL ENGINE GENE 0.42 kV A0BNB 1800 kW Lump53 736 kVA 0.42 kV 0.42 kV A0BKD A0BLE Lump205 170 kVA Figure Model of UNIT #1A TRANS  Lump14 48.5 kVA Lump111 106 kVA Lump68 402 kVA Precipitator PC 1B 0.42 kV 10BFE 10BFF CB98 CB404 CB401 A0BLB #1C.C.B.MCC Open 0.42 kV #1 Emergency PC A Lump52 729 kVA Open CB310 0.42 kV 10BJH 10BJB Lump17 51.8 kVA 10BMA 0.42 kV CB210 #1 Chemical Dosing MCC #1 Turbine PC A Condensate Polishing MCC 10BFA #1 DeniTration MCC 0.42 kV #2 DeniTration MCC Open Lump114 63 kVA CB206 Open Cable6 Bus99 Cable5 Bus100 Lump58 1188 kVA Lump59 1188 kVA UNIT #2A TRANS UNIT #2A TRANS Bus54 Bus53 CB117 CB97 6.6 kV 6.6KV UNIT2 BUSBAR 2A 6.6 kV 20BBA CB152 2BBA6013 6.6KV UNIT2 BUSBAR 2B 20BBB 20BBA6015 2BBB6021 2BBB6020 2BBA6012 Bus110 2BBA6019 2BBA6004 Bus113 20BBA6014 Bus114 Bus109 CB114 CB46 2BBB6018 Bus112 2BBA6007 CB44 CB80 CB112 2BBA6003 Bus108 CB151 Bus111 CB36 6.6 kV CB65 CB76 Open CB150 Open Bus107 CB58 6.6 kV 20BBE Desulfurization Busbar 2B 20BBD Desulfurization Busbar 2A Bus106 20BBA6011 CB42 20HFB20 AF001 #3 S.A.C #3 Ash air compressor 280 kW 250 kW #5 Coal Mill 2300 kW 20HFB10 AF001 CB39 CB38 A 0QFA13 AN001 CB41 Open #3 Draft Fan 5400 kW Bus102 Open CB191 CB73 Bus120 #4 S.A.C 250 kW X0HNC20 AN001 #2 Desulfurization Trans 1600 kVA X0HLB20 AN001 CB234 CB66 A0BHT62 #4 Primary Air Fan 1600 kW #6 Areation Fan 1400 kW #4 Areation Fan 0PGA00 AP001 M01 X0HFE20 AN001 1400 kW #3 Condensate Pump 2100 kW CB109 A0HTG16AN011 A0HTG14AN011 CB123 0LCB10 AP100 M01 X 0LAC20 AP100 M01 #4 C.C.W.P 630 kW X 0PGA00 AP002 M01 #4 Condensate Pump 2100 kW #2 Boost Up Fan #3 Circulating Water Pump 3500 kW #4 S.F.P.B.P 580 kW #4 Secondary Air Fan 2000 kW 20A0HTJ10AP001 Bus115 #4 Ash air compressor 350 kW A 0QFA14 AN001 A 0ETP10 AN018 CB77 #4 Draft Fan 5400 kW CB72 #3 C.C.W.P 630 kW #3 Primary Air Fan 1600 kW 0LCB10 AP100 M01 X0HFB30 AF001 1600 kW 0LAC10 AP100 M01 20HLB10 AN001 CB78 #7 Coal Mill 2300 kW #2 Seawater Booster pump Bus116 #8 Coal Mill 2300 kW X0HFB40 AF001 CB233 #3 S.F.P.B.P 580 kW #3 Secondary Air Fan 2000 kW CB113 CB231 CB230 20HNC10 AN001 Bus124 Bus103 CB74 20BBD6006 Bus121 20BBD5 20BBD6001 Bus96 A 0ETP10 AN017 CB75 Bus104 20BBD6005 20BBA6008 X 0LCB20 AP100 M01 6250 kW 0.42 kV FGD Systerm PC #4 Circulating Water Pump 3500 kW #5 Areation Fan 20HTJ10AN001 CB270 1400 kW A0BHN 0PAC11 AP001 CB111 CB119 0PAC12 AP001 A0HTG15AN011 CB149 CB118 #2 Unit GGH HP Water Pump #2A Boiler Trans #2A Precipitator Trans 2500 kVA #2A Turbine Trans 2000 kVA 2000 kVA 90 kW 1600 kVA Lump48 700 kVA 20BFT50 20BFT30 20BFT10 #2B Boiler Trans #2B Precipitator Trans 20BFT40 #2B Turbine Trans 2500 kVA 1600 kVA 20BFT20 Bus117 Cable10 CB144 0.42 kV Open 20BFA #2 Turbine PC B 0.42 kV 20BFB #2 Boiler PC A 20BFC CB256 CB260 #2 Moisture Heating MCC Bus119 0.42 kV 20BJA Lump26 260 kVA #2 Turbine MCC3 20BJC 0.42 kV CB145 20BJD A0BLA 185 kW coal bunker bay MCC3 #3 Motor Of oil pump 90 kW H.P.F.W.P Open 55 kW CB122 CB121 Open #2 Boiler MCC3 #3 Slurry Pump 110 kW Precipitator PC 2B 0.42 kV CB110 Cable1 Cable3 Open Open Open CB107 Bus97 #2 Boiler MCC1 0.42 kV 20BFE Bus98 20BJH #2 Turbine MCC2 20BJF #3 S.V Pump 0.42 kV 160 kW Lump27 351 kVA 0.42 kV CB268 #3 Sealing Fan CB147 0.42 kV #2 Turbine MCC1 0.42 kV 20BFD CB106 CB346 Cable18 CB148 Open CB425 CB269 CB259 CB105 CB101 #2 Boiler PC B Precipitator PC 2A CB267 Cable14 0.42 kV CB264 #2 Turbine PC A CB273 0.42 kV CB266 CB40 2BBA6009 20BBD6004 20BBA6002 #6 Coal Mill 2300 kW CB265 CB43 Lump22 54.8 kVA Lump131 80 kVA 0.42 kV Lump21 193 kVA 20BJB Lump23 147 kVA Load24 50 kVA #2 C.M.W.Pump 90 kW CB127 #4 Motor Of oil pump 90 kW #2 Boiler MCC2 Lump29 88.5 kVA 0.42 kV 20BJG #4 Slurry Pump 110 kW #4 Sealing Fan Open Lump25 52.3 kVA Lump30 48.6 kVA #4 S.V Pump 160 kW CB102 Open CB124 CB120 20BMA 0.42 kV 0.42 kV 20BMA #2 EMERGENCY PC C 0.42 kV Open #2 EMERGENCY PC B Open #2 EMERGENCY PC A CB126 CB125 Load21 736 kVA Load20 729 kVA CB103 #2 DIESEL ENGINE GENE 1800 kW Figure Model of UNIT #2A TRANS 185 kW Lump60 1188 kVA Lump63 1188 kVA 20BFF 20BFT60 Bus53 UNIT #1B TRANS UNIT #2B TRANS CB30 CB29 6.6KV UNIT1 BUSBAR 1C 10BBC 6.6 kV Bus54 CB1 CB3 CB8 20BBC 6.6KV UNIT2 BUSBAR 2C 6.6 kV CB11 CB9 CB175 CB284 CB173 CB165 Open CB168 #1 S.H.G 1000 kW 6700 kW #1 Office Trans CB37 #9 Coal Mill 2300 kW CB33 A0BHT60 CB32 Open X 0LAC30 AP100 M01 #1 Common Trans #5 Ash air compressor 350 kW 6.6 kV 6.6kV Coal Busbar A 2000 kVA CB236 CB154 A0BHT11 0.42 kV 1600 kVA Open 430 kW 0EBE11 AJ001 CB164 CB524 CB537 #1 Coal Crusher 400 kW A0BHT21 Water-cooled Screw chille 161 kW #1 Lighting Trans CB544 CB275 Open Open BUlldozer House 0.42 kV Open CB531 CB238 CB170 CB276 #1 Water Treatment Trans #1 Wasted Water Trans #1 Maintenance Trans 800 kVA CB533 C3B Tape converyer 440 kW CB239 C2 Belt Conveyor 185 kW A0BLG 0.42 kV Lump162 103 kVA CB281 CB282 #6 Ash air compressor 350 kW 1000 kVA 1000 kVA 0EAC12 AF006 C3A Tape converyer 440 kW A0BHT32 A0BHT22 #3 Aerating Fan 55 kW A 0ETP10 AN101 Open Open CB526 #2 Aerating Fan 55 kW 0EAC11 AF003 CB278 #2Water Treatment Trans #2 Spray Pump 75 kW T2 Transfer Tower MCC A0BHT31 #2 Ash Trans 0.42 kV Lump160 81.5 kVA 1000 kVA A0BHT41 10BFT51 0EAC12 AF003 MCC Open CB530 A0BHL CB283 CB280 #2 Wasted Water Trans C6AB Tape converyer 250 kW CB543 A0BLK A0BLF #1 Spray Pump 75 kW CB167 CB523 #2 Feed Pump 6700 kW 0LAC30 AP100 M01 CB241 Lump39 49 kVA T1 Transfer Tower MCC 500 kVA 1600 kVA CB240 0.42 kV A0BHB CB157 CB527 1000 kVA Off-site Ash yard PC 0.42 kV CB178 CB158 0EAF10 AE201 #1 Ash Trans CB243 20HFB50 AF001 Coal PC B A0BHA #11 Coal Mill 2300 kW CB242 CB156 Coal PC A #2 Coal Crusher 1600 kVA 400 kW #1 Aerating Fan 55 kW CB172 A0BHT42 C4 Belt Conveyor 0EBE12 AJ001 Lump66 540 kVA #2 Lighting Trans 185 kW #2 Common Trans 0EAC11 AF005 #2 Maintenance Trans A0BHT52 0.42 kV A0BLH Lump163 500 kVA 2000 kVA T3 Transfer Tower MCC 10BFT52 20BFT51 #2 Coal reclaimer 430 kW 132 kVA 800 kVA 0EAF20 AE201 C5AB Tape converyer 220 kW 20BFT52 T4 Transfer Tower MCC Sluicing Pump House MCC 0.42 kV CB197 CB163 CB162 A0BLY 0.42 kV A0BLI Lump168 95.4 kVA 163 kVA Lump177 CB182 CB184 CB187 CB189 CB209 CB199 0.42 kV Common System PC A 0.42 kV Common System PC B 0.42 kV Water Treatment PC B Water Treatment PC A 0.42 kV Open Open CB244 CB211 CB196 CB245 CB195 CB198 CB134 CB159 #1 Screen Wash Pump 132 kW Lump37 661 kVA Lump38 661 kVA Lump46 133 kVA Ash PC A A0BHF Waste Water PC B CB133 0.42 kV A0BLR CB248 CB249 Open #2 Service Water Pump 132 kW CB183 CB180 CB132 CB25 Open Pump A0BHE CB20 Open CB181 CB115 Open Open CB250 Open 0.42 kV CB116 CB475 CB251 Lump31 68 kVA C.W.T MCC Lump41 103 kVA Lump35 170 kVA Lump40 255 kVA 0.42 kV A0BLS Lump36 170 kVA Diesel Tank MCC 0.42 kV #2 Dimineralized Pump 75 kW #2 Secondary RO Pump 75 kW #1Site Transfer Oil Pump 75 kW A0BKA CB469 CB464 CB185 Open CB24 A0BLO Waste Water Treatment MCC Open #1 Primary RO Pump 132 kW Ash PC B A0BHC #1 Flush Water Pump 110 kW #2 Primary RO Pump 132 kW CB186 Open CB473CB476 0.42 kV Auxiliary Boiler Hous MCC Daily Oil Area MCC A0BLZ Lump151 50 kVA Lump43 77.4 kVA 0.42 kV A0BKB Coal-bearing Waste Water Lump44 84.3 kVA Figure Model of UNIT BUS C #1 Maintenance PC A 20BFH 0.42 kV #2 Maintenance PC B 0.42 kV 10BFH CB208 CB213 CB297 Load6 199 kVA Open Load7 197 kVA Load8 320 kVA Open Load9 320 kVA Lump49 CB465 81 kVA Air Compressor Room MCC Plant Oil Pump House MCC Lump45 179 kVA #2 Lighting PC B 20BFG 0.42 kV A0BLL Lump150 350 kVA A0BLQ CB254 Open Open Flush Water Pump MCC Lump32 68 kVA 0.42 kV A0BLN 0.42 kV #1 Lighting PC A CB296 Lump149 120 kVA Lump42 65.9 kVA CB212 CB214 Open A0BLM #2 Site Transfer Oil Pump 75 kW 10BFG 0.42 kV 0.42 kV Fresh Water Treatment MCC A0BHD CB255 Open CB207 0.42 kV CB188 Open CB160 Open 75 kW #1 Secondary RO Pump 75 kW A0BLX Waste Water PC A CB253 132 kW #1 Dimineralized 0.42 kV 0.42 kV A0BHH CB247 #1 Service Water Pump Common System MCC 0.42 kV 0.42 kV CB161 A0BHJ CB246 A0BHI CB274 A0BHG A0BHT70 #12 Coal Mill1 2300 kW 20HFB60 AF001 A0BHT12 CB155 #1 Coal reclaimer Lump51 400 kVA 630 kVA #2 Coal Trans 1600 kVA CB272 Off-site Ash Yard Trans CB31 CB235 #1 Coal Trans CB237 CB169 CB34 CB28 Office PC 0.42 kV A0BHK 6.6kV Coal Busbar B A0BCB A0QCL99 AP102 6.6 kV A0BCA CB171 A 0ETP10 AN015 A0BHT51 CB35 #2 S.H.G 1000 kW AP001X0HFB50 AF001 CB10 1000 kVA CB174 CB12 AP001X0HFB60 AF001 #1 Feed pump A0QCL99 AP101 CB177 CB277 CB166 Fire Pump 315 kW #10 Coal Mill A 0SGA12 AP001 2300 kW 0.42 kV #2 Flush Water Pump 110 kW #1 Turbine House Crane 170 kW #2 Turbine House Crane 170 kW 1.1.2 Technical data Generator Document Chanel NO: DH1-DE-A3-E-12-3014 Transformer Document Chanel NO: DH1-DE-A3-E-13-0164 1.2 List of Symbols and Abbreviations All the common symbols are listed below in the picture,and the form left show the name of all the Symbols as the same All the Abbreviations are as following: PS,PT,ST mean Zps、Zpt、Zst Zps = Leakage Z between the Primary and Secondary windings with the Tertiary winding open circuited Zpt = Leakage Z between the Primary and Tertiary windings with the Secondary winding open circuited Zst = Leakage Z between the Secondary and Tertiary windings with the Primary winding open circuited              

Ngày đăng: 28/10/2019, 16:54

w